Font Size

Questions (Ask Bev)

Video on Demand


iMap (GIS)


Water Tracker

Org Chart

Advocate Registration
Search Website
FAQ for Excavations

for utility work? As a general rule, most conduit and/or pipe installations require a minimum of 24 inches of cover at the flow line within the travel way. Sewer house connections require a minimum of 48 inches of cover measured at the property line.
RFP Document

in connection with a proposal may be sufficient cause for rejection of a proposal or an Operator. e. Withdrawal of Proposals. Operator may withdraw a proposal at any time prior to proposal opening; no proposal may be withdrawn after proposal opening date.

1 EA Construct temporary air gap assembly for sewer connection 27 00 LF Remove and dispose of existing sewer manhole and plug existing 8” sewer pipe. Copies of the Specifications and Proposal Form may be inspected and obtained at the office
Attachment I : Section 5- Scope of Work

analog audio console to digital Provide new remote camera control unit for new Room A camera system Provide new audio DSP head end processor Provide new digital video matrix and connections into existing TV broadcast system Replace/upgrade control
Addendum 1 to Bid 13-17

is 2 – drawing is correct. 7. Is there any narrative of the desired functionality for the AMX new system? Answer: No, not specifically; however more information follows. It’s expected that all devices connected to the system will be programmed for full
Exponent Report on Metro's Safety and Seismic Findings

across fault lines could cause previously isolated drainage layers to connect and drain ground water. 5.1.2 Beverly Hills High School (BHHS) As currently proposed (Fault Report, Appendix B, Plate 3), the southerly route associated
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/10153--Report - Assessment of Westside Subway Extension_Final.pdf
Memo of Points and Authorities

a rational connection between the facts found and the conclusions made. Native Ecosystems Council v. USFS, 418 F.3d 953, 960 (9th Cir. 2005). NEPA requires that “the agency, in reaching its decision, will have available,
Specifications (1 of 2)

1 SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 - GENERAL 1.01 SUMMARY A. Provisions of the General and Supplementary Conditions and Division 01 apply to this section. B. Section Includes: 1. Cast-in-place concrete placeme
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9568--Specs 1.pdf
Karasik House Historic Assessment Report

spaces are organized around this core. At the main upper floor, a gallery runs along the south side of the courtyard, extending from the front loggia and leading to the living room at the rear of the house. The atrium is visually connected
Attend a Panel Discussion on Economic Sustainability in Beverly Hills

brand. The panelists will discuss the realities facing the community's fiscal and economic situation in the context of the City's land use policies. They will share with the community the connection between a healthy local economy and a vibrant,
<<   1 ...   8   9   10   11   12   ... 57   >>