63°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
Sewer System Master Plan Report (Part 1)

Rainfall Analysis .......................................................................................... 6–3 6.2.1 Storm Event Analysis ............................................................................... 6–4 6.2.2 Design Storm Development
http://www.beverlyhills.org/cbhfiles/storage/files/1131594691360827252/SSMPReportPart1.pdf
Horace Mann Afterschool Classes

this is a guitar-wailing, bass-thumping, drum-crashing experience you won’t want to miss! Students will perform LIVE at the 10th Annual Battle of the Bands at a top Los Angeles venue! Instruments are provided in class. Limited to 7 students maximum. No class 4/6. Grade:
http://www.beverlyhills.org/cbhfiles/storage/files/17613112191631002857/Spring2015_ASFlyer_HMFORWEB.pdf
Supplemental Accessibility No. 4 Plan Review Checklist

and the number of beds provided. (1111B.4.1) 4. Where provided as part of an accessible unit, sleeping room or suite, the following spaces shall be accessible and shall be on an accessible route complying with Section 1114B.1.2: a. The living area: b.
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/5170--2008 LARUCP Plan Review List - Supplemental Accessibility No 4 v1.0.pdf
Solar Photovoltaic Installation Guidelines (2008)

path from the array to the DC combiner box. The DC combiner boxes are to be located such that conduit runs are minimized in the pathways between arrays. To limit the hazard of cutting live conduit in venting operations, DC wiring shall be run
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/4425--Solar Photovoltaic Installation Guidelines.pdf
August 2013

: INSTALLATION OF SHELVING. BALLREICH INVESTMENTS LLC AND (760) 438-9114 Dickinson Cameron Constrution Inc. (760) 438-9114 Owner: Contractor: Description : INSTALL HARDWOOD FLOORING OVER AQUISTICORK UNDERLAYMENT, LIVING ROOM & MASTER SUITE AND REMODEL
http://www.beverlyhills.org/cbhfiles/storage/files/5780437561546066776/imrap.pdf
March 2013

S 3 $691.45 $691.45 $0.00 Description : UNIT 301 - INTERIOR REMODEL, NON-STRUCTURAL CONDO REMODEL, KITCHEN, BATHROOM, LIVING ROOM AND CHANGE FLOORING SGH INVESTMENTS LLC (000) 000-0000 ALBINO CONSTRUCTION INC (310) 454-9908 Owner: Contractor: Description
http://www.beverlyhills.org/cbhfiles/storage/files/1536070386635777986/imrap.pdf
May 2014

Activity Report - Building Permits of 20Page 2 6/2/2014 09:37AM Permit Status: ISSUEDTo5/1/2014 5/31/2014 Page 2 PERMIT TYPE ISSUED Valuation Project Address FEES PAID Due BS1331864 Building 5/15/2014 $675,000 LIVE NATION-OFFICE T.I. 9441 OLYMPIC BLVD
http://www.beverlyhills.org/cbhfiles/storage/files/7720279041961675156/May2014.pdf
July 2014

additional area- replacing the entire roof Goldie Cohen (310) 770-5667 A P W BUILDERS INC (818) 982-4279 Owner: Contractor: Description : LEGALIZE CONVERSION FROM STORAGE TO LIVING UNIT ABOVE THE GARAGE. ADD 130 SQ.FT. (OWNER BUILDER) HILDA & MARK
http://www.beverlyhills.org/cbhfiles/storage/files/374140424311440640/July2014.pdf
February 2015

HILLCREST RD $18,755.53 $18,755.53 $0.00 BS1432080 Building 2/24/2015 $20,000 CONVERT GARAGE INTO LIVING SPACE 159 WILLAMAN DR, N $2,872.34 $2,872.34 $0.00 BS1432606 Building 2/5/2015 $82,000 "L'ERMITAGE HOTEL"- T.I. 9291 BURTON WAY $5,208.94 $5,208.94
http://www.beverlyhills.org/cbhfiles/storage/files/11875325781072108989/February2015.pdf
Bid- Angelus Waterproofing

and the Contract Documents for PARKING FACILITIES WATERPROOFING PROJECT, HEREBY PROPOSES AND AGREES to commence the Work per the Agreement: to furnish all labor, materials, equipment, transportation, service, sales taxes, and other costs necessary to complete
http://www.beverlyhills.org/cbhfiles/storage/files/13519027321672611056/Bid-Angelus.pdf
<<   1 ...   145   146   147   148   149   ... 156   >>