76°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
Proposed Final Version (SUP)

MEMORANDUM OF UNDERSTANDING BETWEEN THE CITY OF BEVERLY HILLS AND THE BEVERLY HILLS SUPERVISORS ASSOCIATION OCTOBER 6, 2013 - SEPTEMBER 30, 2015 i TABLE OF CONTENTS Page CHAPTER 1
http://www.beverlyhills.org/cbhfiles/storage/files/1173947139667554929/SupervisorsMOU(FINAL)8-12-14.pdf
Gateway FEIR Supplemental Analysis

by the reviewing authority of maximum height allowances on that Parcel. 10. Development shall incorporate adequate land dedications or easements that may be needed for future roadway and transportation improvements, including possible bicycle facilities
http://www.beverlyhills.org/cbhfiles/storage/files/1633296010566023992/GatewayFEIRSupplmentalAnalysis.pdf
Bid Package

BID NO. 14-03 City of Beverly Hills Rexford Drive Intersection Improvements Project 1 of 25 BID PACKAGE NO. 14-03 CITY OF BEVERLY HILLS PUBLIC WORKS & TRANSPORTATION - PROJECT ADMINISTRATION 345 FOOTHILL ROAD BEVERLY HILLS, CALIFO
http://www.beverlyhills.org/cbhfiles/storage/files/141126655422598312/BidDocuments.pdf
Bid Document

BID NO. 14-09 City of Beverly Hills Roxbury Park Field Renovation and Mainline Replacement Project 1 of 25 BID PACKAGE NO. 14-09 CITY OF BEVERLY HILLS PUBLIC WORKS & TRANSPORTATION - PROJECT ADMINISTRATION 345 FOOTHILL ROAD BEVER
http://www.beverlyhills.org/cbhfiles/storage/files/570827499659398825/BidDocuments.pdf
Bid Document

BID NO. 14-13 City of Beverly Hills Roxbury Park Field Restroom Building Project 1 of 25 BID PACKAGE NO. 14-13 CITY OF BEVERLY HILLS CAPITAL ASSETS - PROJECT ADMINISTRATION 345 FOOTHILL ROAD BEVERLY HILLS, CALIFORNIA 90210 L
http://www.beverlyhills.org/cbhfiles/storage/files/2688889231277044399/BidDocument.pdf
Exponent Report on Metro's Safety and Seismic Findings

Failure Analysis Associates Hazard Assessment Study Westside Subway Extension Project Century City Area, California 1106070.000 A0T0 0112 PM03 Hazard Assessment Study Westside Subway Extension Project Century City Area
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/10153--Report - Assessment of Westside Subway Extension_Final.pdf
Specifications

necessary arrangements and pay all related costs. Miscellaneous existing underground facilities, drainage devices, secondary water lines, cables, abandoned oil and water lines, leaching fields, irrigation pipes, wiring, etc, located l2 inches or more
http://www.beverlyhills.org/cbhfiles/storage/files/1705489833397244010/Specifications.pdf
Bid 14-21: Protected Specifications

? ? ? NOTICE TO BIDDERS PROPOSAL FORM SPECIFICATIONS and STANDARD CONTRACTUAL REQUIREMENTS Construction of FY 2013-14 WATER MAIN REPLACEMENTS - VARIOUS LOCATIONS Within the Cities of BEVERLY HILLS and WEST HOLLYW
http://www.beverlyhills.org/cbhfiles/storage/files/16873351721010816937/Bid14-21PROTECTEDspecs-job10101.pdf
Single Family Dwelling Plan Check Correction Sheet

or details. 75. Show how dwelling is provided with comfort heating facilities capable of maintaining 68°F at 3 ft above the floor [CBC 1204.1] 76. Provide fluorescent lighting in bathrooms and kitchen for general lighting. Locate switch and lighting
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/4705--SFD Plan Review Correction Sheet.pdf
Sewer System Master Plan Report (Part 2)

to reduce capital cost while maintaining and improving the level of sewer service. In general, trenchless pipe construction can be utilized for new construction, upsizing existing facilities, and replacing or repairing existing facilities. Due
http://www.beverlyhills.org/cbhfiles/storage/files/1780375632231514391/SSMPReportPart2.pdf
<<   1 ...   46   47   48   49   50   51   >>