Bid Documents

Title: TRUCK, RESCUE, FREIGHTLINER M2 BID NO: 12-31 1 of 42 BID DOCUMENT CITY OF BEVERLY HILLS OFFICE OF THE CITY CLERK 455 NORTH REXFORD DRIVE BEVERLY HILLS, CALIFORNIA 90210 (310) 285-2440 LEGAL NOTICE- BIDS WANTED Seal
http://www.beverlyhills.org/cbhfiles/storage/files/4229949761563551655/biddoc12-31.pdf
Salary and Benefit Information for 2011

Bargain Unit Title Salary PERS Overtime Pay for Performance Total Persable Pays Cafeteria Plan Overtime Leave Cashout Car Allowance Merit/Bonus ARMP Payoff Other Pays Total Non PERS Pays Total Salary Retirement Deferred
http://www.beverlyhills.org/cbhfiles/storage/files/1925878410192837940/EmployeeCompensation-CY2011.pdf
Water System Master Plan 2002

V - , ! ~~ BLACK & VEATCH 8400 Ward Pal http://www.beverlyhills.org/cbhfiles/storage/files/348999561481287345/WaterSystemMasterPlan2002.pdf
Water System Master Plan 2002

V - , ! ~~ BLACK & VEATCH 8400 Ward Pal http://www.beverlyhills.org/cbhfiles/storage/files/1637289557975104346/WaterSystemMasterPlan2002.pdf
Management Audit Presentation

intersections  to  allow  the  BHFD  to  provide  a  safe  response  route  and  to  decrease response times to emergencies.                                                                    18   Communication with Fire Marshall Tim Scranton, City of Beverly
http://www.beverlyhills.org/cbhfiles/storage/files/1292105352924291543/Management Audit.pdf
C1056 Appendix D (Amd 3) - Tech Specs for Water

W E S T S I D E S U B W A Y E X T E N S I O N P R O J E C T APPENDIX D TECHNICAL SPECIFICATIONS FOR WATER Specifications D101 Developer - Installed Water Distribution Facilities As used in these spec
http://www.beverlyhills.org/cbhfiles/storage/files/121645808389704096/C1056-LaCienega-AppendixD(Amd3)-TechSpecsforWater.pdf
IFB C1056 - WSE Project - Advanced Utility Relocations (La Cienega Station) FINAL

Hills sanitary sewer lines, storm drain lines, water lines and the construction of the power duct route for Southern California Edison that are in conflict with the (future) construction of the Westside Subway Extension Project (by Others). The work
http://www.beverlyhills.org/cbhfiles/storage/files/521989446401957627/IFBC1056-WSEProject-AdvancedUtilityRelocations(LaCienegaStation)FINAL.pdf
CIP Report

A preliminary evaluation was conducted to determine potential alternatives that should be investigated to further reduce the amount of pipelines that needed upsizing. This could include a sewer diversion that would route flow away from the undersized
http://www.beverlyhills.org/cbhfiles/storage/files/371357003627394714/CIPReports_SewerMasterPlan6-5-12(reduced).pdf
2007-08 4th Quarter Status Report - Volume II

CAPITAL IMPROVEMENT PROJECTS CIP Number 0888331 FOOTHILL ROAD OFFICE BLDG 0897455 NORTH CRESCENT PARKING STUDY AND GARAGE 08929268 THIRD STREET 08989400 SANTA MONICA BLVD STUDY AND DEVELOPMENT 0877BHUSD CAPITAL PROJECTS 0333BUILDING WIRING
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/3961--07-08 4th Q CIP Report 8.12.08.pdf
Specifications

shall be recorded day to day as the project is being installed. All lettering on drawings shall be minimum 1/8 inch in size. 4. Show locations and depths of the following items: a. Point of connection. b. Routing of sprinkler pressure lines