70°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
Bid Documents

for forfeiture of this bidder's bid security, if applicable. (e) In the event Contractor does not maintain current, valid evidence of insurance on file with City, City may, at its option, withhold payment of any moneys owed to Contractor, or which
http://www.beverlyhills.org/cbhfiles/storage/files/9496943083715443/CivicCenterSignageProjectRe-Bid13-2BidPackage.pdf
Bid Packet

of insurance within the required time period shall be cause for termination for default, and shall be cause for forfeiture of this bidder's bid security, if applicable. (e) In the event Contractor does not maintain current, valid evidence of insurance
http://www.beverlyhills.org/cbhfiles/storage/files/18624176601505181569/BidDocs.pdf
Bid Package

13-10 5 of 10 SECTION III – DETAILED SPECIFICATIONS SUBSECTION A - TECHNICAL NOTES IN EVENT OF CONFLICT, THE FOLLOWING SPECIFICATIONS SHALL PREVAIL OVER GENERAL INSTRUCTIONS CONTAINED ELSEWHERE IN THIS BID. IMPORTANT NOTICE
http://www.beverlyhills.org/cbhfiles/storage/files/5596260331641596531/Bid13-10_TractorArticulatedSteeringCompactWheelLoader.pdf
Bid Package

of insurance within the required time period shall be cause for termination for default, and shall be cause for forfeiture of this bidder's bid security, if applicable. (e) In the event Contractor does not maintain current, valid evidence of insurance
http://www.beverlyhills.org/cbhfiles/storage/files/5106740561550899597/BidPackage.pdf
Bid Package

for forfeiture of this bidder's bid security, if applicable. (e) In the event Contractor does not maintain current, valid evidence of insurance on file with City, City may, at its option, withhold payment of any moneys owed to Contractor, or which
http://www.beverlyhills.org/cbhfiles/storage/files/14933631411896377701/BidPackage.pdf
Main Document

be cause for termination for default, and shall be cause for forfeiture of this bidder's bid security, if applicable. (e) In the event Contractor does not maintain current, valid evidence of insurance on file with City, City may, at its option,
http://www.beverlyhills.org/cbhfiles/storage/files/77597356874161729/B13-01-main.pdf
Beverly Hills City Hall Historic Assessment Report

with important events in the main currents of national, state, or local history, or directly exemplifies or manifests significant contributions to the broad social, political, cultural, economic, recreational, or architectural history of the Nation, State, City,
http://www.beverlyhills.org/cbhfiles/storage/files/820304402421954432/BeverlyHillsCityHall.pdf
Specifications- Irrigation

of Landscape Architect. In the event this notification is not performed, Contractor shall assume full responsibility for any revision necessary. E. Reference Specifications and Standards. 1. ASTM: D1784 Rigid Polyvinyl Chloride (PVC) Compounds
http://www.beverlyhills.org/cbhfiles/storage/files/9969727391891359900/328400-Irrigation.pdf
Addendum No. 1

considered in engineering. Such obstructions or differences should be brought to the attention of Landscape Architect. In the event this notification is not performed, Contractor shall assume full responsibility for any revision necessary. E.
http://www.beverlyhills.org/cbhfiles/storage/files/5326832911327907882/AddendumNo1.pdf
Urban Water Management Plan 2005

current conservation activities, as well as those efforts that will be utilized in the event of a water supply interruption, such as drought. The City’s water shortage contingency plan was developed in consultation and coordination with other MWD
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/3503--2005 Urban Water Management Plan.pdf
<<   1 ...   96   97   98   99   100   ... 108   >>