68°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
Specifications (2 of 2)

signs, geometric restrooms signs, evacuation plans, exterior regulation signage, exterior directional signage and exterior building signs. 1.02 DEFINITIONS A. Accessible Route: A continuous unobstructed path that complies with ADA, CBC
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9569--specs 2.pdf
C1056 Appendix D (Amd 3) - Tech Specs for Water

W E S T S I D E S U B W A Y E X T E N S I O N P R O J E C T APPENDIX D TECHNICAL SPECIFICATIONS FOR WATER Specifications D101 Developer - Installed Water Distribution Facilities As used in these spec
http://www.beverlyhills.org/cbhfiles/storage/files/121645808389704096/C1056-LaCienega-AppendixD(Amd3)-TechSpecsforWater.pdf
1184-1193 Loma Linda Drive Final Initial Study - Mitigated Negative Declaration

during construction would occur between the hours of 9:30 AM and 4:00 PM. The proposed haul route would utilize Santa Monica Boulevard, Beverly Drive, Coldwater Canyon Drive and Loma Linda Drive. The applicant’s contractor would implement construction
http://www.beverlyhills.org/cbhfiles/storage/files/848788981190635225/FinalLomaLindaDrMND.pdf.pdf
1184-1193 Loma Linda Drive Final Mitigated Negative Declaration

during construction would occur between the hours of 9:30 AM and 4:00 PM. The proposed haul route would utilize Santa Monica Boulevard, Beverly Drive, Coldwater Canyon Drive and Loma Linda Drive. The applicant’s contractor would implement construction
http://www.beverlyhills.org/cbhfiles/storage/files/1497820002169687145/FinalLomaLindaDrMND.pdf.pdf
Bicycle Racks Presentation 3-21-2012

of structure  CITY BUILDINGS/LOCATIONS City Hall Public Works Satellite locations Parks  Beverly Gardens Park:  Near possible future bike route adjacent to Beverly Dr or Crescent Dr  La Cienega Park:  NW section near the “La
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/10434--BICYCLE RACKS_03-21-12final.pdf
Historic Resources Inventory (1985-1986)

and a long grove of eucalyptus ran along the approximate route of Charle yule. All of the area south of Wilshire, west of Roxbury, and east of Foothill was vacant. However, by the end of the decade the City was largely developed, and had assumed the basic
http://www.beverlyhills.org/cbhfiles/storage/files/6333100111590038901/HistoricResourcesInventory(1985-1986).pdf
Beverly Hills City Council Approves Strict Metro Construction Mitigation Measures

Approves Strict Metro Construction Mitigation Measures Limits Hours and Nighttime Activity for Utility Relocation Beverly Hills, CA – The Beverly Hills City Council on Aug. 19 approved an agreement with the Los Angeles County Metropolitan
http://www.beverlyhills.org/cbhfiles/storage/files/2024331101706890606/MetroConstructionMitigationMOA-FINAL.pdf
01-08-14 Memo

be replaced due to inadequate capacity and/or condition. Replacing underground utilities requires removal and replacement of the pavement in the location of the construction. Further, the construction requires heavy equipment which is destructive
http://www.beverlyhills.org/cbhfiles/storage/files/1090632649119212680/01-08-14Memo.pdf
Specifications- Irrigation

with work under this Section. B. Exercise extreme care in excavating and working near existing utilities. Contractor shall be responsible for damages to utilities which are caused by his operations or neglect. Check existing utilities drawings
http://www.beverlyhills.org/cbhfiles/storage/files/9969727391891359900/328400-Irrigation.pdf
Addendum No. 1

Exercise extreme care in excavating and working near existing utilities. Contractor shall be responsible for damages to utilities which are caused by his operations or neglect. Check existing utilities drawings for existing utility locations. C.
http://www.beverlyhills.org/cbhfiles/storage/files/5326832911327907882/AddendumNo1.pdf
<<   1 ...   22   23   24   25   26   ... 106   >>