66°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
Proposed Municipal Employees' Association (MEA) 2015-2019 MOU (Tracked Changes)

organization, representing all its members within the Technical Service Unit (hereinafter referred to as "Employees"), and duly authorized representatives of the management of the City of Beverly Hills (hereinafter referred to as "the City"), have met
http://www.beverlyhills.org/cbhfiles/storage/files/10021892161085686140/MEA_Full-Time_2015-2019_MOU_TrackedChanged_FinalProposed_Posted01.19.16_2.pdf
Proposed Municipal Employees' Association (MEA) 2015-2019 MOU

organization, representing all its members within the Technical Service Unit (hereinafter referred to as "Employees"), and duly authorized representatives of the management of the City of Beverly Hills (hereinafter referred to as "the City"), have met
http://www.beverlyhills.org/cbhfiles/storage/files/391785772929818401/MEA_Full-Time_2015-2019_MOU_CleanCopy_NoTrackedChanges_FinalProposed_Posted01.19.16.pdf
West Coast Arborists - City of BH Contract

All data, information, documents and drawings prepared for CITY and required to be furnished to CITY in connection with this Agreement shall become the property of CITY, and CITY may use all or any portion of the work submitted by CONTRACTOR
http://www.beverlyhills.org/cbhfiles/storage/files/977079998670633320/12-21-10WestCoastArborists.pdf
Supplemental Accessibility No. 4 Plan Review Checklist

are provided, at least one half bath; g. Carports, garages or parking spaces. 5. Guest rooms and suites shall be on an accessible route complying with Section 1114B.1.2. An accessible route shall also connect all accessible spaces and elements,
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/5170--2008 LARUCP Plan Review List - Supplemental Accessibility No 4 v1.0.pdf
6-20-12 AC Minutes

connection details for the façade ribbons. > Please provide information on how the façade will be maintained and cleaned. > If mockups have been prepared for the façade materials, please provide either photographs of the mock-ups or bring samples
http://www.beverlyhills.org/cbhfiles/storage/files/10158734991422579907/6-20-2012ACMinutes.pdf
Virginia Robinson Estate Historic Assessment Report

on the terraced hillsides. A lush palm grove, with some unusually large specimens, dominates the landscape architecture embracing the northeast portion of the main house. A wide, grassy mall connecting the main house to the playhouse pavilion delineates
http://www.beverlyhills.org/cbhfiles/storage/files/11191886931030424678/VirginiaRobinsonEstate.pdf
North Santa Monica Boulevard Reconstruction Notice to Bidders

Brooks Catch Basin Number 1212 with Traffic Grates or Traffic Covers 46 24 Each Remove and Construct Junction Structure 47 1 Each Remove and Construct Transition Structure 48 16 Each Construct Concrete Connections 49 57 Each Construct Local
http://www.beverlyhills.org/cbhfiles/storage/files/7988627211806294354/NorthSantaMonicaReconstructionNoticetoBidders.pdf
Proposed Utility Rates

Utility Rates & Fees BHMC 6-1- REFERENCE T Y P E O F U T I L I T Y C H A R G E Inside Outside Inside Outside Inside Outside City City City City City City Water 88-R-7759 Service Connection Charge: General 1" and smaller 670.46
http://www.beverlyhills.org/cbhfiles/storage/files/120252671152874575/ProposedUtilityRates.pdf
Bid 14-30: Citywide Pavement and Curb Markings Notice to Bidders

under the supervision of a California lincensed Land Surveyor or a Civil Engineer authorized to perform such work. The Contractor shall provide the City a copy of the office calculations and documents submitted to the County for filing in connection
http://www.beverlyhills.org/cbhfiles/storage/files/15821815001406795513/Bid14-30NoticetoBidders.pdf
Bid 14-21: Addendum 2 (3-6-14)

2,000 LinearFeet Remove and dispose of abandoned or interfering portions of pipe (if needed) 24 120 Each Remodel sewer lateral connection (if needed) 25 48 Each Remove and reconstruct 8-inch PCC alley approach (ifneeded) Copies of the Plans,
http://www.beverlyhills.org/cbhfiles/storage/files/10004709401990538145/bID14-21Addendum22014-03-06.pdf
<<   1 ...   140   141   142   143   144   ... 175   >>