81°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
Did you mean:login
Addendum #2- Revised Specs and Bid Appendices

software, tools and instruments (only available from vendor, specific to a piece of equipment) required for testing equipment shall be provided at no additional cost. B. Data-logging equipment required to test equipment will be provided by the CA,
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9635--Addendum #2 revised specs and bid docs.pdf
Consumer Confidence Report 2010

efforts. Log on to www.beverlyhills.org to learn more about the City and its services for residents and businesses. This publication was printed using soy-based ink and recycled paper. Electric Fountain Located at the intersection of North Santa Monica
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/8807--2010 Consumer Confidence Report 5-2-11.pdf
Consumer Confidence Report 2009

for the entire community to enjoy. This publication was created by the City of Beverly Hills, Department of Public Works & Transportation, as part of its Environmental Programs outreach efforts. Log on to www.beverlyhills.org to learn more about the City
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/7231--2009 Consumer Confidence Report.pdf
Consumer Confidence Report 2012

2012 Consumer Confidence Report Beverly Hills This publication was created by the City of Beverly Hills, Department of Public Works & Transportation, as part of its Environmental Programs outreach efforts. Log on to www.beverlyhills.org to learn
http://www.beverlyhills.org/cbhfiles/storage/files/3894572091712043185/2012ConsumerConfidenceReport.pdf
Specifications (2 of 2)

5 PART 3 EXECUTION 3.01 EXAMINATION A. Do not begin application of coatings until substrates have been properly prepared. B. Verify that surfaces are ready to receive work as instructed by the product manufacturer.C. Examine surfaces sched
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9569--specs 2.pdf
2008 Guidelines for Evaluating and Mitigating Seismic Hazards in California

5. Logs of borings, test pits, or other subsurface data obtained. 6. Geologic cross sections depicting the most critical (least stable) slopes, geologic structure, stratigraphy, and subsurface water conditions, supported by boring and/or
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/4288--SP117-091508.pdf
Bid 13-17: Audio/Visual and Television Production System Improvements

of potential respondents, and posted on the City’s website. If a Contractor would like to be added to the City’s list of potential respondents, a request must be emailed or logged through the City’s website. Respondents’ Orientation: Each
http://www.beverlyhills.org/cbhfiles/storage/files/16208508671643346876/CityHallAVBid2012-10-24-12.pdf
Sample Agreement

responsibility of Vendor, including, but not limited to, maintaining the casings of the cameras included in the Vendor Photo Red Light System and all other related Equipment in reasonably clean and graffiti-free condition. Vendor shall maintain logs of each
http://www.beverlyhills.org/cbhfiles/storage/files/15483699701525566357/PhotoRedLIght-RFPSampleAgreement6_16_14(2).pdf
RFP Document

system failures and electronically notify the Vendor of such failures and system shut down. Vendor to maintain maintenance logs and provide methods for calibration, including self- calibration, of the equipment. 5-2.24 The Vendor’s digital camera
http://www.beverlyhills.org/cbhfiles/storage/files/1894421661071287938/PhotoRedLight-RFPfinal.pdf
Appendix B- Rules and Regulations

APPENDIX B CITY OF BEVERLY HILLS TAXICAB FRANCHISE RULES AND REGULATIONS Scope and Intent: These rules and regulations ("Rules") established by the Beverly Hills Public Works Services pursu
http://www.beverlyhills.org/cbhfiles/storage/files/460074149912108665/BHRFPRulesRegulations52814Draft.pdf
<<   1 ...   10   11   12   13   14   ... 17   >>