70°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
Exponent Report on Metro's Safety and Seismic Findings

Project is currently evaluating two tunnel alignment options through the Century City area, a southerly route associated with a station on Constellation Boulevard and a northerly route associated with a station on Santa Monica Boulevard. The choice
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/10153--Report - Assessment of Westside Subway Extension_Final.pdf
Sustainable City Plan

consider the effect on public health of certain land-use patterns. For example, if neighborhoods are pedestrian friendly and if services are close by, people will walk more. If there are safe bicycle routes and if secure bicycle parking is available
http://www.beverlyhills.org/cbhfiles/storage/files/24347783778629768/SustainableCityPlan.pdf
Specifications

with all pollution control regulations in effect at site for all materials, equipment and work procedures used on the Project. 1.10 TRAFFIC REGULATION A. Traffic maintenance: Determine the routing of construction vehicles before starting work, following
http://www.beverlyhills.org/cbhfiles/storage/files/19673906971624027855/SignageProjectManual13-11.pdf
Specifications

with all pollution control regulations in effect at site for all materials, equipment and work procedures used on the Project. 1.10 TRAFFIC REGULATION A. Traffic maintenance: Determine the routing of construction vehicles before starting work, following
http://www.beverlyhills.org/cbhfiles/storage/files/11302146431668068139/Specs.pdf
IFB C1056 Amendment No 2 - 3-20-14

route for Southern California Edison that are in conflict with the (future) construction of the Westside Subway Extension Project (by Others). The work is in the vicinity of Wilshire Blvd. / La Cienega Blvd in the City of Beverly Hills. Metro’s Project
http://www.beverlyhills.org/cbhfiles/storage/files/288124739759329695/IFBNo.C1056-Amendment2Issued3.20.14.pdf
EOP 2013 Planning and Intelligence Section Supporting Materials

submitted 8. Shutdown pipeline on El Paso St. Fire Branch 1600 Resource request submitted. 9. Advise dispatch to route all damage reports and inspection requests to Building and Safety. Police 1600 10. Develop critical resource list
http://www.beverlyhills.org/cbhfiles/storage/files/9126039241026565659/2013EOPPlanningIntelSupportingDocumentation.pdf
EOP 2013 Planning and Intelligence Section Supporting Materials

submitted 8. Shutdown pipeline on El Paso St. Fire Branch 1600 Resource request submitted. 9. Advise dispatch to route all damage reports and inspection requests to Building and Safety. Police 1600 10. Develop critical resource list
http://www.beverlyhills.org/cbhfiles/storage/files/929069709412902071/2013EOPPlanningIntelSupportingDocumentation.pdf
Specifications

as to production lot, bin or silo number, dating and routing of shipment, and compliance with the specified standards. 3. If so required by the Architect, promptly provide such other specific physical and chemical data as requested. B. Aggregate: 1.
http://www.beverlyhills.org/cbhfiles/storage/files/13034077851680021995/Specifications.pdf
Fire Hydrant Flushing Program 10/28/13 - 11/1/13

622 620 619 618 617 616 615 614 613 612 611 610 609 608 607 606 605 604 603 602 601 717 716 715 714 713 712 711 710 709 708 707 706 705 704 703 702 701 628 626 625 624 623 621 620 619 618 617 616 615 614
http://www.beverlyhills.org/cbhfiles/storage/files/13309924811705628733/WORKAREA8VENDOR-2013HYDRANTFLUSHINGPROGRAMWEB10-22-2013.pdf
Housing Element Appendix B

application will be made through the City’s Permit Center and routed to all applicable departments such as Fire and Engineering. A concept meeting is held with the applicant within 30 days from acceptance of a complete application.
http://www.beverlyhills.org/cbhfiles/storage/files/480213370983846779/2014-2021HEAppendixBPotentialConstraints.pdf
<<   1 ...   20   21   22   23   24   ... 31   >>