66°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
BHUSD Liaison Committee Meeting Agenda 02-11-16

Venoco Oil Well at BHHS 3) El Rodeo a. School Security b. Final California Geological Survey Report c. 7:00 Start Time for El Rodeo Project 4) Water Connection Fee for Horace Mann 5) Adjournment Byron Posted: February 10, 2016 In accordance
http://www.beverlyhills.org/cbhfiles/storage/files/382555441749129393/DOC001.PDF
2013-12-10 Blue Ribbon Committee Meeting Presentation

Street 7 Drainage Issues Typical Alley Drain Discharge 8 Missing Curb and Gutter Fronting Churches 9 Inadequate Sidewalk Fronting the Cactus Garden 10 Drainage and Pavement Deterioration 11 Bus Stops & Pedestrian Connectivity
http://www.beverlyhills.org/cbhfiles/storage/files/5081467121068223497/12-10-13Presentation.pdf
BH Fiber

as a high-speed connection to the Internet. It uses �ber optic cable to increase the speed of your broadband connection. It is often referred to as “super-fast broadband” or “next generation broadband” and offers faster speeds than have been previously
http://www.beverlyhills.org/cbhfiles/storage/files/7927575231517656806/BeverlyHillsFiber4-17-16.pdf
North Santa Monica Boulevard Bid Addendum No. 2

and connection to existing mainline, purple piping for reclaimed water (future use), and marking tape per the County Health Department requirements. Contractor to relocate existing heads north of the new mow curb and provide proper coverage to existing
http://www.beverlyhills.org/cbhfiles/storage/files/1699615057323645742/NorthSantaMonicaBoulevardBidAddendumNo.2.pdf
9900 Wilshire (One Beverly Hills) Draft SEIR

City of Beverly Hills 9900 Wilshire Boulevard (One Beverly Hills) Project SCH #2006071107 Draft Supplemental Environmental Impact Report Rincon Consultants Inc. Environmental Scientists . Planners . Engineers April 2016 DRAFT
http://www.beverlyhills.org/cbhfiles/storage/files/229283367668955688/9900Wilshire(OneBeverlyHills)DraftSEIR.pdf
Specifications

modified or relocated, and shall maintain and protect all active utilities. 1.05 PROTECTION AND SAFETY: Contractor shall provide signs in necessary places to exclude persons, except those connected with the work, from entering the working area.
http://www.beverlyhills.org/cbhfiles/storage/files/1705489833397244010/Specifications.pdf
Bid 14-06: ALPR

to the cameras and provide video connection points for simplified system wiring. The ALPR Processor must have an operating input range of 10.5-16.5V DC at 90W. The ALPR Processor must utilize, at least, an automotive 30 GB extreme environment Hard Disk
http://www.beverlyhills.org/cbhfiles/storage/files/3705866101425145235/Bid14-06ALPR.pdf
Dog Park Draft MND Appendices

Appendix A Air Quality Modeling Results Project Characteristics - Land Use - Construction Phase - Estimated construction schedule. No paving or coating. Grading - 1540 CY export, 1540 CY import, assumed not phased Vehicle Trips - Ad
http://www.beverlyhills.org/cbhfiles/storage/files/8356697101444471582/DogParkMNDAppen.pdf
Bid 14-30: Job Specifications

to the County for filing in connection with the aformention work. The payment for surveying, related professional services, office calculation, and furnishing all labor, materials, equipment, tools and incidentals, and for doing work involved shall
http://www.beverlyhills.org/cbhfiles/storage/files/4986908181076139219/Bid14-30Job2191Specifications.pdf
RFP Document

court costs, interest and defense costs including expert witness fees, where the same arise out of, or are connected with, in whole or in part, the acts or omissions of Respondent, or any of Respondent’s officers, agents, employees or contractors,
http://www.beverlyhills.org/cbhfiles/storage/files/1827877940451729521/RFP-JailServices2016.pdf
<<   1 ...   8   9   10   11   12   ... 68   >>