61°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
Addendum No. 1

the guarantee. Such warranties shall only supplement the guarantee. B. Record Drawings: 1. Contractor shall provide and keep up-to-date a complete record set of blueline ozalid prints which shall be corrected daily, showing every change from the original
http://www.beverlyhills.org/cbhfiles/storage/files/5326832911327907882/AddendumNo1.pdf
C1056 AUR La Cienega - Specs (Amd 5)

basis. If there is any chance of rain forecast within 48 hours, the forecast shall be printed out and kept with the SWPPP If the chance of precipitation is greater than 50%, the necessary water pollution control practices shall be deployed prior
http://www.beverlyhills.org/cbhfiles/storage/files/130603030161917600/C1056AURLaCienega-Specs(Amd5).pdf
Solar Photovoltaic Installation Guidelines (2008)

path from the array to the DC combiner box. The DC combiner boxes are to be located such that conduit runs are minimized in the pathways between arrays. To limit the hazard of cutting live conduit in venting operations, DC wiring shall be run
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/4425--Solar Photovoltaic Installation Guidelines.pdf
Horace Mann Afterschool Classes

this is a guitar-wailing, bass-thumping, drum-crashing experience you won’t want to miss! Students will perform LIVE at the 10th Annual Battle of the Bands at a top Los Angeles venue! Instruments are provided in class. Limited to 7 students maximum. No class 4/6. Grade:
http://www.beverlyhills.org/cbhfiles/storage/files/17613112191631002857/Spring2015_ASFlyer_HMFORWEB.pdf
FY 2015-16 CM Message

to prolong the lives of City facilities and infrastructure, the City continues its spending program for CIP., The proposed budget includes $10 million combined contributions of $5 million each to the Infrastructure (Fund 600) and Capital Assets (Fund 405)
http://www.beverlyhills.org/cbhfiles/storage/files/10430732491581105879/CMMessage15-16Proposed-Final.pdf
February 2015

HILLCREST RD $18,755.53 $18,755.53 $0.00 BS1432080 Building 2/24/2015 $20,000 CONVERT GARAGE INTO LIVING SPACE 159 WILLAMAN DR, N $2,872.34 $2,872.34 $0.00 BS1432606 Building 2/5/2015 $82,000 "L'ERMITAGE HOTEL"- T.I. 9291 BURTON WAY $5,208.94 $5,208.94
http://www.beverlyhills.org/cbhfiles/storage/files/11875325781072108989/February2015.pdf
April 2015

BUILDER) Owner: Contractor: Description : NEW BBQ OXFORD CONSTRUCTION (949) 202-4516 Owner: Contractor: Description : UNIT 204 - KITCHEN REMODEL, TWO BATHROOMS PARTIAL REMODEL AND REPLACE LIVING ROOM FLOORING WITH WOOD FLOOR WITH ACOUSTICORK
http://www.beverlyhills.org/cbhfiles/storage/files/14756115601867340400/April2015.pdf
Admin Report Febraury 2015

TO GO LIVE BEFORE THE END OF THE FISCAL YEAR. POLICE CADET PROGRAM INCREASE J. KIM 100% ON TARGET FOR COMPLETION BY END OF FY PROGRAM HAS CHANGED TO DEPLOY CADETS THROUGHOUT THE DEPARTMENT, INCLUDING THE PATROL BUREAU. Page 7 of 7 BEF RESPONSIBLE
http://www.beverlyhills.org/cbhfiles/storage/files/19791618841785960257/February2015AdminReport.pdf
Admin Report April 2015

IN ORDER TO GO LIVE BEFORE THE END OF THE FISCAL YEAR. TEMPORARY CRIME SUPPRESSION UNIT OVERTIME MORENO 0% ON TARGET FOR COMPLETION BY END OF FY FUNDS WILL BE USED ON AN AS-NEEDED BASIS. TEMPORARY CRIME SUPPRESSION UNIT WORKING TWO WEEKS IN JANUARY
http://www.beverlyhills.org/cbhfiles/storage/files/8243841021362416762/April2015AdminReport.pdf
EOP 2013 Logistics Section Supporting Materials

and preservation of the lives and property of the people of the state from the effects of natural, manmade, or war- caused emergencies which result in conditions of disaster or in extreme peril to life, property, and resources is of paramount state importance
http://www.beverlyhills.org/cbhfiles/storage/files/278664374782835273/2013EOPLogisticsSectionSupportingDocumentation.pdf
<<   1 ...   63   64   65   66   67   ... 79   >>