61°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
Gateway FEIR Volume 1

City of Beverly Hills The Beverly Hills Gateway Project Final Environmental Impact Report Volume I: Report SCH # 2008011066 March 2011 The Beverly Hills Gateway Project Final
http://www.beverlyhills.org/cbhfiles/storage/files/373491083285715651/GatewayFEIRVol1.pdf
C1056 AUR La Cienega - Specs (Amd 5)

of Beverly Hills (COBH) to newly constructed system and hand over to COBH. 4. Duct Route, including associated manholes and vaults for Southern California Edison (SCE). Installation of cabling and splicing in the duct route will be performed by SCE.
http://www.beverlyhills.org/cbhfiles/storage/files/130603030161917600/C1056AURLaCienega-Specs(Amd5).pdf
Fire Hydrant Flushing Program: 10/18/2013 - 10/20/2013

RANGELY AV MELROSE AV ALM ON T D R SANT A MO NICA BLV D LA PEE R D R NEMO ST WIL LEY LNHARLAND AV RANGE ST KEITH AV KEIT H AVL LOYD ELEVADO AV 818 616 648 756 646 711 617 626 460 633 627 657 641 718 748 603 663
http://www.beverlyhills.org/cbhfiles/storage/files/14465407261586301863/WORKAREA6-2013HYDRANTFLUSHINGPROGRAMWEB10-10-2013.pdf
Appendix A- Beverly Hills Municipal Code

or “taxicab” displayed on the exterior of the vehicle, and is used for the transportation of passengers for hire within and without the boundaries of the city, for which a fee is charged and that does not operate over a defined route. TAXIMETER:
http://www.beverlyhills.org/cbhfiles/storage/files/16522104571279552103/BHMC52814Draft.pdf
Proposed Annual Budget for Fiscal Year 2012/13

Scot W City tt G. Miller, N Don H William Cas Lucy G Carolyn y of B Propos Ph.D., Direc Noel Marqui Harrison, Bu strillon, Seni Gonzalez, Bu n Johnson, B City o 455 Nor Beverly Hil Beverl sed
http://www.beverlyhills.org/cbhfiles/storage/files/3746861251625786204/budget201213.pdf
CALGreen (GC-1) Residential Checklist Table A4.602

A4.407.1 Install foundation and landscape drains. A4.407.2 Install gutter and downspout systems to route water at least 5 feet away from the foundation or connect to landscape drains which discharge to a dry well, sump, bioswale, rainwater
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/8533--GC-1 Residential CALGreen checklist.pdf
Attachment I : Section 5- Scope of Work

if available. D. Photographs of previously completed A/V equipment racks showing, in detail, cable routing and dressing. E. Sample Quality Assurance Program (QAP) and/or Factory Acceptance Test procedure (FAT) used on jobs of similar size and scope. F.
http://www.beverlyhills.org/cbhfiles/storage/files/10479625151551416730/SECTION5-SCOPEOFWORK.pdf
Tab 4 - Candidate's Statement Guidelines / Word Count Standards / Candidate Photograph / Sample of Candidate Statement Format

education through support for the Joint Powers Agreement and realignment of the subway route away from school buildings • Develop the right strategy to renew the Southeast of our City for its residents • Expand my traffic management plan to keep pass thru
http://www.beverlyhills.org/cbhfiles/storage/files/1911371336634120657/Tab4-CandidatesStatementGuidelinesetc.pdf
Specifications

to plant materials as possible. All mainline routing and pipe and wire sleeving will be as per the plans and as recommended by the contractor and agreed to by the City. - Providing Irrigation testing, adjusting and monitoring of all new systems.
http://www.beverlyhills.org/cbhfiles/storage/files/4092463011319944384/Specifications.pdf
01-22-14 Memo

additional Striping and signage.  Specifically designated lane for bicycles.  Identifies corridor as a bicycle route.  Potentially encourages additional bicycle use.  Reference Exhibits 1, 9, 10, 11, 12 Vegetated Medians
http://www.beverlyhills.org/cbhfiles/storage/files/90534684972559621/01-22-14Memo.pdf
<<   1 ...   18   19   20   21   22   ... 32   >>