63°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
October 2013

N $3,293.19 $3,293.19 $0.00 Description : REINFORCE ROOF FRAMING AND ADD SHEAR WALLS RAISE CEILING HT IN LIVING ROOM - REPLACE SUDERS. CARLO & SONIA DOLLERO (310) 278-8154 BONURA C J BUILDING (323) 478-0101 Owner: Contractor: Description : Shoring
http://www.beverlyhills.org/cbhfiles/storage/files/290360286793993694/imrap.pdf
Bid Documents

shall be modified and reinforced with a welded steel framework. The rear window openings on each side of the module access shall be covered with 14 ga. steel and painted to match the body. 2 MODULAR CONSTRUCTION All material utilized
http://www.beverlyhills.org/cbhfiles/storage/files/4229949761563551655/biddoc12-31.pdf
Exponent Report on Metro's Safety and Seismic Findings

recommended. This effort should be coordinated with utility organizations to determine if any sensitive supply lines exist that should be repaired or replaced before tunneling commences in that area. Other utilities, such as storm drain systems, may
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/10153--Report - Assessment of Westside Subway Extension_Final.pdf
9900 Wilshire Blvd Draft EIR

....................................................................4.11�1� 4.12� Utilities�and�Service�Systems .......................................................................................................4.12�1� 4.12.1� Water
http://www.beverlyhills.org/cbhfiles/storage/files/1448187562158216332/CombinedDraftEIR.pdf
TAB 2 - Tory Burch

Commission at a later date. The project preview occurred on September 19, 2012, and the Architectural Commission unanimously supported the proposed design. Specifically, the Commission felt that the project utilizes high quality design and materials,
http://www.beverlyhills.org/cbhfiles/storage/files/503711412342292992/TAB2-ToryBurch.pdf
Gateway FEIR Volume 2

& Hazardous Materials Hydrology/Water Quality Land Use/Planning Mineral Resources Noise Population/Housing Public Services Recreation Transportation/Traffic Utilities/Service Systems Mandatory Findings of Significance Initial Study Beverly Hills
http://www.beverlyhills.org/cbhfiles/storage/files/1786631115284172993/GatewayFEIRVol2.pdf
Beverly Hills In Focus - September 2008

information on life-saving steps to prepare for a disaster. municipal resources likely will not be readily available. For that reason, people must be prepared to live self- sufficiently for five to seven days. 3 Speak Up and Be Counted! BEVERLY HILLS
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/4138--InFocus_Sept08_FINAL_for_WEB.pdf
Beverly Hills In Focus - October 2008

6 C ome and be dazzled November 22 when the City of Beverly Hills and UNICEF once again join to “Light the Night.” Fun-filled festivities at the intersection of Rodeo Drive and Wilshire Boulevard begin at 3 p.m. with live mu- sical entertainment
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/4280--InFocus_Oct08_WEB.pdf
Beverly Hills In Focus - July 2008

time to the community. They check in on elderly residents; serve as role models, as well as educators, for Beverly Hills children; and excel at protecting lives and property against fire and other disasters. All in a day’s work: Along with promoting
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/3621--In Focus News July2008 web sm.pdf
Concrete Shear Wall Plan Review Checklist

walls. (ASCE-7 T-12.2-1) 3. In storage and warehouse occupancies, include a minimum 25% of the floor live load for the seismic dead load, W. (ASCE-7 Section 12.7.2.1) 4. The shear strength reduction factor, "Φ" shall be per ACI- 318 Section
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/5204--2008 LARUCP Plan Review List - Concrete Shear Wall v1 0.pdf
<<   1 ...   74   75   76   77   78   ... 94   >>