61°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
EOP 2013 Logistics Section

is damaged, report to alternate EOC, Fire Department training room or Public Works lunchroom. Post signs. 2. ASSUME EOC JOB  Set up your work station.  Open WebEOC and check in.  Put on appropriate vest. Print your name on the EOC organizational
http://www.beverlyhills.org/cbhfiles/storage/files/10253508741016672576/EOP2013LogisticsSection.pdf
EOP 2013 Logistics Section

is damaged, report to alternate EOC, Fire Department training room or Public Works lunchroom. Post signs. 2. ASSUME EOC JOB  Set up your work station.  Open WebEOC and check in.  Put on appropriate vest. Print your name on the EOC organizational
http://www.beverlyhills.org/cbhfiles/storage/files/353218389770674580/EOP2013LogisticsSection.pdf
Design Review Commission Application

I hereby certify that I am the owner(s) of the subject property and that I have reviewed the  subject application and authorize the Agent to make decisions that may affect my property on my  behalf.2                 Property Owner’s Signature & Date    Print Property Owner’s Name & Date  1  If the owner 
http://www.beverlyhills.org/cbhfiles/storage/files/15347280481938395805/DRCApplication2014-ActiveAppNew.pdf
C1056 Appendix D (Amd 3) - Tech Specs for Water

with a black asphaltic coating, Gibson- Homans “Black Jack Asphalt Enamel”, approximately one-mil thick, in accordance with the manufacturer’s printed instructions. (j) Bury Elbow: The bury elbow shall be as follows: Spec. 230 DIVISION F2
http://www.beverlyhills.org/cbhfiles/storage/files/121645808389704096/C1056-LaCienega-AppendixD(Amd3)-TechSpecsforWater.pdf
Specifications

be enlarged to a readable size. 4. Chart shall be a blackline print with a different color used to show the area of coverage for each station. 5. When completed and approved, the chart shall be hermetically sealed between two pieces of plastic, each piece
http://www.beverlyhills.org/cbhfiles/storage/files/285334430205435005/BidTechnicalSpecs.pdf
Addendum #2- Revised Drawings (1 of 2)

Project: 0825 Design: Date: Job No: 0825 Description: 10-7-11 2 2 2 1 E a s t W in s to n R o a d , S u it e A A n a h ei m , C a li fo r n ia 9 2 8 0 6 P h o n e: 7 1 4 7 7 6 -4 3 4 0 , F a x: 7 1 4 7 7
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9636--Revised Sheets.pdf
Specifications

and four prints of a preliminary construction schedule prepared in accordance with Part 3 of this Section. C. Construction schedule: Within 30 calendar days after the Contractor has received the Owner's Notice to Proceed, submit one reproducible
http://www.beverlyhills.org/cbhfiles/storage/files/1881952725325208288/Specifications.pdf
Consumer Confidence Report 2011

to learn more about the City and its services for residents and businesses. This publication was printed using soy-based ink and recycled paper. Par tners in Environmental Protect ion Use Water Wisely – Control Water Costs As your drinking water
http://www.beverlyhills.org/cbhfiles/storage/files/13575337981764240176/2011ConsumerConfidenceReport7-12-12.pdf
Consumer Confidence Report 2009

and its services for residents and businesses. This publication was printed using soy-based ink and recycled paper. WATER CONSERVATION THROUGH “SMART” IRRIGATION Most of our State’s water is used for irrigation. In order to preserve one of our greatest
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/7231--2009 Consumer Confidence Report.pdf
Consumer Confidence Report 2010

efforts. Log on to www.beverlyhills.org to learn more about the City and its services for residents and businesses. This publication was printed using soy-based ink and recycled paper. Electric Fountain Located at the intersection of North Santa Monica
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/8807--2010 Consumer Confidence Report 5-2-11.pdf
<<   1 ...   62   63   64   65   66   ... 74   >>