74°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
Bid Document

Skid shall have stainless angled deflector for tank drain. Deflector shall extend down to cover full bed side rail. c. Engine: Gasoline, 20 HP, air-cooled with electric start, battery, and built-in charging circuit. Fuel tank with minimum capacity
http://www.beverlyhills.org/cbhfiles/storage/files/17116905311147535085/Bid14-32_TruckMountedwithValveOperatorandVacuumMachine.pdf
Bid Package

non-skid floor mat i) Safety features Engine emergency shutdown: Low oil pressure, and/or high temperature. Start only when shifter is in neutral and parking brake is engaged Alarm, back-up Title: Bid Specification_ Compact Front-end Wheel
http://www.beverlyhills.org/cbhfiles/storage/files/5596260331641596531/Bid13-10_TractorArticulatedSteeringCompactWheelLoader.pdf
ARMP Presentation

gender  Impact of assumptions • Understand what’s important  Drivers of costs, benefits, emotions • Many have considerable (e.g., 50%+) impact on results 31 Numerous assumption sets • Start w/ GASB OPEB valuation assumptions • 15+ versions…w/ a,
http://www.beverlyhills.org/cbhfiles/storage/files/264386659670376413/ManagingPersonnelCostsPresentationforWebsite4511.pdf
Sample Agreement

Start work 10 days after receipt of approved agreement and Notice To Proceed Complete work in 120 days after commencement WARRANTY One (1) year materials and labor B0785-0001\955691v1.doc EXHIBIT B-1 SCHEDULE OF PAYMENTS CITY
http://www.beverlyhills.org/cbhfiles/storage/files/1241907760639921201/SmapleAgreement.pdf
Addendum #6- Revised Specifications

Meeting: Convene one week before starting work of this section. 1.04 SUBMITTALS A. See Section 01 3000 - Administrative Requirements, for submittal procedures. B. Product Data: Provide manufacturers' data sheets on stone tile, mortar, grout,
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9774--blobdload.pdf
CALGreen (GC-1) Residential Checklist Table A4.602

is developed and the following items, as appropriate, pertaining to the heating and cooling systems are inspected and certified by an independent third party agency: 1. Verify compliance with the manufacturers recommended start-up procedures. 2. Verify
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/8533--GC-1 Residential CALGreen checklist.pdf
Supplemental Accessibility No. 5 Plan Review Checklist

Engineers. (ASME) document ASME 17.1-1990. (1124A.9, 1116B.1.5, Fig 11A-7B & Fig. 11B-40B). n. The minimum acceptable time from notification that a car is answering a call (lantern and audible signal) until the doors of the car start to close shall
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/5171--2008 LARUCP Plan Review List - Supplemental Accessibility No 5 v1.0.pdf
Contractor Corner

installed in accordance with applicable codes and inspected. TEMPORARY TOILET FACILITIES Top of Page “Porta Potty”, Portable Toilet Facilities Required During Construction. Before the start of construction of any building
http://www.beverlyhills.org/business/constructionlanduse/contractorcorner
Bid Documents

2-01.1 TIME FOR COMPLETION – The work on this project shall start within 7 calendar days from the date of receipt of written notice to proceed from the City Engineer and the Contractor agrees to complete the entire work within 300 working days from
http://www.beverlyhills.org/cbhfiles/storage/files/881851744827579716/12-35BidDocs.pdf
BID DOCUMENTS

2-01.1 TIME FOR COMPLETION – The work on this project shall start within 7 calendar days from the date of receipt of written notice to proceed from the City Engineer and the Contractor agrees to complete the entire work within 300 working days from
http://www.beverlyhills.org/cbhfiles/storage/files/445274345982411127/Bid12-35NoticeToBidders5-8-12.pdf
<<   1 ...   30   31   32   33   34   ... 43   >>