Weekly Update
_____________________________________________________________________________________________

Wilshire/La Cienega Station

A weekend closure of Wilshire Boulevard between La Cienega Blvd. and San Vicente Blvd. and lane restrictions will take place for routine decking work from Fri. Dec. 15  at 8 p.m.  through Mon. Dec. 18 at 6 a.m. The detours for weekend closures are depicted in the map below.

East west detour map

Local access will be maintained for businesses and residents outside the work zone. Pedestrian access will also be maintained with sidewalk and crosswalk detours on La Cienega and Wilshire Boulevards.

Bus Stops - Metro 720/20 Wilshire Boulevard bus stops for Wilshire/La Brea, Wilshire/Fairfax and Wilshire/La Cienega have been relocated to temporary locations away from the construction zone and will remain in place until construction is completed. For information regarding changes to Metro service, please call 323.GoMetro or visit: https://www.metro.net/service/advisories/

Wilshire/Rodeo Station

Drilling to collect soil samples that will be used to guide Metro Purple Line subsurface construction will take place on Wilshire Blvd. between N. Clark Dr. and N. Robertson Blvd., starting Dec. 15 weeknights only from 8 p.m. to 6 a.m. likely concluding on Dec. 21.*

Soil sample drilling will also occur  starting Dec. 21 on Wilshire Blvd. between N. Arnaz Dr. and N. Hamel Dr., weeknights only from 8 p.m. to 6 a.m. likely concluding on Dec. 29.*

This geotechnical work will require traffic lane reductions, but local access for drivers and pedestrians will be maintained outside of construction zones.

 Due to the dynamic nature of construction, all proposed dates and times are subject to change. 

 

 ______________________________________________________________________

Upcoming Events

Sections 1 and 2: La Cienega Station and Rodeo Station Monthly Update Meeting

When

Wednesday, December 13, 2017 from 6:30pm – 8pm

Where

Beverly Hills City Hall (455 North Rexford Drive, Beverly Hills, CA 90210)

Description

This is a series of monthly meetings for Beverly Hills stakeholders interested in Metro construction and pre-construction for the Wilshire/La Cienega and Wilshire/Rodeo Stations in Beverly Hills. 

Additional information can be found in https://www.metro.net/projects/westside/events/

____________________________________________________________________

Construction Information

WILSHIRE BOULEVARD DECKING CLOSURES

 Wilshire Boulevard will be closed off entirely for decking and completion of piling during 17 weekends starting September 8 through February 2018.  

  • Detours are anticipated on La Cienega Boulevard between Olympic Boulevard and Third Street and on Wilshire Boulevard between San Vicente Boulevard and Doheny Drive with traffic officer support (See Phase 1, 2 and 3 Detour Maps)
  • Local access will be maintained for businesses and residents throughout the work zone
  • Pedestrian access will be maintained with sidewalk and crosswalk detours on La Cienega Boulevard and Wilshire Boulevard
  • Bus Stops
    • The 20 and 720 buses remain relocated to eastbound at Wilshire Boulevard near Stanley Drive and westbound at Wilshire Boulevard near San Vicente Boulevard
    • The 105 and 705 buses are relocated for the next eight to ten months to northbound La Cienega Boulevard and Gregory Way

What is Decking?

Decking is temporary roadway installed during construction that will allow for station construction underneath traffic.

What is Piling?

Piling, now underway, is the process of installing steel beams to structurally support the decking and station construction. The piling on the south side of Wilshire Boulevard is complete and the north side of Wilshire Boulevard is underway.

Work Schedule, Detours and Access During Weekend Closures*

  • Full street closures for 17 weekends starting September 8, 2017
  • Work will be continuous from Friday at 8:00 pm until Monday at 7:00 am
  • No work will take place on major holiday weekends, which include Rosh Hashanah (Sept. 23 - 24), Yom Kippur (Sept. 30 - Oct. 1), Veterans Day, Thanksgiving, Christmas, New Years, and President's Day

 

Phase 1: Piling across Wilshire Boulevard Completed

Full closure from San Vicente Boulevard to La Cienega Boulevard See: Phase 1 Proposed Eastbound / Westbound Detour Map

Phase 2: Decking Completed

Full closure of Wilshire Boulevard from San Vicente Boulevard to La Cienega Boulevard

See: Proposed Eastbound / Westbound Detour Map

Phase 3: Decking

November 3-6, 17-20

December 1-4, 8-11, 15-18

January 5-8, 13-15, 19-22, 26-29

February 2-5, 9-12

Full closure of Wilshire Boulevard from San Vicente to La Cienega Boulevard See: Phase 3 Proposed Eastbound / Westbound Detour

____________________________________________________________________

Links

Metro Notice

Safety Tips

Metro Bus and Rail Schedules

Business Interruption Fund

Purple Line Extension Project Details

 _____________________________________________________________________________________________

Documents and Presentations

 

Chamber Government Affairs Committee August 2017

 

Metro Presentation July 2017 - Section 1 Construction Community Meeting

 

Metro Presentation June 2017 - Section 2 Pre-Construction Community Meeting

 

Chamber of Commerce May 2017 Meeting

 

Community Meeting Presentation February 2017

 

Community Meeting - January 2017

 

Metro Presentation November 2016 - Section 1 Construction Community Meeting

 

Metro Presentation October 2016 - Section 2 Pre-Construction Community Meeting

 

Metro Presentation August 2016 - Purple Line Extension Community Meeting:

 

City Presentation August 2016 - Purple Line Extension Community Meeting

 

Community Meeting Presentation November 2015

 

Purple Line Advanced Utility Relocation Memorandum of Agreement

 

Additional Resources

 _____________________________________________________________________________________________

Transportation and Parking
For public transportation use the Trip Planner at metro.net or call 323.go.metro. Two-hour free parking is available at the Civic Center Garage located at 450 N. Rexford Dr.

station map

 _____________________________________________________________________________________________

BUSINESS RESOURCES

Metro Business Interruption Fund (BIF) information and additional resources for your business.  

 _____________________________________________________________________________________________

The Purple Line Extension will provide a transportation alternative to the congested Westside, including two stops in Beverly Hills: Wilshire/ La Cienega and Wilshire/ Rodeo.

station map

 _____________________________________________________________________________________________

PROJECT DETAILS - Purple Line

The project is scheduled to be built in three sections.  The first section of the Purple Line Extension will extend the subway from the Wilshire/ Western station in Los Angeles to Wilshire/La Cienega in Beverly Hills.  Section 2 extends from the Wilshire/ La Cienega station to the Wilshire/ Rodeo station and then on to the Century City / Constellation station. 

Metro Purple Line Extension | Project Update from Beverly Hills Television on Vimeo.

 

 



64°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration