59°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker
Search Website
Search
Records, Traffic and the Watch Commander

of the Police Department. Communications equipment, visual and field status monitors, an Internet-connected computer and reference materials are available to assist the watch commander in his duties
http://www.beverlyhills.org/citygovernment/departments/policedepartment/profileofthedepartment/departmentoperations/recordstrafficandthewatchcommander
Civic Center

The colorful tile flourishes echo City Hall's tiled dome. A series of elliptical courtyards connect the city's buildings across Rexford Drive "like beads on a string" as the architect described it. The $110 million renovation project began in 1982
http://www.beverlyhills.org/citygovernment/aboutbeverlyhills/civiccenter
Specifications (1 of 2)

1 SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 - GENERAL 1.01 SUMMARY A. Provisions of the General and Supplementary Conditions and Division 01 apply to this section. B. Section Includes: 1. Cast-in-place concrete placeme
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9568--Specs 1.pdf
Exponent Report on Metro's Safety and Seismic Findings

across fault lines could cause previously isolated drainage layers to connect and drain ground water. 5.1.2 Beverly Hills High School (BHHS) As currently proposed (Fault Report, Appendix B, Plate 3), the southerly route associated
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/10153--Report - Assessment of Westside Subway Extension_Final.pdf
Karasik House Historic Assessment Report

spaces are organized around this core. At the main upper floor, a gallery runs along the south side of the courtyard, extending from the front loggia and leading to the living room at the rear of the house. The atrium is visually connected
http://www.beverlyhills.org/cbhfiles/storage/files/14083031731774339635/KarasikHouse.pdf
Specifications

and by the Architect in connection with expediting construction activity under this Article shall be reimbursed by the Contractor. 5. It is expressly understood and agreed that failure by the Owner to exercise the option either to order the Contractor to expedite
http://www.beverlyhills.org/cbhfiles/storage/files/560284131864503749/BidSet-Specs.pdf
Housing Element Appendix B

Ap Pr A. 1 2 3 B. G 1 2 3 4 5 6 7 C. 1 2 Sev The infl co an ho Co go co en ho ppendix roductio Market Co 1. Construc 2. The Cost 3. The Cost Governmen 1. Land Use 2. Historic Pr 3. Developm 4. Environm 5. Building C 6. Fees ........
http://www.beverlyhills.org/cbhfiles/storage/files/480213370983846779/2014-2021HEAppendixBPotentialConstraints.pdf
2008 Guidelines for Evaluating and Mitigating Seismic Hazards in California

SPECIAL PUBLICATION 117 GUIDELINES FOR EVALUATING AND MITIGATING SEISMIC HAZARDS IN CALIFORNIA 2008 THE RESOURCES AGENCY STATE OF CALIFORNIA DEPARTMENT OF CONSERVATION MIKE CHRISMAN ARNOLD SCHWARZEN
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/4288--SP117-091508.pdf
Solar Photovoltaic Installation Guidelines (2008)

30,000 solar photovoltaic systems installed on homes, commercial buildings and free-standing structures in California and their numbers continue to expand. Most systems are connected to the electric grid and provide power to the site. The majority
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/4425--Solar Photovoltaic Installation Guidelines.pdf
Frontyard Paving

PERMIT REQUIRED FROM PUBLIC WORKS DEPARTMENT) Homes located North of Santa Monica Blvd: PRESCRIPTIVE METHOD b. Allowable paving per “Prescriptive Method” (Sec. 10-3-2422.C) i. 12’ Wide Circular Driveway ii. 9’ Wide Connecting Driveway
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/2473--Front Yard Paving REV 03.08.pdf
<<   1 ...   8   9   10   11   12   ... 42   >>