71°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
Specifications

Systems 4) Janus Pana40 Plus 5) Janus Pana Chrome 3D, with voice annunciation 6) Tritronics Leading Edge c. The system shall be able to detect a 2 inch diameter rod introduced at any position within the door movement and between the height
http://www.beverlyhills.org/cbhfiles/storage/files/43862405566245550/Specifications.pdf
FY 2015-16 Budget in Brief

After reviewing the requests I recommended 96 of them, plus 3 additional only if the Water Enterprise plan is approved. The total cost of recommended enhancements was $8.3 million. The three enhancements contingent upon approval of the Water Enterprise
http://www.beverlyhills.org/cbhfiles/storage/files/1611665813493690750/FY2015-16BudgetInBrief.pdf
North Santa Monica Boulevard Bid Addendum No. 5

on your traffic control during stage C1 & D1, it won’t work. The present street width from curb flag to curb flag is approximate 58 feet. To place 3 lanes (2 west, 1 east) will take 33 feet plus 1 foot between edge of lane and edge of excavation,
http://www.beverlyhills.org/cbhfiles/storage/files/980809595410642649/NorthSantaMonicaBoulevardAddendumNo.5.pdf
Attachment I : Section 5- Scope of Work

Granicus webcasting unit (video/audio input plus LAN) shall be integrated and programmed into the TV production system by the AV Contractor. Cameras Four new Panasonic AW-HE50SN remote pan/tilt SDI/HD-SDI cameras are to be installed in the Room
http://www.beverlyhills.org/cbhfiles/storage/files/10479625151551416730/SECTION5-SCOPEOFWORK.pdf
FY 2007-08 Budget

of $6 million. Based on the advice and counsel from a variety of sources that the economy is softening (and may even see a downturn in the coming year to 18 months), plus building in the additional expenses associated with continuing the service
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/2615--FY 2007-08 Budget.pdf
CAFR 2015

departments submitted 111 requests for budget enhancements. The amount requested was $11.4 million. After staff reviewed the requests, 96 of them were recommended to the City Council, plus 3 additional only if the Water Enterprise plan is approved. The total
http://www.beverlyhills.org/cbhfiles/storage/files/17143408231915368465/CAFR2015.pdf
Zone 9 Specs

of work, and no additional compensation will be allowed therefore. Section 3-3.2.2 shall be changed as follows: (a) Labor. The costs of labor will be the actual cost for wages of workers performing the extra work at the time the extra work is done, plus
http://www.beverlyhills.org/cbhfiles/storage/files/7081940311159332759/Zone9Specs.pdf
Entertainment Business District Draft EIR

...................................................................................... 3-135 3.7-7 Project Trip Generation ................................................................. 3-137 3.7-8 Existing Plus Project Intersection Impacts..................................... 3-140 3.7-9 Existing Plus Project Residential
http://www.beverlyhills.org/cbhfiles/storage/files/67494711058728427/EntertainmentBusinessDistrictDraftEIR.pdf
Gateway FEIR Volume 2

.............................................. 4.8-19 Table 4.8-9 Project Trip Generation and Existing Use Trip Credits ............................ 4.8-21 Table 4.8-10 Intersection Levels of Service – Existing Plus Project Conditions (Parcels 1-3) AM, Mid-Day, and PM Peak Hours
http://www.beverlyhills.org/cbhfiles/storage/files/1786631115284172993/GatewayFEIRVol2.pdf
C1056 Appendix D (Amd 3) - Tech Specs for Water

The coat shall be applied at 3 to 6 mils DFT. [3] External Coating System Total Thickness: The total dry film thickness of the completed coating system shall be 20 mils plus or minus 6 mils. The completed coating surface shall be free from
http://www.beverlyhills.org/cbhfiles/storage/files/121645808389704096/C1056-LaCienega-AppendixD(Amd3)-TechSpecsforWater.pdf
<<   1 ...   23   24   25   26   27   ... 38   >>