65°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
FAQ - Why can't I get BHTV on channel 10?

Time Warner Cable converted BHTV to a digital channel. If you have an older TV connected directly to the cable, you won't be able to receive the channel without a Time Warner digital adapter or a digital converter box. Other channels affected
https://clients.comcate.com/reps/logFAQHit.php?ag=31&faqid=9845
C1056 Appendix D (Amd 3) - Tech Specs for Water

and a bury elbow, bolted together so as to operate without leakage at the rated pressure. 6. Bolts, Nuts, and Gaskets: Solid bolts used to connect the bury elbow to the lower flange joint of the bury midsection shall comply with ASTM A 307,
http://www.beverlyhills.org/cbhfiles/storage/files/121645808389704096/C1056-LaCienega-AppendixD(Amd3)-TechSpecsforWater.pdf
Addendum - Non-Collusion Affidavit

or person to submit a collusive or sham proposal in connection with such contract or to refrain to submitting a proposal in connection with such contract, or have in any manner, directly or indirectly, sought by unlawful contract or connivance with any
http://www.beverlyhills.org/cbhfiles/storage/files/865344981119140941/AddendumtoPhotoRedLightRFP-NonCollusionAffidavitPDF.pdf
Overdrive for iPad, iPhone, and iPod Touch

to download. Once it is downloaded, you do not need to be connected to wifi to read or to listen to the book.
http://www.beverlyhills.org/cbhfiles/storage/files/17432980471993781718/Overdrive_iPad.phone.pod.pdf
City Accomplishments 2013

Enforcement actions  Completed intersection upgrades to accommodate fiber optic cable and power connection to facilitate future upgrades to City’s CCTV System.  Finalized a Master Lease Agreement with AT&T for the installation of 76 oDAS nodes
http://www.beverlyhills.org/cbhfiles/storage/files/367811229206579072/FY2013-14AccomplishmentsTK-CITYWIDE.pdf
ADDENDUM NO. 1

submittals. The Contractor shall assume all responsibility for the dimensions and the design of adequate connections and details. 2-14 ITEMS OF WORK 2-14.1 ITEMS 1. TRENCH SAFETY MEASURES - Under Item 1 the lump sum bid price shall include the cost
http://www.beverlyhills.org/cbhfiles/storage/files/9780328551516065455/Bid12-43ADENDDUMNo17-19-12.pdf
Title 1 - GENERAL PROVISIONS Chapter 3: CODE VIOLATIONS Article 2. Citation Procedure 1-3-201: Issuance Of Citations By Designated Employees

such officers or employees have the duty to enforce, and the violation has been committed in the presence of such officers or employees. B. In any case in which a person is arrested pursuant to this authority and the person arrested does not demand
http://sterlingcodifiers.com/codebook/index.php?book_id=466§ion_id=185193&keywords=
Specifications

or equipment installed or furnished that do not meet the City standards will be rejected and shall be removed from the site at no expense to the City. 2.02 PIPE: A. Pressure supply line from point of connection through backflow prevention unit shall
http://www.beverlyhills.org/cbhfiles/storage/files/4092463011319944384/Specifications.pdf
Shannon and Wilson Report on Westside Subway Extension Project

not appear to be active based on the trenching completed at BHHS, but as discussed above, should be confirmed with additional trenching along Santa Monica Boulevard. 2.0 INTRODUCTION The proposed WSE will be a heavy-rail subway connecting
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/10400--51-1-10024-003 R01Final.pdf
Beverly Hilton Revitalization Project Nears Approval

the project, visit the City’s website at www.beverlyhills.org and click on ‘Beverly Hilton Revitalization Plan’ on the homepage or call the Community Development Department at (310) 285-1123.
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/2722--Hilton Project Press Release04-21-08 revised.pdf
<<   1 ...   6   7   8   9   10   ... 50   >>