62°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker
Search Website
Search
Shannon and Wilson Report on Westside Subway Extension Project

not appear to be active based on the trenching completed at BHHS, but as discussed above, should be confirmed with additional trenching along Santa Monica Boulevard. 2.0 INTRODUCTION The proposed WSE will be a heavy-rail subway connecting
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/10400--51-1-10024-003 R01Final.pdf
Overdrive for iPad, iPhone, and iPod Touch

the book to read or listen. This example is of an EPUB book. This is an example of a download progress for a MP3 file with several parts. Your device must be connected to wifi for all parts
http://www.beverlyhills.org/cbhfiles/storage/files/17432980471993781718/Overdrive_iPad.phone.pod.pdf
Specifications

or equipment installed or furnished that do not meet the City standards will be rejected and shall be removed from the site at no expense to the City. 2.02 PIPE: A. Pressure supply line from point of connection through backflow prevention unit shall
http://www.beverlyhills.org/cbhfiles/storage/files/4092463011319944384/Specifications.pdf
ADDENDUM NO. 1

submittals. The Contractor shall assume all responsibility for the dimensions and the design of adequate connections and details. 2-14 ITEMS OF WORK 2-14.1 ITEMS 1. TRENCH SAFETY MEASURES - Under Item 1 the lump sum bid price shall include the cost
http://www.beverlyhills.org/cbhfiles/storage/files/9780328551516065455/Bid12-43ADENDDUMNo17-19-12.pdf
Bid Documents

JN 5078 The Contractor shall provide the City a copy of the office calculations and documents submitted to the County for filing in connection with the aforementioned work. The payment for surveying, related professional services, office
http://www.beverlyhills.org/cbhfiles/storage/files/881851744827579716/12-35BidDocs.pdf
BID DOCUMENTS

JN 5078 The Contractor shall provide the City a copy of the office calculations and documents submitted to the County for filing in connection with the aforementioned work. The payment for surveying, related professional services, office
http://www.beverlyhills.org/cbhfiles/storage/files/445274345982411127/Bid12-35NoticeToBidders5-8-12.pdf
Specifications

activity be 30 days or more behind schedule, the Owner shall have the right to perform the activity or have the activity performed by whatever method the Owner deems appropriate. 4. Costs incurred by the Owner and by the Architect in connection
http://www.beverlyhills.org/cbhfiles/storage/files/13034077851680021995/Specifications.pdf
Defective Furnaces May Cause Carbon Monoxide Poisoning in Your Home

or report a suspected gas leak or other emergency. Carbon monoxide, known as the “silent killer,” is produced by incomplete combustion of fuels and is odorless, tasteless and colorless. Some signs that may indicate the presence of carbon monoxide
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/8014--CarbonMonixideFurnaceFINAL.pdf
Anti-Bullying

Dangers of the Internet Establishing clear communication with children and teens about the dangers of the Internet is very important. Warn children and teenagers about the presence of sexual predators online. Instruct children to never
http://www.beverlyhills.org/living/antibullying
Neighborhood Watch Meeting

and community support to all who attend." said Sherman. "The best part is, neighbors get to connect and meet each other". Katerina Karagiannides, Vice President of First Bank, will offer tips on being pro-active against Internet Scamming which has become
http://www.beverlyhills.org/citygovernment/departments/policedepartment/neighborhoodwatchprogram/neighborhoodwatchmeeting
<<   1 ...   4   5   6   7   8   ... 42   >>