|
|
 |
 |
 | Urban Water Management Plan 2010 describes the City's current
conservation activities, as well as those
efforts that will be utilized in the event of a
water supply interruption, such as drought.
The City's water shortage contingency plan
was developed in consultation and
coordination
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9152--Urban Water Management Plan 2010_8-30-11.pdf
|
 | Live Scan Application State of California Department of Justice
REQUEST FOR LIVE SCAN SERVICE
BCII 8016 (3/07)
Applicant Submission
ORI: Type of Application:
Agency Address Set Contributing Agency:
Agency authorized to receive criminal history
http://www.beverlyhills.org/cbhfiles/storage/files/1818165197879352785/LiveScanApplication.pdf
|
 | Urban Water Management Plan 2005 City Manager
Roderick J. Wood
Director of Public Works
David Gustavson
Environmental Utilities Manager
Shana E. Epstein
CITY OF BEVERLY HILLS
2005 URBAN WATER MANAGEMENT PLAN
CITY OF BEVERLY HILLS
2005
URBAN WATER MANAGEMENT
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/3503--2005 Urban Water Management Plan.pdf
|
 | Residential & Commercial Notice - April 2010 |
 | Proposed Utility Rates Utility Rates & Fees
BHMC 6-1-
REFERENCE T Y P E O F U T I L I T Y C H A R G E
Inside Outside Inside Outside Inside Outside
City City City City City City
Water
88-R-7759 Service Connection Charge:
General
1" and smaller 670.46 848.70
http://www.beverlyhills.org/cbhfiles/storage/files/120252671152874575/ProposedUtilityRates.pdf
|
 | Construction Notice Pilot Bicycle Route Project 6-10-2013 CONSTRUCTION NOTICE
PILOT BICYCLE ROUTE PROJECT
BURTON WAY AND NORTH CRESCENT DRIVE
JUNE 24 - JULY 3, 2013
The City of Beverly Hills is pleased to announce the placement of our first bikeway pilot project!
The City's contractor will begin
http://www.beverlyhills.org/cbhfiles/storage/files/5088037251746214503/ConstructionNoticeBikeLanes06-10-13.pdf
|
 | Construction Notice Bike Lanes 6-10-2013 CONSTRUCTION NOTICE
PILOT BICYCLE ROUTE PROJECT
BURTON WAY AND NORTH CRESCENT DRIVE
JUNE 24 - JULY 3, 2013
The City of Beverly Hills is pleased to announce the placement of our first bikeway pilot project!
The City's contractor will begin
http://www.beverlyhills.org/cbhfiles/storage/files/710356690205490554/ConstructionNoticeBikeLanes06-10-13.pdf
|
 | Call Me Cheap |
 | Health Drink |
 | Low Flow |
 | Slow Flow |
 | Bicycle Route Pilot Project 11-16-2011 of Potential Bicycle Facilities:
Class III Bicycle Routes:
? Bicycle routes could be designated with signage
and sharrow striping
? Traffic volumes appear to be low on Crescent Dr,
south of Wilshire Bl
? Narrow street benefits cyclists
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9855--Routes Map 11-16-2011.pdf
|
 | Public Right-of-Way Approved Heavy Haul Routes BLVD
CIVIC C
ENTER
DR
WILSHIRE BLVD
N PA
LM D
R
BURTON WY
N OA
KHU
RST
DR
SUNSET BLVD
N DO
HEN
Y DR
SUNS
ET BL
VD
Approved Heavy Haul Routes - City of Beverly Hills, California
E
Map produced by: City of Beverly Hills - Information Technology -
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/4946--HeavyHaul_Routes.pdf
|
 | Agenda Report 3-2-10 |
 | Beverly Hills Utility Bills Now Payable Online! Utility Bills Now Payable Online!
Beverly Hills, CA - Beverly Hills utility customers now have the option to pay their City utility
bills online. Customers can check their bills and make a credit card payment instantly from
their home computers
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/8650--UtilityBillOnlinePaymentsFINAL.pdf
|
 | Beverly Hills Asks for Public Input on Bike Route Pilot Program for Public Input on Bike Route Pilot Program
Meetings Will Be Held April 11, April 25 and May 9
Beverly Hills, CA - Get those wheels spinning! The public is encouraged to attend any
of three meetings on a proposed pilot project to create up to five
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/10481--BicycleMeetingsFINAL.pdf
|
 | Consumer Confidence Report 2008 ppm 4 4 Average 1.7 Drinking water disinfectant added for treatment
(1) During a prolonged main break in September 2007, an affected area was supplied with LADWP water.
From time to time, the City of Beverly Hills Water Utility
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/5617--2008 Consumer Confidence Report.pdf
|
 | Holiday Permit Moratorium 2012 H O L I D A Y P E R M I T M O R A T O R I U M A R E A M A PN O V E M B E R 1 2 , 2 0 1 2 - J A N U A R Y 7 , 2 0 1 3
Sunset
Bouleva
rd
North S
anta Mo
nica Bo
ulevard
WilshireBoulevard South
Santa M
onica B
oulevar
d
Rexford
DriveCharlev
http://www.beverlyhills.org/cbhfiles/storage/files/7103220221299953484/HolidayPermitMoratoriumMap2012.pdf
|
 | Public Works Commission Liaison Meeting Agenda 11-14-2011 B e v e r l y H i l l s C i t y C o u n c i l C o u n c i l / P u b l i c W o r k s C o m m i s s i o n L i a i s o nC o m m i t t e e w i l l c o n d u c t a S p e c i a l M e e t i n g , a t t h e f o l l o w i n g t i m e a n dp l a c e , a n d w
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9747--Public Works Commission Liaison Meeting Agenda 11-14-2011.PDF
|
 | Utility Rates and Fees FY 2012-13 Utility Rates and Fees
REFERENCE
Inside Outside
City City
10-R-12775 Delinquent City Utility Bills Late Payment Charge
3% per month, or fraction thereof, of the unpaid portion 3.00% 3.00%
of any bill on a commercial account.
1.5% per month,
http://www.beverlyhills.org/cbhfiles/storage/files/1635491025905596610/UtilityRatesandFeesFY2012-2013.pdf
|
 | Public Works Commission Liaison Meeting Agenda 3-27-2012 Floor Conference Room A
Tuesday, March 27, 2012
7:00 AM,
SPECIAL MEETING AGENDA
a. Members of the public will be given
directly address the Committee on any
agenda.
2) Water Utility Revenue Requirements for the FY 2012/13 and
2013/14
3) Groundwater
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/10441--Public Works Commission Liaison Meeting Agenda 3-27-2012.PDF
|
 | Audit Liaison Committee Meeting Agenda 1-17-2012 V T h e B e v e r l y H i l l s C i t y C o u n c i l A u d i t C o m m i t t e e w i l l c o n d u c t aS p e c i a l M e e t i n g , a t t h e f o l l o w i n g t i m e a n d p l a c e ,
a n d w i l l a d d r e s s t h e a g e n d a l i s t e d b e
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/10029--Audit Liasion Committee Meeting Agenda 1-17-2012.PDF
|
 | Matrix Study of the Community Development Department system is utilized to receive inspections with linkage to OBC. The City recently launched an internet based inspection request and tracking service for applicants. ? Combination inspectors are utilized to respond to inspection requests. ? The OBC permit
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/4628--Beverly Hills CDD Final Draft Report.pdf
|
 | City of Beverly Hills Issues Resolution on Purple Line Extension School campus and opposes constraints, including the
currently proposed route of the Westside Subway Extension, which might prevent the
full utilization of the City's only High School campus by future generations of students.
Office of Communications
http://www.beverlyhills.org/cbhfiles/storage/files/8071231761255395317/SubwayReso4-11-13FINAL.pdf
|
 | Commercial Accessibility Plan Review Checklist parallel to the vehicle roadway) to
the maximum extent allowed by legal or site constraints.
Bus stop pads shall connect to streets, sidewalks or
pedestrian paths as part of an accessible route. Newly
constructed bus stop pads must provide a square curb
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/5164--2008 BH Plan Review List - Commercial Accessibility v1.pdf
|
 |
 |
|

|
 |