Sewer System Master Plan Report (Part 2)

from north to south, and west to east. The backbone sewer lines are shown on Exhibit 2-1. Pipelines that are 15 inches or greater have also been shown on Exhibit 2-2. 2.4.2 Connections to Other Sewer Systems The City‟s collection system
http://www.beverlyhills.org/cbhfiles/storage/files/1780375632231514391/SSMPReportPart2.pdf
Film & Video Production - Policies & Guidelines

production vehicles must be fully contained within the film site at all times; and No amplified sound shall be permitted in connection with the filming at any time; and All filming shall conform to the hours set forth in these Guidelines unless
http://www.beverlyhills.org/business/filmingspecialevents/filmvideoproductionpoliciesguidelines
FAQ for Excavations

for utility work? As a general rule, most conduit and/or pipe installations require a minimum of 24 inches of cover at the flow line within the travel way. Sewer house connections require a minimum of 48 inches of cover measured at the property line.
http://www.beverlyhills.org/cbhfiles/storage/files/328008296349250191/FAQforExcavations12-2012.pdf
Drawings- Plumbing

2 2 2 1 \ E a s t \ W i n s t o n \ R o a d , \ S u i t e \ A A n a h e i m , \ C a l i f o r n i a \ 9 2 8 0 6 P h o n e : \ 7 1 4 \ 7 7 6 - 4 3 4 0 , \ F a x : \ 7 1 4 \ 7 7 6 - 4 3 9 5 w w w . h a i l a n d a r c h . c o m \ \ \ \ \ \ \ \ \ L A \ # 1 7 1 0 H i r s c h \ & \ A s s o c i a t e s , \ I n c . L a n d s c a p e \ A r c h i t e c t u r e \ a n d \ P l a n n i n g ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ?? ???? ????? ? ? ? ? ? ? ? Exp.\ 12\/31\/11 A No.\ M22176 CONSULTING\ ELECT.&\ MECH.\ ENGINEERING ???????? ??????? AND\ FUNNEL\ CONNECTION PRIMARY\ CONDENSATE\ DRAIN AND\ FUNNEL\ CONNECTION SECONDARY\ CONDENSATE\ DRAINCONDENSATE\
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9580--Plumbing.pdf
Bid Package

on and turned off. The ALPR Processor must control the power supplied to the cameras and provide video connection points for simplified system wiring. The ALPR Processor must have an operating input range of 10.5-16.5V DC at 90W. The ALPR Processor
http://www.beverlyhills.org/cbhfiles/storage/files/405876319306548843/ALPRFixedSiteBid2-1MulticameraSystemPDFcopy.pdf
RFP Document

in connection with a proposal may be sufficient cause for rejection of a proposal or an Operator. e. Withdrawal of Proposals. Operator may withdraw a proposal at any time prior to proposal opening; no proposal may be withdrawn after proposal opening date.
http://www.beverlyhills.org/cbhfiles/storage/files/5633742681411537443/RFPBeverlyHillsParkingLocations.pdf
Specifications

1 EA Construct temporary air gap assembly for sewer connection 27 00 LF Remove and dispose of existing sewer manhole and plug existing 8” sewer pipe. Copies of the Specifications and Proposal Form may be inspected and obtained at the office
http://www.beverlyhills.org/cbhfiles/storage/files/7354933321360061507/FinalBidSpecifications(signedbyTt)-BeverlyHills-ShallowWellsProjectatMapleYards-6-24-15.pdf
Attachment I : Section 5- Scope of Work

analog audio console to digital Provide new remote camera control unit for new Room A camera system Provide new audio DSP head end processor Provide new digital video matrix and connections into existing TV broadcast system Replace/upgrade control
http://www.beverlyhills.org/cbhfiles/storage/files/10479625151551416730/SECTION5-SCOPEOFWORK.pdf
Addendum 1 to Bid 13-17

is 2 – drawing is correct. 7. Is there any narrative of the desired functionality for the AMX new system? Answer: No, not specifically; however more information follows. It’s expected that all devices connected to the system will be programmed for full
http://www.beverlyhills.org/cbhfiles/storage/files/193165314938713936/ADDENDUM-1_BidNo.13-17.pdf
Exponent Report on Metro's Safety and Seismic Findings

across fault lines could cause previously isolated drainage layers to connect and drain ground water. 5.1.2 Beverly Hills High School (BHHS) As currently proposed (Fault Report, Appendix B, Plate 3), the southerly route associated