73°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
Gateway FEIR Volume 1

City of Beverly Hills The Beverly Hills Gateway Project Final Environmental Impact Report Volume I: Report SCH # 2008011066 March 2011 The Beverly Hills Gateway Project Final
http://www.beverlyhills.org/cbhfiles/storage/files/373491083285715651/GatewayFEIRVol1.pdf
C1056 AUR La Cienega - Specs (Amd 5)

of Beverly Hills (COBH) to newly constructed system and hand over to COBH. 4. Duct Route, including associated manholes and vaults for Southern California Edison (SCE). Installation of cabling and splicing in the duct route will be performed by SCE.
http://www.beverlyhills.org/cbhfiles/storage/files/130603030161917600/C1056AURLaCienega-Specs(Amd5).pdf
Appendix A- Beverly Hills Municipal Code

or “taxicab” displayed on the exterior of the vehicle, and is used for the transportation of passengers for hire within and without the boundaries of the city, for which a fee is charged and that does not operate over a defined route. TAXIMETER:
http://www.beverlyhills.org/cbhfiles/storage/files/16522104571279552103/BHMC52814Draft.pdf
Proposed Annual Budget for Fiscal Year 2012/13

Scot W City tt G. Miller, N Don H William Cas Lucy G Carolyn y of B Propos Ph.D., Direc Noel Marqui Harrison, Bu strillon, Seni Gonzalez, Bu n Johnson, B City o 455 Nor Beverly Hil Beverl sed
http://www.beverlyhills.org/cbhfiles/storage/files/3746861251625786204/budget201213.pdf
Zoning Map

1133 1006 9475 0 1145 726 925 1121 400 919 255 821 624 400 406 1143 1150 9501 131 605 1174 810 720 1012 1187 1154 925 616 1181 906 916 717 1115 9340 1740 924 806 1007 1300 585 813 400 1162 514 1292 805 712
http://www.beverlyhills.org/cbhfiles/storage/files/64529851516564397/FinalZoningMap.pdf
EOP 2013 Finance and Administration Section

to the emergency/disaster. Ensure that all Compensation–for-injury and Claims logs and forms are complete and routed to the appropriate department for post-EOC processing. Ensure that the Personnel Unit of the Logistics Section completes claims for any injured
http://www.beverlyhills.org/cbhfiles/storage/files/247831114786401235/EOP2013FinanceAdminSection.pdf
EOP 2013 Finance and Administration Section

to the emergency/disaster. Ensure that all Compensation–for-injury and Claims logs and forms are complete and routed to the appropriate department for post-EOC processing. Ensure that the Personnel Unit of the Logistics Section completes claims for any injured
http://www.beverlyhills.org/cbhfiles/storage/files/140948815518545211/EOP2013FinanceAdminSection.pdf
01-22-14 Memo

additional Striping and signage.  Specifically designated lane for bicycles.  Identifies corridor as a bicycle route.  Potentially encourages additional bicycle use.  Reference Exhibits 1, 9, 10, 11, 12 Vegetated Medians
http://www.beverlyhills.org/cbhfiles/storage/files/90534684972559621/01-22-14Memo.pdf
City Accomplishments 2013

 Completed City-wide curb and lane striping program. 4  Implemented the City’s first two bicycle routes on Burton Way and Crescent Drive.  Installed 35 customized bicycle racks throughout the City.  Installed 40 bus benches
http://www.beverlyhills.org/cbhfiles/storage/files/367811229206579072/FY2013-14AccomplishmentsTK-CITYWIDE.pdf
CALGreen (GC-1) Residential Checklist Table A4.602

A4.407.1 Install foundation and landscape drains. A4.407.2 Install gutter and downspout systems to route water at least 5 feet away from the foundation or connect to landscape drains which discharge to a dry well, sump, bioswale, rainwater
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/8533--GC-1 Residential CALGreen checklist.pdf
<<   1 ...   18   19   20   21   22   ... 32   >>