63°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker
Search Documents
Search
Roxbury Park Master Plan 11.19.12
SPORTSFIELD CURRENT CONFIGURATION - RETAIN BACKSTOP ASSEMBLY MULTI-USE SPORTSFIELD INSTALL GRID DRAIN/MODIFY SOIL PROFILE/UPDATE IRRIGATION SYSTEM MULTI-USE SPORTSFIELD AREA AFFECTED MULTI-USE SPORTSFIELD OUTCOME/COST ?INSTALL GRID DRAIN/MODIFY SOIL
http://www.beverlyhills.org/cbhfiles/storage/files/82127180488116904/November192012Powerpoint.pdf
Storm Drain Improvement Plan Review Checklist
Include the Basis of Bearing for the Street Centerline (if applicable).      13.  Include  stormwater  pollution  control  requirements  notes  for  storm  drain  construction.  City of Beverly Hills    Storm Drain Improvement Plans    Revised: 2/28/2011    Page 3 of 6      C. General Plan and  Profile
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/8478--STORM DRAIN IMPROVEMENT PLAN CHECKLIST 2-28-11.pdf
Sewer Improvement Plan Review Checklist
Revised: 2/23/2011    Page 3 of 6    12.  Include the Basis of Bearing for the Street Centerline (if applicable).      C. General Plan and  Profile Requirements  Applicant:    Plan Check  Engineer   1.  North arrow (point up or to the right).      2. 
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/8479--SEWER IMPROVEMENT PLAN CHECKLIST 2-28-11.pdf
Waterline Improvement Plan Review Checklist
Include the Basis of Bearing for the Street Centerline (if applicable).  City of Beverly Hills    Waterline Improvement Plans    Revised: 2/23/2011    Page 3 of 5  C. General Plan and  Profile Requirements    Applicant:    Plan Check  Engineer   1.  North arrow (point up or to the right).      2. 
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/8480--WATER IMPROVEMENT PLAN CHECKLIST 2-28-11 (2).pdf
Final Candidate Forum to Be Held Tonight in City Hall
sponsored by The Beverly Hills Chamber of Commerce, took place on Jan. 28. For residents unable to attend, videos of the forums will be available on demand from the City's website at http://beverlyhills.granicus.com/ViewPublisher. php?view_id=23. City
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/4745--Press Release - Candidate Forum 2009-II.pdf
Feral Cat TNR Permit Notice Form
comments to: Attention: Community Preservation Community Development Department 455 N Rexford Dr, 1st Floor Beverly Hills, Ca 90210 Submit comments online by visiting https://clients.comcate.com/newrequest. php?id=31 Important: Choose
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/5809--TNR Permit Notice Form v2.pdf
Street and Alley Improvement Plan Review Checklist
Scale". 3. Call out all street names. 4. Centerline stationing to be used on both plan and profile. 5. Station intervals at 100 ft with tick mark and station labels (tick marks at 50 ft interval). Stationing shall read left to right.
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/8232--Street and Alley Improvement Plan Review Checklist 1-2011.pdf
FAQ for Excavations
are not otherwise authorized by a Class A-Street Use Permit. What activities are authorized by a Class A-Street Use Permit? Please refer to Beverly Hills Municipal Code (BHMC) 8-2-3:A at: http://www.sterlingcodifiers.com/codebook/index. php?book_id=466 How
http://www.beverlyhills.org/cbhfiles/storage/files/328008296349250191/FAQforExcavations12-2012.pdf
Addendum #4
of Roxbury Park Community Center October 27, 2011 ADDENDUM NO. 4 - PAGE 2 of 2 RFI#22 a. CT-1 changed to PORC for restroom 104. See sheet A7.6. b. Style name for RUBF-2 to be: Endura Solid Rubber Tile (round profile), see sheet A7.6 c. Shaw
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9723--11-4-11 Adendum No 4.pdf
Wood Roof Ordinance Community Meeting Q&A
at https://clients.comcate.com/newrequest. php?id=31 . ROOFING PRODUCTS AND MATERIALS THAT REDUCE FIRE HAZARD Q: What is a Class-A roof assembly and when is it required? A: The Class A, B, and C rating system for roofs is a method to differentiate the flame spread resistance of roof assemblies
http://www.beverlyhills.org/cbhfiles/storage/files/1593807032605904046/WoodRoofOrdinance-CommunityMeetingQ-A.pdf
Beverly Hills Chamber Performance Audit
Relationships.......................................................................... II-2 Financial Profile.............................................................................................. II-4 Initiative Implementation................................................................................. II-7 Recent
http://www.beverlyhills.org/cbhfiles/storage/files/3546431651850121067/BH Performance Audit FINAL REPORT July 28.pdf
Brochure - Director of Administrative Services / Chief Financial Officer Position
for general fund support of the City's parking authority and clean water fund, both of which are currently structurally imbal- anced. The City's financial operations remain strong due to its solid economic fundamentals, above-average socioeconomic profile
http://www.beverlyhills.org/cbhfiles/storage/files/11958281691429821725/Brochure-DirofAdminSvcs-CFO-CityofBeverlyHills.pdf
Final Map Submittal Process & Checklist
but a guideline to the preparer for typical Final Maps. The preparer is directed to the City's municipal code [BHMC] http://www.sterlingcodifiers.com/codebook/index. php?book_id=466, the Subdivision Map Act [SMA], the Business and Professions Code [BPC]
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/6953--Final Map Submittal_Checklist.pdf
CALGreen (GC-1) Residential Checklist Table A4.602
Information on NSHP incentives available through the California Energy Commission may be obtained at the "Go Solar California" website: http://www.gosolarcalifornia.org/about/nshp. php Notwithstanding, a single family residential property is exempt from
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/8533--GC-1 Residential CALGreen checklist.pdf
City of Beverly Hills Economic Sustainability Plan 2011-2015
businesses can prosper. In this way, the city hopes to generate the revenues necessary to support the quality of life expected by businesses and residents in beverly Hills. building on previous plans, such as the economic Profile, the business attraction
http://www.beverlyhills.org/cbhfiles/storage/files/542470884518649380/Economic_Sustainability_Plan_FINAL_2011-2015.pdf
Waverly Mansion Historic Assessment Report
lawns.  Hardscape features include brick perimeter walls, fountain and ponds with bridges, low? profile  concrete  steps,  decorative  iron  gates  and  formal  paved  driveway  approach  from  the  corner  of  Hillcrest  Road  and  Sunset  Boulevard  to  the  house,  and  a  secondary  driveway  approach off Hillcrest Road that 
http://www.beverlyhills.org/cbhfiles/storage/files/8006155421854636647/WaverlyMansion.pdf
Addendum #6- Revised Specifications
or required for complete installations. 2.02 ARCHITECTURAL JOINT SYSTEMS, GENERAL A. General: Provide architectural joint systems of design, basic profile, materials, and operation indicated. While specified joint systems establish the function
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9774--blobdload.pdf
Applicant Guide
to 10 characters is length with at least one number and no special characters. This Profile Information can be accessed at any time by selecting the " Profile" button at the top of the Home page. Existing Users If you are a returning user, login
http://www.beverlyhills.org/cbhfiles/storage/files/4765307811519293187/ePlanUserGuideFinal.pdf
Chamber Performance Audit
several of the Chamber positions to publicly available data: EXHIBIT I-1 Total Compensa t i o n Comparis o n Results * Chamber Position Comparisons CEO The Beverly Hills (BH) Chamber CEO comparisons are a mixed profile. The BH CEO makes less than
http://www.beverlyhills.org/cbhfiles/storage/files/14127303031904718110/ChamberPerformanceAudit.pdf
TAB 2 - Tory Burch
a vigorous economy by supporting businesses that contribute revenue, quality services and high-paying jobs. 1 Available online at http://www.sterlingcodifiers.com/codebook/index. php?book_id=466 2
http://www.beverlyhills.org/cbhfiles/storage/files/503711412342292992/TAB2-ToryBurch.pdf
Hilton Office Building Historic Assessment Report
CITY LANDMARK ASSESSMENT & EVALUATION REPORT JANUARY 2013  HILTON OFFICE BUILDING 9990 Santa Monica Boulevard, Beverly Hills, CA  Prepared for: City of Beverly Hills Community Development Department Planning Division 455 Rexford Drive,
http://www.beverlyhills.org/cbhfiles/storage/files/284211082448517535/HiltonOfficeBuilding.pdf
FY 2006-07 Budget
PROFILE............................................................................................................................. 591 FINANCIAL POLICIES................................................................................................................. 593 FISCAL YEAR 2006/2007 BUDGET
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/2636--FY 2006-07 Budget.pdf
2008 Guidelines for Evaluating and Mitigating Seismic Hazards in California
SPECIAL PUBLICATION 117 GUIDELINES FOR EVALUATING AND MITIGATING SEISMIC HAZARDS IN CALIFORNIA 2008 THE RESOURCES AGENCY STATE OF CALIFORNIA DEPARTMENT OF CONSERVATION MIKE CHRISMAN ARNOLD SCHWARZENEGGER B
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/4288--SP117-091508.pdf
Sewer System Master Plan Report (Part 2)
to its original round profile. ? Sewer Lateral/Main Connection Re -Establishment ± After a sewer line is rehabilitated with a trenchless liner the laterals are restored with robotically controlled cutting devices. These robots cut out a round coupon from
http://www.beverlyhills.org/cbhfiles/storage/files/1780375632231514391/SSMPReportPart2.pdf
FY 2007-08 Budget
............................................................................................ 681 SUPPLEMENTAL INFORMATION ............................................................................... 697 City Profile............................................................................................................... 699
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/2615--FY 2007-08 Budget.pdf