70°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
November 21, 2013 Regular Meeting

piece has been installed at The Wallis in the side courtyard. It’s totally visible to the public and livens up the courtyard considerably. H. The temporary solution to protecting Kusama’s Hymn of Life has been approved and materials are en route
http://www.beverlyhills.org/cbhfiles/storage/files/1823793467736992712/Minutes11-21-13RegularMeetingfinal.pdf
Specifications

day to day as the project is being installed. All lettering on drawings shall be minimum 1/8 inch in size. 4. Show locations and depths of the following items: a. Routing of sprinkler pressure lines (dimension maximum 100 feet along routing) b.
http://www.beverlyhills.org/cbhfiles/storage/files/285334430205435005/BidTechnicalSpecs.pdf
RFP for Engineering Consulting Services Updating the PMP

3.51 7.59 Concrete 403,945 2.61 5.22 Totals 24,912,362 152.20 336.99 By Surface Type Current Surface Type Square Feet Unit Cost for Replacement Total
http://www.beverlyhills.org/cbhfiles/storage/files/989479581215496884/RFPPAVEMENTMANAGEMENTPROGRAMUPDATE10-12-2012.pdf
RFP Document

3.51 7.59 Concrete 403,945 2.61 5.22 Totals 24,912,362 152.20 336.99 By Surface Type Current Surface Type Square Feet Unit Cost for Replacement Total
http://www.beverlyhills.org/cbhfiles/storage/files/14599525001694125219/PAVEMENTMANAGEMENTPROGRAMUPDATERFP2012.pdf
2008 Guidelines for Evaluating and Mitigating Seismic Hazards in California

SPECIAL PUBLICATION 117 GUIDELINES FOR EVALUATING AND MITIGATING SEISMIC HAZARDS IN CALIFORNIA 2008 THE RESOURCES AGENCY STATE OF CALIFORNIA DEPARTMENT OF CONSERVATION MIKE CHRISMAN ARNOLD SCHWARZEN
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/4288--SP117-091508.pdf
FY 2014-15 CIP Budget

18/19 5-Year Total **** PROJECT MANAGEMENT 154,634 290,983 403,702 284,953 480,615 383,244 1,843,497 0349 TENANT IMPROVEMENT PROGRAM 84,128 559,000 452,000 49,000 877,000 125,000 2,062,000 0713 REPAINT CITY BUILDINGS 0 850,000 850,000 250,000
http://www.beverlyhills.org/cbhfiles/storage/files/1205818766910666490/FY2014-15AdoptedCIPBudget(revised02-03-15)withcover.pdf
2006-07 2nd Quarter Status Report

System 2 400 12/31/2007 60%4Re-Engineer Hiring Process 2 4800402 Payroll/Benefits AdminProgram: 401 On-Going 75%4Cross Train Staff 2 402 On Hold 75%4Cafeteria Benefits Program 2 403 4/30/2007 60%4On-Line Timecards 2 404 3/31/2007 50%4Implement
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/2631--FY06-07_2nd_Quarter_Budget_Status.pdf
2006-07 3rd Quarter Status Report

2 4800402 Payroll/Benefits AdminProgram: 401 On-Going 75%4Cross Train Staff 2 402 On-Going 75%4Cafeteria Benefits Program 2 403 On-Going 60%4On-Line Timecards 2 404 On-Going 50%4Implement On-Line Benefits Program 2 4800403 Labor
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/2632--FY06-07_3rd_Quarter_Budget_Status.pdf
4-17-13 AC Minutes

2. A full sign program that includes all tenant and navigational signage shall be brought to the Architectural Commission at a future meeting prior to the issuance of any sign permit for the property. STANDARD CONDITIONS: 3. Revised Plan Submittal.
http://www.beverlyhills.org/cbhfiles/storage/files/179572673803424253/4-17-13MinutesSIGNED.pdf
Bid Package

rear manual Safety OnStar: Directions & Connections Plan with Turn-by- Turn Navigation for the first six months Brakes, 4-wheel antilock, 4-wheel disc Daytime Running Lamps Air bags, frontal and side-impact for driver and front passenger
http://www.beverlyhills.org/cbhfiles/storage/files/6197933521157825952/BidPackage.pdf
<<   1 ...   19   20   21   22   23   ... 36   >>