Project Name:
La Cienega Well No. 1 and Transmission Main
Site Location:
Former Coffee Bean and Tee Leaf (CBTL) corporate headquarters owned by the City; 1956 Chariton St., 1945 & 1959 La Cienega Blvd. in Los Angeles.
Goal:
Drill a potable water well on the Chariton portion of the CBTL site. Convey water back to the BH treatment plant at 345 Foothill Road, Beverly Hills 90210; Decrease overall reliance on imported Metropolitan Water District (MWD) water supplies.
Water Main:
Approximately four (4) miles of water transmission main shall be constructed to convey groundwater from the proposed La Cienega Well No. 1 in the City of Los Angeles to the City's existing water treatment plant.
Please refer to the attached California Environmental Quality Act (CEQA) documents below to download.