68°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker
Search Website
Search
6-7-12 DRC Minutes

proportion, and utilizing a simple molding at the top. > Consider removing the horizontal banding along the façade. It is too heavy and thick and is a distraction from the house. > The landscape plan needs to be clarified and easier to read with consistency
http://www.beverlyhills.org/cbhfiles/storage/files/12554076051228189153/mtg.min.06.07.12finalsigned.pdf
Specifications- Irrigation

with work under this Section. B. Exercise extreme care in excavating and working near existing utilities. Contractor shall be responsible for damages to utilities which are caused by his operations or neglect. Check existing utilities drawings
http://www.beverlyhills.org/cbhfiles/storage/files/9969727391891359900/328400-Irrigation.pdf
Sample Contract

single limit, covering any vehicle utilized by CONTRACTOR in performing the Scope of Work required by this Agreement. (3) Workers' compensation insurance as required by the State of California. (4) Professional Liability Insurance. A policy
http://www.beverlyhills.org/cbhfiles/storage/files/7126610391424302309/SampleContractBid14-06pdf.pdf
Addendum No. 1

Exercise extreme care in excavating and working near existing utilities. Contractor shall be responsible for damages to utilities which are caused by his operations or neglect. Check existing utilities drawings for existing utility locations. C.
http://www.beverlyhills.org/cbhfiles/storage/files/5326832911327907882/AddendumNo1.pdf
RFP Document

single limit, covering any vehicle utilized by Selected Respondent in performing the services required by the Agreement. 3-3. Selected Respondent agrees to maintain in force at all times during the performance of work under the Agreement workers'
http://www.beverlyhills.org/cbhfiles/storage/files/6512664911965618132/BidNo13-13(Rentals)10-12-12.pdf
RFP 13-21 Historic Resources Survey and Update

context statement, 6) survey results/findings, 7) recommendations for future studies, 8) sources, and 9) maps and other exhibits, as appropriate. Footnotes should be utilized as appropriate. Final report will also include complete lists of those
http://www.beverlyhills.org/cbhfiles/storage/files/1892778280945022038/RFP13-21HistoricResourcesSurveyandUpdate.pdf
EOP 2013 Planning and Intelligence Section Supporting Materials

may be utilized as a data gathering tool. Data Organization and Structuring There are many approaches to structuring and organizing compiled data. Some questions to consider before preparing the AAR include: What is the purpose
http://www.beverlyhills.org/cbhfiles/storage/files/929069709412902071/2013EOPPlanningIntelSupportingDocumentation.pdf
EOP 2013 Planning and Intelligence Section Supporting Materials

may be utilized as a data gathering tool. Data Organization and Structuring There are many approaches to structuring and organizing compiled data. Some questions to consider before preparing the AAR include: What is the purpose
http://www.beverlyhills.org/cbhfiles/storage/files/9126039241026565659/2013EOPPlanningIntelSupportingDocumentation.pdf
Shannon and Wilson Report on Westside Subway Extension Project

ground losses before they progress up to ground surface to impact utilities and structures. Ground improvement methods such as jet grouting, soil/cement mixing, permeation grouting, compaction or compensation grouting, dewatering, and freezing,
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/10400--51-1-10024-003 R01Final.pdf
RFP Document

During the Term of the Agreement, the City reserves the right to purchase an A/R system; moreover, once purchased and implemented, Operator agrees to utilize the City owned system. o 438 N. Beverly Drive/439 N. Cannon Drive (Valet Services: Thursday,
http://www.beverlyhills.org/cbhfiles/storage/files/5633742681411537443/RFPBeverlyHillsParkingLocations.pdf
<<   1 ...   65   66   67   68   69   ... 75   >>