70°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker
Search Website
Search
BID DOCUMENTS

JN 5078 The Contractor shall provide the City a copy of the office calculations and documents submitted to the County for filing in connection with the aforementioned work. The payment for surveying, related professional services, office
http://www.beverlyhills.org/cbhfiles/storage/files/445274345982411127/Bid12-35NoticeToBidders5-8-12.pdf
Main Document

of the bidder. (3) Bidders shall also be ANSI compliant, EIA Compliant, TIA compliant, IEEE compliant, and manufacturer certified, where applicable. e. Truth and Accuracy of Representation. False, incomplete or unresponsive statements in connection
http://www.beverlyhills.org/cbhfiles/storage/files/77597356874161729/B13-01-main.pdf
TAB 2 - Tory Burch

discharges to a storm drain. All ground water discharges must have a permit (NPDES) from the Regional Water Quality Control Board. Connection to a storm drain shall be accomplished in the manner approved by the City Engineer and the Los Angeles County
http://www.beverlyhills.org/cbhfiles/storage/files/503711412342292992/TAB2-ToryBurch.pdf
NOTICE TO BIDDERS (Closed on 7-20-11)

imposes responsibility upon the Contractor for the maintenance, certification, and availability for inspection of such records for all persons employed by the Contractor or by the subcontractors in connection with the project. The Contractor shall
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/8980--Bid 11-40 NOTICE TO BIDDERS 6-15-11.pdf
West Sunset Blvd. Transportation Presentation 6-27-2011

intersection LOS represents worst stop-controlled approach Innovation for better mobility Cut Through Traffic Issues ? Whittier Drive used by Century City and Westwood Traffic - Provides connections to Beverly Glen and Benedict Canyon ? Roxbury via Lomitas
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9465--06-27-11_TPC Special Mtg_Sunset Blvd_Presentation.pdf
West Sunset Blvd. Transportation Presentation 10-4-2011

by Century City and Westwood Traffic - Provides connections to Beverly Glen and Benedict Canyon ? Roxbury via Lomitas to Whittier ? Benedict Canyon to Bedford used by southbound traffic to business triangle ? Roxbury and Camden heavier northbound in PM
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9543--TP Presentation Oct 4 Ver2_10-5-11.pdf
bid docs

for any costs incurred by the bidder in the preparation and submission of a bid. d) Truth and Accuracy of Representation. False, incomplete or unresponsive statements in connection with a bid may be sufficient cause for rejection of a bid
http://www.beverlyhills.org/cbhfiles/storage/files/1834544793286579339/Bid12-30BidDocuments.pdf
Notice to Bidders

and availability for inspection of such records for all persons employed by the Contractor or by the subcontractors in connection with the project. The Contractor shall agree through the Contract to comply with this section and the remaining provisions
http://www.beverlyhills.org/cbhfiles/storage/files/9655287771331565209/12-34NoticeToBidders.pdf
NOTICE TO BIDDERS

and availability for inspection of such records for all persons employed by the Contractor or by the subcontractors in connection with the project. The Contractor shall agree through the Contract to comply with this section and the remaining provisions
http://www.beverlyhills.org/cbhfiles/storage/files/17559386681863178587/Bid12-34NOTICETOBIDDERS.pdf
Construction Means & Method Plan Form

o Lack of required electrical lighting, o Dampness of habitable rooms, o Lack of connection to required sewage disposal system; Structural hazards including, but not limited to, the following: o Deteriorated or inadequate foundations, o
http://www.beverlyhills.org/cbhfiles/storage/files/4996364271574103502/MEANSANDMETHODPLANFORTHETENANT_2_.pdf
Construction Means & Method Plan Form

o Lack of required electrical lighting, o Dampness of habitable rooms, o Lack of connection to required sewage disposal system; Structural hazards including, but not limited to, the following: o Deteriorated or inadequate foundations, o
http://www.beverlyhills.org/cbhfiles/storage/files/6734110951491302909/MEANSANDMETHODPLANFORTHETENANT_2_.pdf
Sun Life LTD Claim Packet

conduct other legally permissible activities that relate to any coverage I have or have applied for with The Company. If this Authorization is signed in connection with a claim for insurance benefits, I hereby authorize The Company to disclose any
http://www.beverlyhills.org/cbhfiles/storage/files/1914012639474089396/Sun Life LTD Claim Packet.pdf
Material Selection Policy

Resources and Access Providing connections to global information, services, and networks is not the same as selecting and purchasing material for a library collection. Determining the accuracy or authenticity of electronic information may present
http://www.beverlyhills.org/cbhfiles/storage/files/14472467131939951205/MaterialSelectionPolicy2002.pdf
Boundary Line Adjustment Application

affected by such readjustment are in full compliance with the provisions of this Article. No permit of any kind shall be issued to any applicant to be used in connection with or pertaining to any premises in a residential zone which has had a lot line
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/2999--Boundary Line Adjustment Application.pdf
Open Air Dining Permit

pedestrian circulation pattern, f) The existing floor plan of the restaurant, including all aisle widths and ingress/egress to the restaurant. g) ANY FIRE DEPARTMENT CONNECTIONS LOCATED ON THE BUILDING OR ADJACENT BUILDING WHICH MAY BE AFFECTED
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/3026--Open Air Dining Permit.pdf
Beverly Hills Green Building Program Handout

Required M** * Credit 1 Site Selection 1 Credit 2 Development Density & Community Connectivity 1 Credit 3 Brownfield Redevelopment 1 Credit 4.1 Alternative Transportation , Public Transportation Access 1 Credit 4.2 Alternative Transportation , Bicycle
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/3596--Public_Information_Public_Handout_Draft1.pdf
Beverly Hills In Focus - January 2009

2011, chain restaurants will be allowed to provide only calorie content, but on easily seen menus or menu boards. (SB 1420) (continued on back page) Buy a television with a digital tuner Connect your analog television to cable, satellite or other
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/4669--InFocus_Jan09_WEB.pdf
RFP Document

and maintain for the duration of the contract, insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work by the Contractor, his agents, representatives, employees
http://www.beverlyhills.org/cbhfiles/storage/files/39439489519070504/RFP13-24Document1-18-13.pdf
Addendum #4- Revised Appendix

all temporary structures, measures, apparatus and services required to prosecute the Work of this bid package. 3.15 All utility service and building system connections or required interruptions shall be coordinated in advance with the City's
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9725--Revised Appendix.pdf
Addendum #5- Bid Appendix

to parking or are fines. 3.14 Contractor shall provide all temporary structures, measures, apparatus and services required to prosecute the Work of this bid package. 3.15 All utility service and building system connections or required interruptions
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9732--D - Roxbury Community Center Bid Appx 11-07-11-REVISED ADDEND NO. 5.pdf
Addendum #6- Revised Appendix

to parking or are fines. 3.14 Contractor shall provide all temporary structures, measures, apparatus and services required to prosecute the Work of this bid package. 3.15 All utility service and building system connections or required interruptions
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9776--Revised Appendix.pdf
Contractor Corner

to installation and inspections. Shall be properly secured and erected. Shall be grounded as required by Code Shall be accessible with required working clearances throughout construction Electrical outlet connections shall be properly wired and secured
http://www.beverlyhills.org/business/constructionlanduse/contractorcorner
Addendum #2- Revised Drawings (1 of 2)

ports allow direct or easily adaptable connections to existing plumbing lines. Model Number Part Number Reduction Claims Nominal Micron Rating Capacity Service Flow Rate Application Replacement Cartridge Sizing ICE120-S 56160-03 Cyst, Sediment,
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9636--Revised Sheets.pdf
Bid Documents

constitute a failure to execute the contract and shall result in the forfeiture of the security of the bidder. f. Truth and Accuracy of Representation. False, incomplete or unresponsive statements in connection with a bid may be sufficient cause
http://www.beverlyhills.org/cbhfiles/storage/files/1977985114384154032/BidDocuments.pdf
Bid Documents

of a contract shall constitute a failure to execute the contract and shall result in the forfeiture of the security of the bidder. f. Truth and Accuracy of Representation. False, incomplete or unresponsive statements in connection with a bid may
http://www.beverlyhills.org/cbhfiles/storage/files/915130932410608835/BidDocs.pdf
<<   1 ...   6   7   8   9   10   11   >>