72°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
09-18-13 AC Minutes

Vice Chair Bernstein, Chair Blakeley. None. William Crouch, Cindy Gordon, Reina Kapadia, Karen Myron (Community Development Department, Planning Division). Motion by Commissioner Peteris, second by Vice Chair Bernstein to approve the agenda
http://www.beverlyhills.org/cbhfiles/storage/files/6833740081299342422/9-18-13ACMinutesSIGNED.pdf
Very High Fire Severity Zone Requirements

installed over a 36-in. wide underlayment consisting of one layer of 72 pound mineral-surfaced nonperforated cap sheet meeting ASTM D3909 running the full length of the valley. (705A.3;R327.5.3) 5. Note on Plans “Roof gutters shall be design to prevent
http://www.beverlyhills.org/cbhfiles/storage/files/7175418011771562876/VERYHIGHFIREHAZARDSEVERITYZONE.pdf
September 2014 Synopsis

Research Foundation 4. (2013-142) Cardiovascular Research Foundation of So. Cal 5. (2013-147) Assistance League of Los Angeles (monetary drive) 6. (2013-148) French Heritage Society 7. (2013-160) Planned Parenthood LA 8. (2013-161/161A/162) The Helping Hand
http://www.beverlyhills.org/cbhfiles/storage/files/990986769287608409/CSCsynopsis09-2014.pdf
Bid 13-17: Audio/Visual and Television Production System Improvements

week planning and implementation period. 8 Bid No. 13-17 Audio/Visual and Television Production System Improvements SECTION 5: SCOPE OF WORK 5-1. General Requirements 5-1.1. Contractor shall provide to the satisfaction of City
http://www.beverlyhills.org/cbhfiles/storage/files/16208508671643346876/CityHallAVBid2012-10-24-12.pdf
Form 460, Pre-election Statement - 01/01/2011-01/22/2011

ALSO ENTER LD. NUMBER) CODE OR DESCRIPTION OF PAYMENT AMOUNT PAID DM1 Dynamic Marketing Inc. Mail House Plus Postage 1 145 West Collins Avenue PRT Graphic Services $5,941.25 Orange California 92867 Extra pieces for walking The Beverly Hills Weekly
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/8244--Krasne - 2011 Jan 24.PDF
Bid Documents

– Rear, curbside Shelving – None Door(s) – Single Light(s) – See Section 6.25 Additional Instructions – This compartment shall be set up to house two (2) „M‟ sized cylinders. One (1) set of louvers shall be installed in the door. Exact
http://www.beverlyhills.org/cbhfiles/storage/files/4229949761563551655/biddoc12-31.pdf
Form 460, Preelection Statement 01/01/2013 - 01/19/2013

Brighton Way, Floor 2, Beverly Hills, IND Real Estate $400.00 $400.00 $400.00 Fardi CA 90210 Investment/House wife IND $0.00 $0.00 SUBTOTALS $7 200 0( SCHEDULE A SUMMARY 1. Amount received this period - itemized monetary contributions. * Contributor Codes
http://www.beverlyhills.org/cbhfiles/storage/files/3829260291704723972/BrianRosenstein-Form460PreelectionStatement01-01-2013thru01-19-2013.pdf
Addendum #4- Revised Specifications

No. 3 – Include stipulated sum for new or rerouting of conduits and pipes in conflict with new construction, in accordance with the staged demolition of the site and existing community center. Refer to plans DP-1 and IA-1 through IA-4. 4.)
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9726--Revised Specs.pdf
Transportation Memo - Santa Monica Boulevard Access

driveways along North Santa Monica Boulevard in addition to South Santa Monica Boulevard. The new driveways under consideration were developed in conjunction with City planning and transportation staff. Through discussions with City staff
http://www.beverlyhills.org/cbhfiles/storage/files/186433088402517537/TransportationMemo(NSMBAccess).pdf
Beverly Hills In Focus - January 2010

for another use seat Goldsmith Theater. The design plan by award-winning architect Zoltan Pali seamlessly integrates the historic 1933 Beverly Hills Post Office with this new, state-of-the-art contemporary theater. The project exemplifies the City’s goal
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/6372--InFocus_Jan10_V4.pdf
<<   1 ...   226   227   228   229   230   231   >>