72°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Documents
Search
Bicycles Feasibility Study by Fehr & Peers 4-11-2012
within current roadway cross-section • Install bicycle route signage and “sharrow” roadway striping • Explore intersection treatments 15 Study Corridor: Charleville Blvd 16 Study Corridor: Charleville Blvd
http://www.beverlyhills.org/cbhfiles/storage/files/8378154971375848127/BicycleFeasabilityStudyFehrPeers4-11-2012.pdf
Community Outreach Introduction 4-11-2012
PILOT BICYCLE ROUTES 04/11/2012 WELCOME PILOT BICYCLE ROUTES 04/11/2012 PILOT BICYCLE ROUTES Traffic & Parking Commission Bicycle Ad Hoc Committee PILOT BICYCLE ROUTES
http://www.beverlyhills.org/cbhfiles/storage/files/5509734291215136568/COMMUNITYOUTREACHINTRO_04-11-12.pdf
Oceanstate Development Bid
Proposed Final Version (SUP)
for its determination: ARTICLE 1: INTEGRATION This document embodies a written memorandum of the entire understanding and mutual agreement of the parties as required by Government Code Section 3505.1 and supersedes all prior Memoranda of Understanding
http://www.beverlyhills.org/cbhfiles/storage/files/1173947139667554929/SupervisorsMOU(FINAL)8-12-14.pdf
Fine Arts Commission Liaison Committee Meeting Nov. 7, 2012
C Beverly Hills City CouncillFine Art Commission Liaison Committee will conduct a Special Meeting, at the following time and place, and will address the agenda listed below: CITY HALL 455 North Rexford Drive 4th Floor Conference Room A Beverly Hil
http://www.beverlyhills.org/cbhfiles/storage/files/511297057487296390/FineArtCommissionLiaison11-07-12.PDF
Cultural Heritage Commission Liaison Committee Agenda 11-7-12
2 Beverly Hills City CouncillCultural Heritage Commission Liaison Committee will conduct a Special Meeting, at the following time and place, and will address the agenda listed below: CITY HALL 455 N. Rexford Drive 4th Floor Conference Room A Bever
http://www.beverlyhills.org/cbhfiles/storage/files/177548083261789875/CulturalHeritageCommissionLiaison11-07-12.PDF
Chamber of Commerce Liaison Committee Meeting Agenda 08-07-14
Beverly Hills City Council I Chamber of Commerce Liaison Committee will conduct a Special Meeting, at the following time and place, and will address the agenda listed below: CITY HALL 455 North Rexford Drive 4th Floor Conference Room A Beverly Hil
http://www.beverlyhills.org/cbhfiles/storage/files/9136844891161810/DOC.PDF
11-16-2011 Agenda
A detailed Committee packet is available for review in the Library and City Clerk's Office In accordance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please call the Public Wor
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9745--11-16-11 Agenda.pdf
Bicycle Feasibility Study Presentation 11-16-2011
route signage and “sharrow” roadway stripingy p g • Explore intersection treatments 13 Study Corridor: Charleville Blvd • Existing Roadway Characteristicsg y • 2-lane roadway • 35’ curb to curb width • Time limit
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9841--Beverly Hills Bicycle Feasibility Study 11-16-2011.pdf
Bicycle Route Pilot Project 11-16-2011
within current roadway cross-section ● Install bicycle route signage and “sharrow” roadway striping ● Explore intersection treatments Mini traffic circles are best device for bicycle routes with many stop signs, because stop
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9855--Routes Map 11-16-2011.pdf
1   2   3   4   5   ... 74   >>