65°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
Karasik House Historic Assessment Report

spaces are organized around this core. At the main upper floor, a gallery runs along the south side of the courtyard, extending from the front loggia and leading to the living room at the rear of the house. The atrium is visually connected
http://www.beverlyhills.org/cbhfiles/storage/files/14083031731774339635/KarasikHouse.pdf
IFB C1056 Amendment No 3 Cover Letter - 4-3-14

Revised UC-106 WILSHIRE / LA CIENEGA STATION - TEMPORARY SEWER RELOCATION - LINE "D" PLAN AND PROFILE - STA 10+00.00 TO STA 11.46.09 Revised UC-107 WILSHIRE / LA CIENEGA STATION - TEMPORARY SEWER RELOCATION - HOUSE CONNECTION DETAIL, TABLE,
http://www.beverlyhills.org/cbhfiles/storage/files/18121138281806029426/IFBNo.C1056AmendmentNo3CoverLetter(OPENFIRST).pdf
Memo of Points and Authorities

a rational connection between the facts found and the conclusions made. Native Ecosystems Council v. USFS, 418 F.3d 953, 960 (9th Cir. 2005). NEPA requires that “the agency, in reaching its decision, will have available,
http://www.beverlyhills.org/cbhfiles/storage/files/3631368111425578572/MemoofPointsandAuthorities.pdf
Specifications

and by the Architect in connection with expediting construction activity under this Article shall be reimbursed by the Contractor. 5. It is expressly understood and agreed that failure by the Owner to exercise the option either to order the Contractor to expedite
http://www.beverlyhills.org/cbhfiles/storage/files/560284131864503749/BidSet-Specs.pdf
Housing Element Appendix B

Ap Pr A. 1 2 3 B. G 1 2 3 4 5 6 7 C. 1 2 Sev The infl co an ho Co go co en ho ppendix roductio Market Co 1. Construc 2. The Cost 3. The Cost Governmen 1. Land Use 2. Historic Pr 3. Developm 4. Environm 5. Building C 6. Fees ........
http://www.beverlyhills.org/cbhfiles/storage/files/480213370983846779/2014-2021HEAppendixBPotentialConstraints.pdf
2008 Guidelines for Evaluating and Mitigating Seismic Hazards in California

SPECIAL PUBLICATION 117 GUIDELINES FOR EVALUATING AND MITIGATING SEISMIC HAZARDS IN CALIFORNIA 2008 THE RESOURCES AGENCY STATE OF CALIFORNIA DEPARTMENT OF CONSERVATION MIKE CHRISMAN ARNOLD SCHWARZEN
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/4288--SP117-091508.pdf
Mechanical Equipment Change-out Policy

connections or if a sound test of the existing equipment is desired, a pre-inspection will be required (a pre-inspection fee of $172.20 will be required). As the noise ordinance (see below) is a public welfare code as opposed to a construction code
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/6208--Mechanical Equipment Screening-final Nov2009.pdf
Frontyard Paving

PERMIT REQUIRED FROM PUBLIC WORKS DEPARTMENT) Homes located North of Santa Monica Blvd: PRESCRIPTIVE METHOD b. Allowable paving per “Prescriptive Method” (Sec. 10-3-2422.C) i. 12’ Wide Circular Driveway ii. 9’ Wide Connecting Driveway
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/2473--Front Yard Paving REV 03.08.pdf
Solar Photovoltaic Installation Guidelines (2008)

30,000 solar photovoltaic systems installed on homes, commercial buildings and free-standing structures in California and their numbers continue to expand. Most systems are connected to the electric grid and provide power to the site. The majority
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/4425--Solar Photovoltaic Installation Guidelines.pdf
Standard Detail Drawings

Connect To Lined Sewer Main Section III Flood Control and Storm Drain Facilities BH 301 Not Used Section IV Street Lighting and Traffic Signals BH 401 Round Inductive Loop Detector Installation BH 402 Bike Loop Detector
http://www.beverlyhills.org/cbhfiles/storage/files/9142773001195340697/StandardDrawings06-2013.pdf
<<   1 ...   9   10   11   12   13   ... 48   >>