79°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
December 2013

MEZZANINE STARTED UNDER PERMIT BS0202577 and BS0614269; MAKE STRUCTURAL UPGRADES LMM 2008 TRUST (310) - FINTON CONSTRUCTION INC. (626) 622-8972 Owner: Contractor: Description : ADD BEDROOM, BATH, RAISE ROOF AND REMODEL SFR. ALTERATIONS
http://www.beverlyhills.org/cbhfiles/storage/files/11674286991610505097/December2013.pdf
Gateway FEIR Volume 2

City of Beverly Hills The Beverly Hills Gateway Project Final Environmental Impact Report Volume II: Appendices SCH # 2008011066 March 2011 The Beverly Hills Gateway Project
http://www.beverlyhills.org/cbhfiles/storage/files/1786631115284172993/GatewayFEIRVol2.pdf
Contractor Corner

installed in accordance with applicable codes and inspected. TEMPORARY TOILET FACILITIES Top of Page “Porta Potty”, Portable Toilet Facilities Required During Construction. Before the start of construction of any building
http://www.beverlyhills.org/business/constructionlanduse/contractorcorner
CALGreen (GC-1) Residential Checklist Table A4.602

is developed and the following items, as appropriate, pertaining to the heating and cooling systems are inspected and certified by an independent third party agency: 1. Verify compliance with the manufacturers recommended start-up procedures. 2. Verify
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/8533--GC-1 Residential CALGreen checklist.pdf
2014-01-08 Blue Ribbon Committee Meeting Memo

circumstances, including curb ramp/landing area needs, signal equipment location, visibility, and available right-of-way. Study the project in sections The consultant team started review of the project, and continues to do so, in four distinct identified
http://www.beverlyhills.org/cbhfiles/storage/files/1090632649119212680/01-08-14Memo.pdf
Supplemental Accessibility No. 5 Plan Review Checklist

Engineers. (ASME) document ASME 17.1-1990. (1124A.9, 1116B.1.5, Fig 11A-7B & Fig. 11B-40B). n. The minimum acceptable time from notification that a car is answering a call (lantern and audible signal) until the doors of the car start to close shall
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/5171--2008 LARUCP Plan Review List - Supplemental Accessibility No 5 v1.0.pdf
Bid Document

Skid shall have stainless angled deflector for tank drain. Deflector shall extend down to cover full bed side rail. c. Engine: Gasoline, 20 HP, air-cooled with electric start, battery, and built-in charging circuit. Fuel tank with minimum capacity
http://www.beverlyhills.org/cbhfiles/storage/files/17116905311147535085/Bid14-32_TruckMountedwithValveOperatorandVacuumMachine.pdf
Addendum #6- Revised Specifications

Meeting: Convene one week before starting work of this section. 1.04 SUBMITTALS A. See Section 01 3000 - Administrative Requirements, for submittal procedures. B. Product Data: Provide manufacturers' data sheets on stone tile, mortar, grout,
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9774--blobdload.pdf
FY2014/15 Budget Message - Proposed

activity that has been started and is planned for the near-term in the City. Through February, the revenue collected from Licenses and Permits issued by the Community Development Department in FY 2013/14 was 25% greater than during the same period one
http://www.beverlyhills.org/cbhfiles/storage/files/20123583147349349/CityManagersbudgetmessage-FY14-15Proposed-FinalDraft.pdf
ARMP Presentation

gender  Impact of assumptions • Understand what’s important  Drivers of costs, benefits, emotions • Many have considerable (e.g., 50%+) impact on results 31 Numerous assumption sets • Start w/ GASB OPEB valuation assumptions • 15+ versions…w/ a,
http://www.beverlyhills.org/cbhfiles/storage/files/264386659670376413/ManagingPersonnelCostsPresentationforWebsite4511.pdf
<<   1 ...   36   37   38   39   40   ... 53   >>