75°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
Proposed Beverly Hills Confidential Employees Association 2015-2019 MOU (Tracked Changes)

8 HEALTH BENEFITS ............................................................................................. 8 A. Cafeteria Plan and Benefits ......................................................................... 8 B. Flexible Spending Account (FSA)
http://www.beverlyhills.org/cbhfiles/storage/files/6849871351395553424/Confidential_2015-2019_MOU_TrackedChanges_FinalProposed_Posted01.19.16.pdf
2015-07-09 Traffic & Parking Commission Meeting Presentation

• Contractor to prepare detailed traffic management plans by phase and retain flexibility to respond to traffic conditions • Traffic monitoring 16 Traffic Mitigation on Residential Streets Advance Warning Dynamic Message Signs 17
http://www.beverlyhills.org/cbhfiles/storage/files/1483427919541720404/2015-07-09TrafficParkingCommissionMeetingPresentation.pdf
PREQUALIFICATION PACKAGE FOR THE CONSTRUCTION OF FOUR CITY GATEWAY MONUMENTS

4 The hearing shall be conducted by a panel consisting of three members of the Department of Public Works & Transportation senior management staff (the “Appeals Panel”). The Appeals Panel shall consider any evidence presented by the Contractor, whether
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/10065--GATEWAYPrequal Published_Project #12-20 1-19-2012.pdf
Bid Document

evidence room, the SCE transformer and trash enclosure all located at 464 N. Rexford Drive, Beverly Hills, California 90210. d. Obtaining Bid Documents: A copy of the Bid Package may be obtained by mail or in person from the Department of Public
http://www.beverlyhills.org/cbhfiles/storage/files/517179218256605328/BidDocument.pdf
Specifications

Obtain copies of standards where required by product specification sections. D. Maintain copy at project site during submittals, planning, and progress of the specific work, until City of Beverly Hills – Roxbury Park Restroom Facility
http://www.beverlyhills.org/cbhfiles/storage/files/13034077851680021995/Specifications.pdf
Notice To Bidders: Reservoir #4A

- The Work to be done shall consist of furnishing all the required labor, materials, equipment, parts, implements and supplies necessary for, or appurtenant to, the construction and completion of the project indicated above in accordance with the Plans
http://www.beverlyhills.org/cbhfiles/storage/files/1388360133783614773/NOTICEINVITINGBIDS-OVERFLOWPIPEDEC4.pdf
07-09-15 Meeting Minutes

Steps. Commissioner Felsenthal questioned how Public Works Services (PWS) shuts off water Page I of3 2.Rate Increase Update Ms. Rhay provided an update. The following were discussed: Council Approval; Background; Risks and Impacts; Action Plan; Rate vs.
http://www.beverlyhills.org/cbhfiles/storage/files/1677710215353339763/8PWCJuly9.PDF
April 28, 2015

and Urban Forest Manager Ken Pfalzgraf to produce a Master Plan for the replacement of trees on Parkway and return with a report to the Commission as to the conditions to which the replacement will occur, the trees recommended for replacement and the fiscal
http://www.beverlyhills.org/cbhfiles/storage/files/8813271081877836982/RPCMinuters042815Signed.pdf
Plan Set

4"+\/-1"\ SLUMP PARTIAL\ ROOF\ FRAMING\ PLAN SCALE: 81\/8"=1'-0" 5 SCOPE\ OF\ WORK - 8 KEY\ PLAN 4SECTION 2GENERAL\ NOTES ROUGHEN\ SURFACE NOTE: CONTRACTOR\ TO\ REMOVE\ EXISTING\ CONCRETE\ PADS\ WHERE\ NOTED\ ON THE\ ARCHITECTURAL\ DRAWINGS.\
http://www.beverlyhills.org/cbhfiles/storage/files/7698282531307681690/FinalBidSetPlans.pdf
7-02-08 Synopsis

Commission Synopsis July 2, 2008 drc 7-02-08 synopsis 2 ORAL COMMUNICATIONS FROM THE AUDIENCE ORAL COMMUNICATIONS FROM THE COMMISSION Decisions of the Design Review Commission may be appealed to the Planning Commission within fourteen (14)
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/3698--DRC 7-02-08 synopsis.pdf
<<   1 ...   192   193   194   195   196   ... 295   >>