67°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
Sewer System Master Plan Report (Part 2)

from north to south, and west to east. The backbone sewer lines are shown on Exhibit 2-1. Pipelines that are 15 inches or greater have also been shown on Exhibit 2-2. 2.4.2 Connections to Other Sewer Systems The City‟s collection system
http://www.beverlyhills.org/cbhfiles/storage/files/1780375632231514391/SSMPReportPart2.pdf
RFP Document

in connection with a proposal may be sufficient cause for rejection of a proposal or an Operator. e. Withdrawal of Proposals. Operator may withdraw a proposal at any time prior to proposal opening; no proposal may be withdrawn after proposal opening date.
http://www.beverlyhills.org/cbhfiles/storage/files/5633742681411537443/RFPBeverlyHillsParkingLocations.pdf
Film & Video Production - Policies & Guidelines

production vehicles must be fully contained within the film site at all times; and No amplified sound shall be permitted in connection with the filming at any time; and All filming shall conform to the hours set forth in these Guidelines unless
http://www.beverlyhills.org/business/filmingspecialevents/filmvideoproductionpoliciesguidelines
FAQ for Excavations

for utility work? As a general rule, most conduit and/or pipe installations require a minimum of 24 inches of cover at the flow line within the travel way. Sewer house connections require a minimum of 48 inches of cover measured at the property line.
http://www.beverlyhills.org/cbhfiles/storage/files/328008296349250191/FAQforExcavations12-2012.pdf
Drawings- Plumbing

2 2 2 1 \ E a s t \ W i n s t o n \ R o a d , \ S u i t e \ A A n a h e i m , \ C a l i f o r n i a \ 9 2 8 0 6 P h o n e : \ 7 1 4 \ 7 7 6 - 4 3 4 0 , \ F a x : \ 7 1 4 \ 7 7 6 - 4 3 9 5 w w w . h a i l a n d a r c h . c o m \ \ \ \ \ \ \ \ \ L A \ # 1 7 1 0 H i r s c h \ & \ A s s o c i a t e s , \ I n c . L a n d s c a p e \ A r c h i t e c t u r e \ a n d \ P l a n n i n g ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ?? ???? ????? ? ? ? ? ? ? ? Exp.\ 12\/31\/11 A No.\ M22176 CONSULTING\ ELECT.&\ MECH.\ ENGINEERING ???????? ??????? AND\ FUNNEL\ CONNECTION PRIMARY\ CONDENSATE\ DRAIN AND\ FUNNEL\ CONNECTION SECONDARY\ CONDENSATE\ DRAINCONDENSATE\
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9580--Plumbing.pdf
Memo of Points and Authorities

a rational connection between the facts found and the conclusions made. Native Ecosystems Council v. USFS, 418 F.3d 953, 960 (9th Cir. 2005). NEPA requires that “the agency, in reaching its decision, will have available,
http://www.beverlyhills.org/cbhfiles/storage/files/3631368111425578572/MemoofPointsandAuthorities.pdf
Attachment I : Section 5- Scope of Work

locally in the room to evaluate each proposed position’s view of the room. Each camera shall transmit SDI/HD-SDI signal via coaxial cable to the Control room. Each camera shall be connected for serial control from the new camera controller via UTP
http://www.beverlyhills.org/cbhfiles/storage/files/10479625151551416730/SECTION5-SCOPEOFWORK.pdf
Exponent Report on Metro's Safety and Seismic Findings

across fault lines could cause previously isolated drainage layers to connect and drain ground water. 5.1.2 Beverly Hills High School (BHHS) As currently proposed (Fault Report, Appendix B, Plate 3), the southerly route associated
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/10153--Report - Assessment of Westside Subway Extension_Final.pdf
Addendum 1 to Bid 13-17

Power PoE Powered – No local Power Supply needed Typical power draw: 1.9 Watts Max power draw: 3.4 Watts Operation 8 relays, 1A @ 24VAC / 28VDC Status LEDs 1 Green LED shows connection and power status 1 Green LED shows Ethernet Link status
http://www.beverlyhills.org/cbhfiles/storage/files/193165314938713936/ADDENDUM-1_BidNo.13-17.pdf
Karasik House Historic Assessment Report

spaces are organized around this core. At the main upper floor, a gallery runs along the south side of the courtyard, extending from the front loggia and leading to the living room at the rear of the house. The atrium is visually connected
http://www.beverlyhills.org/cbhfiles/storage/files/14083031731774339635/KarasikHouse.pdf
<<   1 ...   7   8   9   10   11   ... 46   >>