77°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
Prequalification Package

Inviting Bids for this Project. Prior to the hearing, the Contractor shall, in writing, be advised of the basis for the City’s pre-qualification determination. The hearing shall be conducted by a panel consisting of three members of the Department
http://www.beverlyhills.org/cbhfiles/storage/files/17115215111494849639/Prequalificationpackage.pdf
December 2013

FLOOR-NEIMAN MARCUS TI FOR PRADA; REMODEL OF INTERIOR SPACE INSIDE DEPARTMENT STORE. PARTIAL REMOVAL OF EXISTING PARTITION WALLS AND MILLWORK, FINISHES AND LIGHTING. INSTALL NEW PARTION WALLS, MILLWORK AND FINISHES MARCO CICCONE/ PRADA US CORP (212) 307-9300
http://www.beverlyhills.org/cbhfiles/storage/files/11674286991610505097/December2013.pdf
Prequalification Package

shall, in writing, be advised of the basis for the City’s pre-qualification determination. The hearing shall be conducted by a panel consisting of three members of the Department of Public Works & Transportation senior management staff (the
http://www.beverlyhills.org/cbhfiles/storage/files/197645731252188896/Prequalificationpackage.pdf
Prequalification Package

pre-qualification determination. The hearing shall be conducted by a panel consisting of three members of the Department of Public Works & Transportation senior management staff (the “Appeals Panel”). The Appeals Panel shall consider any evidence presented
http://www.beverlyhills.org/cbhfiles/storage/files/10399584691442128697/GreystoneFirehousePrequalificationPackage-Final.pdf
Prequalification Document

pre-qualification determination. The hearing shall be conducted by a panel consisting of three members of the Department of Capital Assets senior management staff (the “Appeals Panel”). The Appeals Panel shall consider any evidence presented
http://www.beverlyhills.org/cbhfiles/storage/files/18340082171866630120/SiteRepairsPrequalificationPackage.pdf
RFP Document

on request. The City’s taxicab rules and regulations are administered and enforced by a group within the Parking Services Division of the Department of Public Works & Transportation under the overall direction of the Director of Parking Operations.
http://www.beverlyhills.org/cbhfiles/storage/files/1967224105935247127/BHTaxicabFranchiseRFP52814.pdf
IFB C1056 Appendix C (Amd 3) - COBH Tech Spec for DI Pipe

Compensation for all materials and work shall be included in the bid price for loops. All installations of Traffic Signal Loop detector cable shall conform to the City of Beverly Hills Public Works Department detail and Standard Specifications for Public
http://www.beverlyhills.org/cbhfiles/storage/files/485089981442284360/C1056-LaCienega-AppendixC(Amd3)-COBHTechSpecforDIPipe.pdf
Bid 14-06: ALPR

benefits by a State or federal court, or voluntarily excluded from covered transactions by any Federal department or agency. 2-16. The selected Respondent shall cooperate in all matters relating to taxation and the collection of taxes.
http://www.beverlyhills.org/cbhfiles/storage/files/3705866101425145235/Bid14-06ALPR.pdf
Prequalification Package

to the hearing, the Contractor shall, in writing, be advised of the basis for the City’s prequalification determination. The hearing shall be conducted by a panel consisting of three members of the Department of Public Works & Transportation senior
http://www.beverlyhills.org/cbhfiles/storage/files/1221630725276189321/SM5SignagePrequalPackage.pdf
Addendum #6

CITY OF BEVERLY HILLS PROJECT ADMINISTRATION DIVISION DEPARTMENT OF PUBLIC WORKS & TRANSPORTATION 345 FOOTHILL ROAD BEVERLY HILLS, CALIFORNIA 90210 ADDENDUM NO. 6 CONSTRUCTION OF THE ROXBURY COMMUNITY CENTER PROJECT
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9777--11-14-11 Addendum No 6 (2).pdf
<<   1 ...   137   138   139   140   141   ... 146   >>