57°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker
Search Website
Search
Bid 14-06: ALPR

to the cameras and provide video connection points for simplified system wiring. The ALPR Processor must have an operating input range of 10.5-16.5V DC at 90W. The ALPR Processor must utilize, at least, an automotive 30 GB extreme environment Hard Disk
http://www.beverlyhills.org/cbhfiles/storage/files/3705866101425145235/Bid14-06ALPR.pdf
Bid 14-30: Job Specifications

to the County for filing in connection with the aformention work. The payment for surveying, related professional services, office calculation, and furnishing all labor, materials, equipment, tools and incidentals, and for doing work involved shall
http://www.beverlyhills.org/cbhfiles/storage/files/4986908181076139219/Bid14-30Job2191Specifications.pdf
FAQ for Excavations

for utility work? As a general rule, most conduit and/or pipe installations require a minimum of 24 inches of cover at the flow line within the travel way. Sewer house connections require a minimum of 48 inches of cover measured at the property line.
http://www.beverlyhills.org/cbhfiles/storage/files/328008296349250191/FAQforExcavations12-2012.pdf
Drawings- Plumbing

2 2 2 1 \ E a s t \ W i n s t o n \ R o a d , \ S u i t e \ A A n a h e i m , \ C a l i f o r n i a \ 9 2 8 0 6 P h o n e : \ 7 1 4 \ 7 7 6 - 4 3 4 0 , \ F a x : \ 7 1 4 \ 7 7 6 - 4 3 9 5 w w w . h a i l a n d a r c h . c o m \ \ \ \ \ \ \ \ \ L A \ # 1 7 1 0 H i r s c h \ & \ A s s o c i a t e s , \ I n c . L a n d s c a p e \ A r c h i t e c t u r e \ a n d \ P l a n n i n g ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ?? ???? ????? ? ? ? ? ? ? ? Exp.\ 12\/31\/11 A No.\ M22176 CONSULTING\ ELECT.&\ MECH.\ ENGINEERING ???????? ??????? AND\ FUNNEL\ CONNECTION PRIMARY\ CONDENSATE\ DRAIN AND\ FUNNEL\ CONNECTION SECONDARY\ CONDENSATE\ DRAINCONDENSATE\
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9580--Plumbing.pdf
Sewer System Master Plan Report (Part 2)

from north to south, and west to east. The backbone sewer lines are shown on Exhibit 2-1. Pipelines that are 15 inches or greater have also been shown on Exhibit 2-2. 2.4.2 Connections to Other Sewer Systems The City‟s collection system
http://www.beverlyhills.org/cbhfiles/storage/files/1780375632231514391/SSMPReportPart2.pdf
Attachment I : Section 5- Scope of Work

analog audio console to digital Provide new remote camera control unit for new Room A camera system Provide new audio DSP head end processor Provide new digital video matrix and connections into existing TV broadcast system Replace/upgrade control
http://www.beverlyhills.org/cbhfiles/storage/files/10479625151551416730/SECTION5-SCOPEOFWORK.pdf
Addendum 1 to Bid 13-17

is 2 – drawing is correct. 7. Is there any narrative of the desired functionality for the AMX new system? Answer: No, not specifically; however more information follows. It’s expected that all devices connected to the system will be programmed for full
http://www.beverlyhills.org/cbhfiles/storage/files/193165314938713936/ADDENDUM-1_BidNo.13-17.pdf
RFP Document

in connection with a proposal may be sufficient cause for rejection of a proposal or an Operator. e. Withdrawal of Proposals. Operator may withdraw a proposal at any time prior to proposal opening; no proposal may be withdrawn after proposal opening date.
http://www.beverlyhills.org/cbhfiles/storage/files/5633742681411537443/RFPBeverlyHillsParkingLocations.pdf
Bid Package

on and turned off. The ALPR Processor must control the power supplied to the cameras and provide video connection points for simplified system wiring. The ALPR Processor must have an operating input range of 10.5-16.5V DC at 90W. The ALPR Processor
http://www.beverlyhills.org/cbhfiles/storage/files/405876319306548843/ALPRFixedSiteBid2-1MulticameraSystemPDFcopy.pdf
Vice Mayor Frank Fenton Expected to Become Beverly Hills Mayor

Hills City Council is sworn into office. Vice Mayor Fenton will receive the oath of office by his son, Beverly Hills Unified School District Board Member Steven Fenton, in the presence of the City Council, his family, and the community during
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/4903--Fenton Mayor FINAL.pdf
<<   1 ...   5   6   7   8   9   ... 42   >>