69°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
Health and Safety Commission Minutes - March 18, 2013

on the recent letter and FAQ sheet on the City’s water quality sent out to residents on March 11,2013. Samples of Beverly Hills drinking water taken in December 2012 showed the presence of common, generally non-harmful coliform bacteria that registered slightly
http://www.beverlyhills.org/cbhfiles/storage/files/170307582179996641/03.18.13.pdf
01-08-14 Presentation

Connectivity Safety • Promotes Safe Shared Multi-Modal Access Function • Improves Multi-Modal Roadway Operation Aesthetics - Project Element Criteria Evaluation 16 9. Pedestrian Connectivity Safety • Promote Shared Multi- Modal Access
http://www.beverlyhills.org/cbhfiles/storage/files/1703905873177984545/01-08-14Presentation.pdf
Urban Water Management Plan 2010

two connections with MWD’s Santa Monica Feeder System. Those connections are designated as Beverly Hills One and Two (BH-1 & BH connection has a capacity of 40 together are capable of delivering up to BEVERLY HILLSURBAN WATER MANAGEMENT PLAN
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9152--Urban Water Management Plan 2010_8-30-11.pdf
Draft 2014-2021 Housing Element Appendix B

City of Beverly Hills General Plan 2014-2021 Draft Housing Element Update B-1 | P a g e Appendix B: Potential Constraints on Housing Production and Conservation A. Market Constraints .................................................................
http://www.beverlyhills.org/cbhfiles/storage/files/13277546181917336178/2014-2021HEAppendixBPotentialConstraintsHCDclean.pdf
EOP 2013 Part One

Operations Plan City of Beverly Hills Part One - 12 Beverly Hills has become the most popular destination for Southern California visitors. The following threat assessments identify and summarize the hazards that could impact the City
http://www.beverlyhills.org/cbhfiles/storage/files/1605913671242561865/EOP2013PartOne.pdf
EOP 2013 Part One

Operations Plan City of Beverly Hills Part One - 12 Beverly Hills has become the most popular destination for Southern California visitors. The following threat assessments identify and summarize the hazards that could impact the City
http://www.beverlyhills.org/cbhfiles/storage/files/16563141581149104608/EOP2013PartOne.pdf
NOTICE TO BIDDERS (Closed on 9-28-11)

BRONZELITE FL7070MH-120-DB, TYPE B 25 2 EA PROVIDE CONNECTION TO LANTERN LIGHTING FIXTURES, TYPE C 26 21 EA PROVIDE AND INSTALL ALL GFCI WEATHERPROOF DUPLEX OUTLETS AND MOUNTING HARDWARE 27 3 EA PROVIDE CONNECTION TO GATEWAY MONUMENT SIGNAGE
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9309--Bid 12-11_Gateway & Streetscape_8-22-11.pdf
CIP Report

given to CIP Project 07-000, Infiltration and Inflow Study, since determining the presence of cross connections and sources of infiltration and inflow were considered a high priority. The Repair and Rehabilitation Program would be implemented
http://www.beverlyhills.org/cbhfiles/storage/files/371357003627394714/CIPReports_SewerMasterPlan6-5-12(reduced).pdf
Planning Commission Meeting Synopsis 01-15-2009

approving Vesting Tentative Tract Map No. 66866 to subdivide five lots into twelve lots and to subdivide the air rights of two proposed lots to permit the individual sales of a maximum of 110 residential condominium units in connection
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/4895--synopsis 1-15-2009.pdf
Beverly Hill's Pilot Bike Route Program Gets Rolling

of the street). The six-foot wide bike lane, consisting of two travel lanes in each direction, will be installed next to the existing parking lane. The bike lane’s eastern end will connect with bike routes in Los Angeles. North Crescent Drive Bike Lane
http://www.beverlyhills.org/cbhfiles/storage/files/1082021128972739032/BikeLanePilotProjectFINAL.pdf
<<   1 ...   12   13   14   15   16   ... 49   >>