60°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker
Search Website
Search
PREQUALIFICATION PACKAGE FOR THE CONSTRUCTION OF FOUR CITY GATEWAY MONUMENTS

partners or owners connected to any other construction firms. NOTE: Include information about other firms if an owner, partner, or officer of your firm holds a similar position in another firm. Yes No If “yes,” explain on a separate signed
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/10065--GATEWAYPrequal Published_Project #12-20 1-19-2012.pdf
CALGreen (GC-1) Residential Checklist Table A4.602

A4.407.1 Install foundation and landscape drains. A4.407.2 Install gutter and downspout systems to route water at least 5 feet away from the foundation or connect to landscape drains which discharge to a dry well, sump, bioswale, rainwater
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/8533--GC-1 Residential CALGreen checklist.pdf
Energy Efficiency Plan Review Checklist

Spa heaters Except for household cooking appliances without an electrical supply voltage connection and in which each pilot consumes less than 150 Btu/hr. [Title 24, Part 6, Chapter 2, Section 115] 11. Manufactured fenestration products
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/5165--2008 LARUCP Plan Review List - Energy Efficiency v1.0.pdf
Final Map Submittal Process & Checklist

[etc..._________] purposes so designated on said map and all uses incident thereto, including the right to make connections therewith from any adjoining properties.] [We hereby grant Lot ____ in fee simple to the City of Beverly Hills.] [While all of ____
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/6953--Final Map Submittal_Checklist.pdf
5-15-13 AC Minutes

on Wednesday, May 15, 2013. Page 12 of 15 Architectural Commission Meeting Minutes May 15, 2013 2. Any signs mounted to the brick façade of the building shall be installed to ensure that the connections are made directly Into the grout
http://www.beverlyhills.org/cbhfiles/storage/files/6947617721317896638/5-15-13MinutesSIGNED.pdf
Bid- Pacific Waterproofing

to the City of Beverly Hills (hereinafter, “City’) for the PARKING FACILITIES WATERPROOFING PROJECT; AND WHEREAS, said Principal is required to furnish a bond in connection with said bid, to ensure that the Principal will enter into a contract with the City;
http://www.beverlyhills.org/cbhfiles/storage/files/6032274711703114234/Bid-PacificWaterproofing.pdf
Addendum #6

OUTSTANDING RFI #43 Chilled water pipe can run at low elevation but not too low to cause trip hazard (min 30" above floor) the front of the chillers is clear for access of technicians. The back where pipes connect does not need to be cleared from pipes.
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9777--11-14-11 Addendum No 6 (2).pdf
9-21-11 AC Minutes

the following elements: > Lighting details and a night time study Project connection details Landscape plan > Details of the proposed fences, walls and railings. Minutes of the meeting of September 21, 2011 Architectural Commission Page 9 AYES:
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9784--9-21-11 Minutes - Signed.pdf
Architectural Review Application

 Provide details which indicate how the façade materials will  connect to  each other.    Provide a detail of all proposed elements including window surrounds,  entry surrounds, decorative details, etc.   Provide detail of how the storefront connects to adjacent storefronts.  DOOR AND WINDOW SCHEDULE 
http://www.beverlyhills.org/cbhfiles/storage/files/4879845591054439824/ACApplication-ActiveApp_2013.pdf
April 2013 Agenda

and personal contact from March 11, 2013 through July 31, 2013. Dinner to be held at the Beverly Wilshire Hotel on June 4, 2013. Raise funds for epilepsy research, epilepsy specialty care, and provide programs that care for and connect children
http://www.beverlyhills.org/cbhfiles/storage/files/11760941351443777417/CSCag04-2013.pdf
<<   1 ...   50   51   52   53   54   ... 56   >>