70°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
Executive Summary of Exponent Report on Metro's Seismic and Safety Findings

of such events to the public. Based on the findings reported in the Metro-sponsored reports and supporting review comments, momentum seems to be building against construction of a station on Santa Monica Boulevard based on perceived fault rupture hazards.
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/10155--Executive Summary - Assessment of Westside Subway Extension_Final.pdf
2-02-12 DRC Minutes

o The basic building fenestration needs to be resolved. The central portion of the project is awkward - perhaps consider a courtyard design. o The design contains two sections: the "U-shaped" outer portion and the central portion. The two sections need
http://www.beverlyhills.org/cbhfiles/storage/files/7210742591344925809/SignedMinutesFebruary2,2012.pdf
Health and Safety Commission Meeting Minutes - January 2012

in early February, which will allow them to assist in building the volunteer training cadre. 6. MONTHLY HEALTH AND SAFETY MESSAGES No discussion 7. REVIEW OF WORK PLAN FOR FY 2012-13 Due to the absence of three Commissioners at the December meeting,
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/10268--1.23.12.pdf
8-12-13 PC Minutes

Sutton Way (5-0). Action: The resolution was approved. 4. 8701 — 8707 Wilshire Boulevard Development Plan Review Request for a Development Plan Review to allow a remodel and addition to an existing three-story commercial building located at 8701 — 8707
http://www.beverlyhills.org/cbhfiles/storage/files/11629622221917258465/08-12-13PCMinutesSIGNED.pdf
918 Alpine Dr., N.

documents, surveys, personal interviews and their dates). City of Beverly Hills building permits See continuation sheet Beverly Hills City Directory, 1927 Architectural Digest, VII:2 22. Date form prepared November, 1986 By(name) C. McAvoy & L. T-Tpiim~nn
http://www.beverlyhills.org/cbhfiles/storage/files/6477908451237422337/918N.AlpineDr..PDF
10-19-11 Synopsis

Cohen-Rubins/7-0 Return for Restudy 6. MGM 245 North Beverly Drive Request for approval of a business identification sign, a parking directional sign and a sign accommodation for building identification signs (PL 112 3026) Motion 1 (Motion
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9672--10-19-2011 SY Final.pdf
Drawings- Electrical (1 of 2)

AN.T.S. ONE\ LINE\ DIAGRAM EB-T BUILDING ELECTRICAL\ TITLE SHEET ????????????? ???????????? ???????? ?????? ??????? ?????? ??????? ??????? ???? ? ? Interior\ Fixtures THIS\ ONE\ LINE\ DIAGRAM,\ ONE\ LINE\ DIAGRAM\ NOTES AND\ 'MS'\ \/\
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9581--elec 1.pdf
Working Outline

Set a maximum percentage of front façade area allowed in  one  building plane.  c. Set a minimum percentage of street‐facing façade plane  required to be horizontally or vertically offset from the  building plane.  d. Include other appropriate design standards that provide for 
http://www.beverlyhills.org/cbhfiles/storage/files/141739589184583667/2013-07-11Attachment2SFRBulkMassStudyOutlineDRAFTClean-ForCC2013-08-06.pdf
6-02-11 DRC Minutes

fence/walls appear to close off the building from the street. Consider removing these elements. );- The project lacks overall design and a hierarchy of elements. );- The moldings lack functionality and appear to be just surface decor. AYES: Commissioners
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9394--June Minutes.pdf
CALGreen (BM-B) Basis of Design Template

[Documentation of the Basis of Design (BOD) is a step required for compliance with 2010 CALGREEN Code, section 5.410.2.1, for newly constructed buildings greater than 10,000 sq. ft. This template is a guide for use by the design team.]
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/8623--BM-B BOD Template.pdf
<<   1 ...   184   185   186   187   188   ... 199   >>