73°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
Bid Package

on and turned off. The ALPR Processor must control the power supplied to the cameras and provide video connection points for simplified system wiring. The ALPR Processor must have an operating input range of 10.5-16.5V DC at 90W. The ALPR Processor
http://www.beverlyhills.org/cbhfiles/storage/files/405876319306548843/ALPRFixedSiteBid2-1MulticameraSystemPDFcopy.pdf
Greystone rental brochure

but you don’t want to pass up the opportunity to bring your guests inside, the “Pass Thru” might be the option for you. This connects the Courtyards and the Terrace (both areas must be rented) via the grand staircase and elegant Card Room. No set ups
http://www.beverlyhills.org/cbhfiles/storage/files/10976099491073609312/GreystoneVenueBrochureJune2016.pdf
Greystone Venue Brochure

but you don’t want to pass up the opportunity to bring your guests inside, the “Pass Thru” might be the option for you. This connects the Courtyards and the Terrace (both areas must be rented) via the grand staircase and elegant Card Room. No set ups
http://www.beverlyhills.org/cbhfiles/storage/files/272544417961696044/GreystoneVenueBrochureJune2016.pdf
RFP Document

in connection with a proposal may be sufficient cause for rejection of a proposal or an Operator. e. Withdrawal of Proposals. Operator may withdraw a proposal at any time prior to proposal opening; no proposal may be withdrawn after proposal opening date.
http://www.beverlyhills.org/cbhfiles/storage/files/5633742681411537443/RFPBeverlyHillsParkingLocations.pdf
North Santa Monica Boulevard Reconstruction Specs

Opening Catch Basin 302-3 Curb Opening Catch Basin with Grating 308-2 Monolithic Catch Basin Connection 313-3 Local Depressions at Catch Basins 320-2 Manhole – Pipe To Pipe (Main Line ID > 36”) 321-2 Manhole – Pipe To Pipe (Main Line ID < 33”) 323-2
http://www.beverlyhills.org/cbhfiles/storage/files/12901620581914192772/NorthSantaMonicaBoleveardReconstructionSpecs.pdf
Specifications

1 EA Construct temporary air gap assembly for sewer connection 27 00 LF Remove and dispose of existing sewer manhole and plug existing 8” sewer pipe. Copies of the Specifications and Proposal Form may be inspected and obtained at the office
http://www.beverlyhills.org/cbhfiles/storage/files/7354933321360061507/FinalBidSpecifications(signedbyTt)-BeverlyHills-ShallowWellsProjectatMapleYards-6-24-15.pdf
US Conference of Mayors City Livability Award 2016

especially pleased that more communities will learn about the good work we are doing in Beverly Hills to provide for the needs of people who live, work and visit in Beverly Hills, including our homeless population. Our Ambassadors’ consistent presence
http://www.beverlyhills.org/cbhfiles/storage/files/1664985626840830187/0625-release-citylivability.pdf
Attachment I : Section 5- Scope of Work

analog audio console to digital Provide new remote camera control unit for new Room A camera system Provide new audio DSP head end processor Provide new digital video matrix and connections into existing TV broadcast system Replace/upgrade control
http://www.beverlyhills.org/cbhfiles/storage/files/10479625151551416730/SECTION5-SCOPEOFWORK.pdf
Addendum 1 to Bid 13-17

is 2 – drawing is correct. 7. Is there any narrative of the desired functionality for the AMX new system? Answer: No, not specifically; however more information follows. It’s expected that all devices connected to the system will be programmed for full
http://www.beverlyhills.org/cbhfiles/storage/files/193165314938713936/ADDENDUM-1_BidNo.13-17.pdf
2015 Final Draft Urban Water Management Plan

City of Beverly Hills 2015 Urban Water Management Plan Draft 2015 URBAN WATER MANAGEMENT PLAN City of Beverly Hills June 2016 3 Hutton Centre Drive, Suite 200 Santa Ana, CA 9
http://www.beverlyhills.org/cbhfiles/storage/files/111351990244297813/5-31-16CityofBeverlyHills2015FinalDraftUWMPReport.pdf
<<   1 ...   10   11   12   13   14   ... 68   >>