64°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
Jeff Kolin Declaration

are the primary responders in the event of a fire….” AR1094. The risks of released methane and hydrogen sulfide require emergency services to be prepared to ensure public safety. Metro acknowledges that methane is flammable and explosive at a low (5 percent)
http://www.beverlyhills.org/cbhfiles/storage/files/13910761781850098102/KolinDecl.pdf
Appendix A- Beverly Hills Municipal Code

be due upon execution of the franchise agreement and on each anniversary date thereafter, unless otherwise specified in the franchise agreement. Failure to pay the full franchise fee when due shall be cause for revocation of the franchise. In the event
http://www.beverlyhills.org/cbhfiles/storage/files/16522104571279552103/BHMC52814Draft.pdf
Planning Commission and Cultural Heritage Commission Joint Liaison Committee Meeting Agenda 1-15-15

REQUIREMENTS: Every owner, and every person in possession or control, of a historic property shall, to the maximum extent practicable, maintain and keep the property in good repair, as defined in sections 5-7-3 and 5- 7-4 of this code. In the event
http://www.beverlyhills.org/cbhfiles/storage/files/435048101720640519/Planning+CulturalHeritageJoint1-15-15.pdf
Planning Commission and Cultural Heritage Commission Joint Liaison Committee Meeting Agenda 1-15-15

REQUIREMENTS: Every owner, and every person in possession or control, of a historic property shall, to the maximum extent practicable, maintain and keep the property in good repair, as defined in sections 5-7-3 and 5- 7-4 of this code. In the event
http://www.beverlyhills.org/cbhfiles/storage/files/371887566592895800/Planning+CulturalHeritageJoint1-15-15.pdf
Sewer System Master Plan Report (Part 1)

Rainfall Analysis .......................................................................................... 6–3 6.2.1 Storm Event Analysis ............................................................................... 6–4 6.2.2 Design Storm Development
http://www.beverlyhills.org/cbhfiles/storage/files/1131594691360827252/SSMPReportPart1.pdf
Bid Document

required evidences of insurance within the required time period shall be cause for termination for default, and shall be cause for forfeiture of this bidder's bid security, if applicable. (e) In the event Contractor does not maintain current, valid
http://www.beverlyhills.org/cbhfiles/storage/files/1098876131465120683/DoorHardwareBidBoilerplate.pdf
April 2013

(310) 560-0693 Owner: Contractor: Description : REMOVE DRYWALL IN MASTER BEDROOM CLOSET TO EXPLORE DAMAGE FROM EXPLOSION JANIS DOUG WAGNER (310) 271-3212 BROWN K B CONSTRUCTION COMPANY (626) 574-7302 Owner: Contractor: Description : MECHANICAL
http://www.beverlyhills.org/cbhfiles/storage/files/1248893660607675066/imrap.pdf
May 2013

BS1307117 Building 5/8/2013 $60,000 BARNEY'S NEW YORK-BASEMENT STORAGE ROOMS9570 WILSHIRE BLVD $3,753.67 $3,753.67 $0.00 Description : PARTIAL DEMO FOR CANOPY AWNING TO EXPLORE STRUCTURAL ITEMS. 9601 SANTA MONICA LLC (310) 286-0117 PYRAMIDS
http://www.beverlyhills.org/cbhfiles/storage/files/6491018261819936995/imrap.pdf
Beverly Hills Women's Club Historic Assessment Report

criteria: 1. Is identified with important events in the main currents of national, state, or local history, or directly exemplifies or manifests significant contributions to the broad social, political, cultural, economic, recreational, or architectural
http://www.beverlyhills.org/cbhfiles/storage/files/12915605441450492091/BeverlyHillsWomen'sClub.pdf
Bid Document

of insurance within the required time period shall be cause for termination for default, and shall be cause for forfeiture of this bidder's bid security, if applicable. (e) In the event Contractor does not maintain current, valid evidence of insurance
http://www.beverlyhills.org/cbhfiles/storage/files/2688889231277044399/BidDocument.pdf
<<   1 ...   97   98   99   100   101   ... 117   >>