68°F
Fair
Font Size
Questions (Ask Bev)
Video on Demand
Jobs
iMap (GIS)
eNotice
Water Tracker
Filter Search Results
Website
Images
Documents
Municipal Codes
Events
FAQ
Contacts
Advanced Search
City of Beverly Hills
Search
Website
Loading...
Search
Main Document
of the bidder. (3) Bidders shall also be ANSI compliant, EIA Compliant, TIA compliant, IEEE compliant, and manufacturer certified, where applicable. e. Truth and Accuracy of Representation. False, incomplete or unresponsive statements in
connection
http://www.beverlyhills.org/cbhfiles/storage/files/77597356874161729/B13-01-main.pdf
TAB 2 - Tory Burch
discharges to a storm drain. All ground water discharges must have a permit (NPDES) from the Regional Water Quality Control Board.
Connection
to a storm drain shall be accomplished in the manner approved by the City Engineer and the Los Angeles County
http://www.beverlyhills.org/cbhfiles/storage/files/503711412342292992/TAB2-ToryBurch.pdf
August 2012
10:15AM Permit Status: ISSUEDTo8/1/2012 8/31/2012 Page 7 PERMIT TYPE ISSUED Valuation Project Address FEES PAID Due BS1212891 Building 8/16/2012 $70,000.00 MAIN HOUSE 621 ROXBURY DR, N $2,301.89 $2,301.89 $0.00 BS1212902 Building 10/3/2012 $
75
http://www.beverlyhills.org/cbhfiles/storage/files/896278683304862744/imrap.pdf
October 2012
BS1228188 Building 10/18/2012 $20,000.00 CHIMNEY REPAIR & STUCCO 494 SPALDING DR $1,101.11 $1,101.11 $0.00 BS1228210 Building 10/24/2012 $
75
,000.00 UNIT #1-BANK OF THE WEST 9401 WILSHIRE BLVD $5,033.71 $5,033.71 $0.00 BS1228227 Building 10/18/2012 $20,000.00
http://www.beverlyhills.org/cbhfiles/storage/files/5354094991102105589/imrap.pdf
December 2012
$0.00 BS1231128 Building 12/10/2012 $100,000.00 UNIT 112N - INTERIOR REMODEL 211 SPALDING DR 112N $5,948.29 $5,948.29 $0.00 BS1231133 Building 12/5/2012 $5,000.00 RE-BUILT DAMAGE STAIRCASE LEADING TO UPSTAIRS UNIT.420 ROXBURY DR, S $955.
75
$955.
75
$0.00
http://www.beverlyhills.org/cbhfiles/storage/files/11061443551081341427/imrap.pdf
Addendum 2 Beverly Canon - Public Gardens
The Beverly Hills Gardens 3/22/2013 $2,073.00 The Beverly Hills Gardens 3/23/2013 $2,118.00 The Beverly Hills Gardens 3/24/2013 $1,264.00 The Beverly Hills Gardens 3/25/2013 $1,104.
75
The Beverly Hills Gardens 3/26/2013 $1,890.00
http://www.beverlyhills.org/cbhfiles/storage/files/1561068855176858077/Addendum2BeverlyCanon-PublicGardens.pdf
Open Air Dining Permit
pedestrian circulation pattern, f) The existing floor plan of the restaurant, including all aisle widths and ingress/egress to the restaurant. g) ANY FIRE DEPARTMENT
CONNECTIONS
LOCATED ON THE BUILDING OR ADJACENT BUILDING WHICH MAY BE AFFECTED
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/3026--Open Air Dining Permit.pdf
NOTICE TO BIDDERS (Closed on 7-20-11)
imposes responsibility upon the Contractor for the maintenance, certification, and availability for inspection of such records for all persons employed by the Contractor or by the subcontractors in
connection
with the project. The Contractor shall
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/8980--Bid 11-40 NOTICE TO BIDDERS 6-15-11.pdf
West Sunset Blvd. Transportation Presentation 6-27-2011
intersection LOS represents worst stop-controlled approach Innovation for better mobility Cut Through Traffic Issues ? Whittier Drive used by Century City and Westwood Traffic - Provides
connections
to Beverly Glen and Benedict Canyon ? Roxbury via Lomitas
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9465--06-27-11_TPC Special Mtg_Sunset Blvd_Presentation.pdf
West Sunset Blvd. Transportation Presentation 10-4-2011
by Century City and Westwood Traffic - Provides
connections
to Beverly Glen and Benedict Canyon ? Roxbury via Lomitas to Whittier ? Benedict Canyon to Bedford used by southbound traffic to business triangle ? Roxbury and Camden heavier northbound in PM
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9543--TP Presentation Oct 4 Ver2_10-5-11.pdf
Notice to Bidders
and availability for inspection of such records for all persons employed by the Contractor or by the subcontractors in
connection
with the project. The Contractor shall agree through the Contract to comply with this section and the remaining provisions
http://www.beverlyhills.org/cbhfiles/storage/files/9655287771331565209/12-34NoticeToBidders.pdf
NOTICE TO BIDDERS
and availability for inspection of such records for all persons employed by the Contractor or by the subcontractors in
connection
with the project. The Contractor shall agree through the Contract to comply with this section and the remaining provisions
http://www.beverlyhills.org/cbhfiles/storage/files/17559386681863178587/Bid12-34NOTICETOBIDDERS.pdf
Construction Means & Method Plan Form
o Lack of required electrical lighting, o Dampness of habitable rooms, o Lack of
connection
to required sewage disposal system; Structural hazards including, but not limited to, the following: o Deteriorated or inadequate foundations, o
http://www.beverlyhills.org/cbhfiles/storage/files/4996364271574103502/MEANSANDMETHODPLANFORTHETENANT_2_.pdf
Construction Means & Method Plan Form
o Lack of required electrical lighting, o Dampness of habitable rooms, o Lack of
connection
to required sewage disposal system; Structural hazards including, but not limited to, the following: o Deteriorated or inadequate foundations, o
http://www.beverlyhills.org/cbhfiles/storage/files/6734110951491302909/MEANSANDMETHODPLANFORTHETENANT_2_.pdf
RFP Document
and maintain for the duration of the contract, insurance against claims for injuries to persons or damages to property which may arise from or in
connection
with the performance of the work by the Contractor, his agents, representatives, employees
http://www.beverlyhills.org/cbhfiles/storage/files/39439489519070504/RFP13-24Document1-18-13.pdf
Management Audit Presentation
where in the City the call is being placed and a response can be provided in a timely fashion. The intent is to create service beats that maintain response times within the target standards and provide the greatest law enforcement
presence
http://www.beverlyhills.org/cbhfiles/storage/files/1292105352924291543/Management Audit.pdf
FY2013/14 Proposed - Supplememtal & Glossary
to a legal limitation based on 3.
75
% of total assessed value of real and personal property. The City has no general obligation SUPPLEMENTAL INFORMATION SUP - 20 debt applicable to the debt limit. In addition to the restriction of the legal debt limitations,
http://www.beverlyhills.org/cbhfiles/storage/files/18199388511006361160/SupplementalGlossary.pdf
CAFR 2012
for the Capital nd funded - ations. Total 012/2013 are 2010/2011 nd repairs to will continue .7 million for ity can still infrastructure contribution Asset Funds tal initiatives ls for signal commencing ated
library
on and Park, mains and f
http://www.beverlyhills.org/cbhfiles/storage/files/5317188311671738019/CAFR2012-Final.pdf
Contractor Corner
to installation and inspections. Shall be properly secured and erected. Shall be grounded as required by Code Shall be accessible with required working clearances throughout construction Electrical outlet
connections
shall be properly wired and secured
http://www.beverlyhills.org/business/constructionlanduse/contractorcorner
Addendum #5- Bid Appendix
to parking or are fines. 3.14 Contractor shall provide all temporary structures, measures, apparatus and services required to prosecute the Work of this bid package. 3.15 All utility service and building system
connections
or required interruptions
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9732--D - Roxbury Community Center Bid Appx 11-07-11-REVISED ADDEND NO. 5.pdf
Addendum #6- Revised Appendix
to parking or are fines. 3.14 Contractor shall provide all temporary structures, measures, apparatus and services required to prosecute the Work of this bid package. 3.15 All utility service and building system
connections
or required interruptions
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9776--Revised Appendix.pdf
Addendum #2- Revised Drawings (1 of 2)
ports allow direct or easily adaptable
connections
to existing plumbing lines. Model Number Part Number Reduction Claims Nominal Micron Rating Capacity Service Flow Rate Application Replacement Cartridge Sizing ICE120-S 56160-03 Cyst, Sediment,
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9636--Revised Sheets.pdf
Bid Documents
constitute a failure to execute the contract and shall result in the forfeiture of the security of the bidder. f. Truth and Accuracy of Representation. False, incomplete or unresponsive statements in
connection
with a bid may be sufficient cause
http://www.beverlyhills.org/cbhfiles/storage/files/1977985114384154032/BidDocuments.pdf
Bid Package
in
connection
with a bid may be sufficient cause for rejection of a bid or a bidder. g. Withdrawal of Proposals. A bidder may withdraw a proposal at any time prior to bid opening; no bid may be withdrawn after bid opening. h. City Changes to the Bid
http://www.beverlyhills.org/cbhfiles/storage/files/5106740561550899597/BidPackage.pdf
Bid Package
result in the forfeiture of the security of the bidder. f. Truth and Accuracy of Representation. False, incomplete or unresponsive statements in
connection
with a bid may be sufficient cause for rejection of a bid or a bidder. g. Withdrawal
http://www.beverlyhills.org/cbhfiles/storage/files/14933631411896377701/BidPackage.pdf
<<
1 ...
25
26
27
28
29
... 32
>>
FACEBOOK
TWITTER
GOOGLE+
LINKEDIN
Subscribe to this page to be notified via email
when updates to this page are made.
© Copyright 2012
City of Beverly Hills. All Rights Reserved.
CONTACTS
TEXT VERSION
PRINT
SHARE
SUBSCRIBE
TERMS