59°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
CAFR 2007

CITY of BEVERLY HILLS STATE of CALIFORNIA COMPREHENSIVE ANNUAL FINANCIAL REPORT Year Ended June 30, 2007 Prepared by the Staff of the Administrative Services Department Under the Direction of Scott G. Miller, PhD, Director of Administrative
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/3502--CAFR_2007.pdf
Specifications

for further delivery directly to the testing laboratory. 2. Require the Certificates of Compliance to positively identify the cement as to production lot, bin or silo number, dating and routing of shipment, and compliance with the specified standards.
http://www.beverlyhills.org/cbhfiles/storage/files/3211046401233221773/Specifications-BIDSET_10.08.2015.pdf
Addendum #6- Revised Specifications

line diagrams showing plans, elevations, sections, details, splices, blockout requirement, entire route of each joint system, and attachments to other work. Where joint systems change planes, provide isometric or clearly detailed drawing depicting
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9774--blobdload.pdf
2014-01-08 Blue Ribbon Committee Meeting Memo

are also not reported. One study indicated that the addition of bicycle lanes on arterial streets is shown to reduce the risk of serious injuries by 30 percent. (Kay Teschke et al. 2012. Route Infrastructure and the Risk of Injuries Page
http://www.beverlyhills.org/cbhfiles/storage/files/1090632649119212680/01-08-14Memo.pdf
Beverly Hills/Metro Agreement for Utility Relocation Construction Mitigation

removed. (d) Detours: The City may consider limited, temporary street closures if necessary to accommodate Construction. If approved, street closures may occur during the hours provided for in this Agreement. Proposed detour routes must be submitted
http://www.beverlyhills.org/cbhfiles/storage/files/8424765591907964101/MOABH-METRO.pdf
EOP 2013 Operations Section Supporting Materials

broadcast stations. Presidential messages, national programming, and news will be routed over established network facilities of the broadcast industry. State programming will originate from the state operations center and will be transmitted
http://www.beverlyhills.org/cbhfiles/storage/files/1098826011872651343/EOP2013OperationsSectionSupportingDocumentation.pdf
EOP 2013 Operations Section Supporting Materials

broadcast stations. Presidential messages, national programming, and news will be routed over established network facilities of the broadcast industry. State programming will originate from the state operations center and will be transmitted
http://www.beverlyhills.org/cbhfiles/storage/files/195910589078263339/EOP2013OperationsSectionSupportingDocumentation.pdf
RFP Document

 Achievement of a score of at least 50% of the available points on each criterion listed under Evaluation of Proposals.  Existing facility within 20 miles, by the most direct route, of Beverly Hills City Hall where records will be maintained,
http://www.beverlyhills.org/cbhfiles/storage/files/1967224105935247127/BHTaxicabFranchiseRFP52814.pdf
Greystone Rehab Appendices F and G

This documentation shall be contained in the Training Manual. - END OF SECTION - APPENDIX G COBH APPROVED HEAVY HAUL TRUCK ROUTE MAP S ii .af r I a 4, 4 CD 0’ a z a 0 I 3 I \ \ / / 3IC, 0 x 49 49 0 o 0 ~ O~49) C- 49 49 4C 4, 4C 4’ C49 -dl V0
http://www.beverlyhills.org/cbhfiles/storage/files/417227924707120297/AppendicesFG.pdf
RFP Document

factors, and overall costs. b. Prepare a Technical Memorandum reviewing alternatives and recommending the optimal transmission pipeline route. c. Review draft with Owner and revise as required. Task 7.2 Establish Design Parameters After City has selected
http://www.beverlyhills.org/cbhfiles/storage/files/1232617161541721098/CityofBeverlyHills-WellPDRRFP_FINAL_combined.pdf
<<   1 ...   18   19   20   21   22   ... 39   >>