69°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
10-17-12 Synopsis

Motion by Chair Rubins; seconded by Commissioner Bernstein to return for restudy (4-0). Action: The project was returned for restudy. 5. Louis Vuitton — 201 & 295 North Rodeo Drive Request for approval of a façade remodel for both buildings and a sign
http://www.beverlyhills.org/cbhfiles/storage/files/5941913091791915118/10-17-12SY-WEB.pdf
205 Beverly Dr., S.

Griffith; Corinne ARCHITECT: Siple; Allen BUILDER: Snell; Fred C. DESCRIPTION: 205 Beverly A twin to 204 South Beverly on the east side of the street, this is a two story commercial building in the American Colonial Revival style. It is brick,
http://www.beverlyhills.org/cbhfiles/storage/files/643492909877665657/205S.BeverlyDr..PDF
City Council Rejects Roxbury Bids, Will Seek Public Input for Scaled-Back Plans

included building a new community center, new parking areas and landscaping. The community center plans incorporated a basketball gym, meeting rooms, a small satellite library and kitchen facilities. # # #
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9875--RoxburyBidsFINAL.pdf
Exponent Presentation to City Council 2-7-2012

to the LEL immediately beneath a school building…should require mitigation.” 17 Constellation Station - Profile BHHS Limited gas monitoring borings / test wells 900 feet 18 Abandoned Oil Wells (documented on DOGGR maps)
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/10174--Exponent CityCouncilMeeting_02-07-2012.pdf
3-1-2012 Agenda

the Traffic Signal Control Center Tour located at the Public Works Building.) AGENDA TRAFFIC & PARKING COMMISSION REGULAR MEETING March 1, 2012 9:00 a.m. ROLL CALL STUDY SESSION – 9:00 a.m.* 1. POLICE DEPARTMENT REPORT 2.
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/10258--3.1.12 Agenda_FINAL with City Clerk changes 2.24.12.pdf
Summary of Requirements For The Installation/Removal of Tie-Backs and Supporting Structures

in public rights of way for the purpose of providing lateral support for the public right of way during the construction period and permitting these structures to remain in the public right of way after completion of the building. Three Types
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/10442--Summary of Requirements for the Installation Removal of Tie-Backs and Supporting Structures 3-26-2012.pdf
City of Beverly Hills to Present Architectural Design Awards

(301 N. Rodeo Drive)  Rodeo Drive Large Retail – Louis Vuitton (295 N. Rodeo Drive) The Architectural Design Awards are presented to designers and architects for recently completed building renovations or new projects reviewed
http://www.beverlyhills.org/cbhfiles/storage/files/1655157714115899836/ArchDesignAwards2015.pdf
206 Beverly Dr., N.

and store buildIng designed originally In a I~Ioorish style but radically altered now. ~ nct~ facade has oblit erated the series of two story arches along Beverly Drive and substi tuted a ser~os of vertical stripes and meshwork, slats and a large neon
http://www.beverlyhills.org/cbhfiles/storage/files/986825552926963809/206N.BeverlyDr.(BeverlyTheater).PDF
2015 Special Olympics Final Leg Ceremony

towns and communities across the state to host the Flame of Hope as it is carried from the State Capitol building in Sacramento to the Los Angeles Memorial Coliseum for the Opening Ceremony of the 2015 Special Olympics World Games. The Law Enforcement
http://www.beverlyhills.org/cbhfiles/storage/files/117590546873305779/SpecialOlympicsTorchRun2015.pdf
Trousdale Notification of Hauling Form

Date Submitted: Assigned Project Building Inspector: ***This information needs to be submitted in its entirety
http://www.beverlyhills.org/cbhfiles/storage/files/7871829801325753070/24HOURNOTIFICATION.pdf
<<   1 ...   165   166   167   168   169   ... 275   >>