GENERAL CONSTRUCTION INFORMATION


PRE-CONSTRUCTION MEETING

 Top of Page


All major projects in the City of Beverly Hills are required to have a preconstruction meeting with the City Building Official designees prior to the commencement of work. Certain building permits will not be issued until a pre-construction meeting is conducted. The Beverly Hills Municipal Code states under amendment to Section 305.9 titled Required Inspections And Tests. A pre-construction meeting with the city and the project personnel will be required prior to beginning any new building or when required by the city. Pre-construction meetings are required for projects determined to have an impact on the community, neighbors, or tenants.(Beverly Hills Municipal Code section 9-1-104 amends the Uniform Administrative Code section 305.9)

What is a pre-construction meeting?
A preconstruction meeting is a brief overview of City construction requirements and any additional project requirements that were necessary for the project approval. All involved City staff members use these meeting to introduce themselves as discipline contacts throughout the project and also discuss the specific criteria for each discipline to the home owner and hired construction team. Additionally, the meeting provides the construction team insight needed on how to schedule inspections, construction working hours, and requirements needed to prevent project delays.

How long is the pre-construction meeting? Meeting duration?
The pre-construction meeting is typically set for one (1) hour period. Larger projects may extend longer.

What is the pre-construction meeting Policy?
The City of Beverly Hills has established a pre-construction policy. View the pre-construction meeting policy.

What is pre-construction affidavit?
The pre-construction affidavit form is the document required to be signed by the attendants of the meeting. Click here to view the affidavit.

What is discussed during the pre-construction meeting?
Click here to view the preconstruction affidavit with agenda of discussion topics.

What projects require a Pre-Construction meeting?

  • Residential new construction projects
  • Large scale single family dwellings additions/alterations
  • Residential projects in the Hillside area
  • Projects requiring discretionary approval from Planning Division (e.g. CUP, DRC, DPR, PC, AC approval)
  • Commercial projects
  • Projects which require Construction Parking and Management plans
  • Any other project at the discretion of the Plan Review Engineer/Architect.

For more information view Pre-Construction Meeting Handout


CONSTRUCTION WORKING HOURS

Top of Page


Allowed Hours: Monday – Friday, 8:00 a.m. – 6:00 p.m.
After Hours:  By After Hour Permit only.  Must be at least 500 feet from a residential zone. See other requirements
No Construction activities are allowed on Sundays and Holidays. (Beverly Hills Municipal Code 8-2-11)

HOLIDAYS
Construction is restricted and is not allowed in observation of the following holidays.

  1. New Year's Day
  2. Memorial Day
  3. Independence Day
  4. Labor Day
  5. Thanksgiving Day
  6. Christmas Day

(Beverly Hills Municipal Code 5-1-206)

For more information view  Construction Working Hours


 

CONSTRUCTION SIGNS

Top of Page


Construction signs are defined as any sign that identifies the responsible contractor, architect, developer, etc., including name, address, and phone number of the identified professional.

 

  • Limitations on construction signs are summarized as follows:

 

 Zone Area

 Sign Restriction

  Code Section  

  Single Family Residential Zones   Not Allowed  10-4-404
  Multi-Family Residential Zones   Not to exceed 10 square feet    10-4-504
  Non Residential Zones (Commercial)      Not to exceed 50 square feet   10-4-612

 


 

NOTICE OF DEMOLITION AND CONSTRUCTION SIGNS

Top of Page

Should the City Building Official or designed representatives determine and provide a Notice of Demolition and Construction Sign for your project, the sign provided shall be and remain posted on the property in a location readily visible at all times. The sign must be filled out in its entirety and be maintained filled out throughout the duration of the project.  Maintenance shall include, but not be limited to, reprinting faded ink, fastening, visibility, etc…


(Beverly Hills Municipal Code 9-1-104 amending the Uniform Administrative Code by adding section 302.7)


 

BARRICADE IDENTIFICATION SIGNS

 Top of Page

Barricade Identification signs are defined as identifying the person responsible for the barricade and providing their name and telephone number in case of emergency.   

Limitations on barricade ID signs are summarized as follows:

 Zone Area 

Sign Restrictions 

Beverly Hills Municipal    Code Section 

 Single Family Residential Zones Not Allowed  10-4-404
 Multi-Family Residential Zones One sign not to exceed one square foot in area indicating name and telephone number of the person to contact in case of emergency.   10-4-510
 Non-Residential Zones (Commercial) One sign not to exceed one square foot in area indicating name and telephone number of the person to contact in case of emergency.  10-4-612(C)


 

BUSINESS IDENTIFICATION SIGNS DURING CONSTRUCTION REMODELS   Top of Page

Business Identification signs are defined as signs used for indicating that a business remains open during remodeling. 

Provisions for business ID signs are summarized as follows:

  • When a business remains open while remodeling its premises, and a construction barricade is required, one large business identification sign may be placed on the construction barricade adjacent to the entrance to the business.
  • This sign shall not exceed twelve (12) square feet in area. For example, a 3’x4’ sign would be okay, but a 3’x5’ sign would not. 

The sign may only contain:

  • The name of the business
  • A company logo
  • The fact that the business is remaining opening during the remodeling.
  • An advertisement for a new business coming to the site, containing only the name of the business, a company logo, and the opening date of the business.*

*If a large business identification sign contains an advertisement for a new business, no real estate sign shall be allowed in front of the building, lot or parcel, or placed on the construction barricade.

In addition to the one permitted large business identification sign, small additional business identification signs are also permitted under the following conditions:

 

  • One sign may be placed on each side of the construction barricade, perpendicular to the street façade, facing a sidewalk or other pedestrian access through the barricade. 
  • The signs may state only the name of the business and the fact that it is open for business during the remodeling.
  • These signs shall not exceed two (2) square feet in area. For example, a 2’x1’ sign would be okay, but a 2’x2 sign’ would not. 

View the Beverly Hills Municipal Code Section 10-4-612 for businesses that remain open during remodel and require a barridace.


 

CONSTRUCTION DOCUMENTATION

 Top of Page

Approved Plans, Issued Permits, Inspection Record Card, and other approved construction documents shall be maintained on the construction site at all times and shall be made readily available for the City Building Official, Building Inspectors, or designated representatives.


 

CONSTRUCTION FENCE

 Top of Page

A screened security fence shall be installed on all construction projects. Fences shall comply with the following requirements and these requirements shall be detailed on the fencing plan submitted for permit.

 

  1. A six (6) foot high chain link fence with a mesh screen cover of a neutral color (e.g. green) shall be placed around the entire perimeter of the site.
  2. The fence shall be placed on or adjacent to the property line on all sides of the property. The side of the chain link fence facing the street shall be setback two (2) feet from any property line with a street front.
  3. A three (3) foot pedestrian gate access door shall be placed swinging into the property from the alley.  In the case that there is not an alley, the pedestrian gate shall be placed where access is provided from the street front of the property.
  4. A rolling gate shall be placed as an opening in the fence wherever there is a driveway approach entering the lot.  The size of the gate shall not be larger in width than that of the driveway. The rolling gate door shall not be of the swinging type.
  5. Any landscaping in the front yard setback and parkway shall be maintained throughout the course of construction.
  6. The landscaping in the front yard setback and parkway shall be maintained by an automatic irrigation system.

Download the Construction Fence Requirements PDF


 

TREE PROTECTION 

 Top of Page

Trees located on the sidewalk or parkway directly in front of a construction site must be protected from being damaged by construction activity.  Native and Heritage trees located on private property are also required to be protected on private property.  Protection of trees must be in accordance with an arborist’s recommendation for the specified tree species found on the project.

 

  • Trees are required to be protected from construction activities during the duration of the construction project
  • Changing, damaging, moving, trimming, or generally interfering with trees on public property, including parkways, is prohibited
  • Native trees, city parkway trees, and historical trees must be protected (Beverly Hills Municipal Code 5-6-1001)
  • A screened security fence shall be installed on all construction projects. Fences shall comply with the following requirements and these requirements shall be detailed on the fencing plan submitted for permit. (Beverly Hills Municipal Code 10-3-4203, 10-3-2905)

 

SITE MAINTENANCE

 Top of Page

Properties with construction and the right or way abutting such properties in the City shall be kept and maintained in a safe, clean, orderly, sanitary and aesthetic condition.

  • Construction debris should not be stored on the property in excess amounts.
  • Food and food wrappings should be maintained in a trash container with a lid at all times
  • Construction related personnel shall not litter on public or neighboring private property.
  • Dust control is required on all construction projects.
  • The Public Parkway Maintenance shall be maintained by the owner/general contractor throughout the construction project as required by Beverly Hills Municipal Code.

Beverly Hills Municipal Code Section 5-7-3: Maintenance of Premises and Adjacent Public Right-of-Way


 

CONSTRUCTION PROJECT DAILY MAINTENANCE CHECKLIST

 Top of Page

Building and Safety provides contractors with the following checklist to assist in proper site maintenance throughout the duration of construction. It is the responsibility of the property owner and general contractor to maintain a clean and orderly property throughout any construction activity. This checklist contains the most common issues related to construction sites.

Download the Construction Project Daily Maintenance Checklist


 

MAINTENANCE OF THE PUBLIC RIGHT-OF-WAY

 Top of Page

Construction activities cannot;

  • block streets, alleys, or sidewalks with material, equipment, or dug up material unless a Right-of-Way Use permit is issued.
  • interfere with traffic in any street or alley unless a Street Use permit is issued
  • block traffic with construction or delivery vehicles near the entrance of a construction site
  • Should construction interferes with or is dangerous to pedestrians, a walkway should be constructed under a Right-of-Way use permit.

Beverly Hills Municipal Code Section 8-2-11

For more information view Maintenance of the Public Right-Of-Way  


 

TEMPORARY WATER SERVICE & DUST CONTROL

Top of Page

It is required that all construction sites maintain water service to the project during all phases to mitigate dust and maintain the public parkway landscape.

Important Note: It is the owner's and/or general contractor's responsibility to have the appropriate water source sized to provide the demanded needs of the proposed project. Projects with grading and compaction may required larger sized water sources.


 

STORM & WASTE WATER ORDINANCE / DUMPING IN THE STREET

 Top of Page

The following requirements apply to all construction projects in the city and must apply at the time of demolition or the beginning of construction until a certificate of occupancy is received:

  • Sediment, construction waste, and other pollutants from construction sites and parking areas must be kept on the site as much as possible.
  • Any sediment or other materials not kept on the site must be removed the same day, unless the director of the department of public works approves installation of a temporary sediment barrier.
  • Only in the case of an emergency, a plastic covering may be used to prevent erosion of an unprotected area, along with runoff devices to safely divert the runoff.
  • Dug-up soil must be located on the site in a way that minimizes the amount of sediments running into the street or neighboring properties. Soil piles must be covered until the soil is either used or removed.
  • Washing construction or other vehicles next to a construction site is prohibited. No water from washing vehicles on a construction site is allowed to run off into the city’s storm drain system.
  • Drainage controls must be used as needed, depending on the extend of proposed grading and topography of the site, such as:
    • Detention ponds, sediment ponds, or infiltration pits
    • Dikes, filter berms, or ditches
    • Down drains, chutes, or flumes


Beverly Hills Municipal Code 9-4-507

For more information view Storm & Waste Water Ordinance/Dumping in the Street   

 


TEMPORARY POWER POLES

 Top of Page

  • Require a Temporary Power Pole (Electrical) permit prior to installation and inspections.
  • Shall be properly secured and erected.
  • Shall be grounded as required by Code
  • Shall be accessible with required working clearances throughout construction
  • Electrical outlet connections shall be properly wired and secured as required by code.

Temporary utility service will be released directly to the utility company by the City Inspector once the work has been permitted, installed in accordance with applicable codes and inspected.


TEMPORARY TOILET FACILITIES

 Top of Page

“Porta Potty”, Portable Toilet Facilities Required During Construction. Before the start of construction of any building or structure, and before any remodel where all toilet facilities are temporarily removed, a temporary water-flushed or approved chemical toilet shall be installed for the use of the workers and shall comply with all of the following requirements:

  • Such temporary toilet shall be maintained throughout the construction of the building or structure;
  • If a water-flushed toilet is used, such toilet shall be connected to the sewer, and tile pipe without a vent may be used for the installation;
  • Such temporary toilet shall be located within twenty-five (25') feet of the rear property line and shall be set back at least twenty (20) feet from any other property line unless the city building official approves an alternate location because the requirements of this subsection prevent servicing the toilet or are otherwise infeasible;
  • Such temporary toilet shall not be located on public property without the approval of the director of public works.

(Beverly Hills Municipal Code 9-1-104 amending Uniform Administrative Code by adding section 311)


 

CONSTRUCTION PARKING PLAN

 Top of Page

The City approved construction parking plan must be followed at every stage of construction.  Special equipment and deliveries must drive entirely on site to load and unload. If site conditions do not permit on site deliveries a Street Use Permit is required.

Construction project related vehicles are not allowed to park on streets of residential zones and must conform to the City-approved construction parking plan which may require shuttling plans.

(Beverly Hills Municipal Code 9-1-104 amending the Uniform Administrative Code by adding section 302.8)

For more information view Construction Parking Plan 

 


OPEN EXCAVATIONS AND EXISTING POOLS ON CONSTRUCTION PROJECTS

 Top of Page

Pools and Open Excavations on construction projects shall be secured by providing a temporary fence barrier as required by Local Codes and/or CAL OSHA.

 For more information view Open Excavations & Exisiting Pools On Construction Projects 

 


 

NOISE ORDINANCE

 Top of Page

Noise level at the property line for newly installed or replaced equipment on the property shall not exceed the ambient noise level by more than five (5) decibels. 

(Beverly Hills Municipal Code 5-1-202)

For more information view Noise Ordinance 

 


 

ROOFING MATERIALS

 Top of Page

All roofing materials for City of Beverly Hills properties are required to be fire retardant Class A. Provisions in the code require all properties to have Class A roof materials installed by July 1, 2013.

(Beverly Hills Municipal Code 9-1-202 amending California Building Code section 1505.1.1

For more information view Roofing Materials 


 

ROOF TOP EQUIPMENT

 Top of Page

Equipment Enclosures. Operating equipment, including associated ducting, located on the roof of a building shall be enclosed so as to be shielded from view in a horizontal plane or lower and so as to comply with the noise abatement provisions of Chapter 1 of Title 5 of the Beverly Hills Municipal Code. The enclosure finish shall match that of the building exterior walls. Enclosures on buildings with non-residential uses shall be of non-combustible, opaque material.

(Beverly Hills Municipal Code 9-1-202 amending the California Building Code by adding section 1509.6)

For more information view Roof Top Equipment 


TENANT NOTIFICATION OF PENDING CONSTRUCTION

 Top of Page

Before a permit can be issued for the alteration/repair/rehabilitation of a building which required an applicant to prepare a construction means and method plan pursuant to section 302.2.2 of this chapter, the applicant must certify that all tenants of the property will receive the information required by subsection (b) of this section, in a form approved by the city, within ten days following the issuance of the permit and that no work will commence under the permit until ten days after all tenants are notified. This notice shall either be hand-delivered to each tenant of the property or sent by certified mail, return receipt requested.

(Beverly Hills Municipal Code 9-1-104 amending the Uniform Administrative Code by adding section 302.2.5)

For more information view Tenant Notification of Pending Construction


 

SPECIAL INSPECTION REQUIREMENTS

 Top of Page

Special Inspections. The special inspector shall be a qualified person who shall demonstrate competence to the satisfaction of the Director of Building and Safety, for inspecting the particular type of construction or operation requiring special inspections, and shall possess a current certification by an agency approved by the city.

(Beverly Hills Municipal Code 9-1-104 amending the Uniform Administrative Code section 306.2)

For more information view Special Inspection Requirements 


 

REQUIRED REPORTS AND CERTIFICATIONS

 Top of Page

 

  1. For all new construction and when required by the city, a licensed surveyor must certify that the location of the footing forms is per the approved plans before foundations can be poured. The surveyor must provide a plot plan showing precise dimensions to the property lines and the elevation of the forms as compared with the reference elevation shown on the approved plans.
  2. For all new construction and when required by the city, a licensed surveyor must certify that the height of the building is in accordance with the approved plans. The surveyor must show the precise height of the building as compared with the reference elevation shown on the approved plans.
  3. An approved weatherproofing consultant must certify the installation of weatherproofing on all retaining walls which are adjacent to interior areas of the building. The consultant will not be required if the installer is certified in writing by the manufacturer.
  4. For all new construction and when required by the city, an approved weatherproofing consultant must certify that the weatherproofing elements of the building have been installed in accordance with the approved plans, all relevant codes, and per manufacturers specifications. At a minimum, an inspection and report will be required before plastering begins and before final approval is granted.

(Beverly Hills Municipal Code 9-1-104 amending the Uniform Administrative Code by adding section 305.9)

For more information view Required Reports And Certificates 


BONDS

 Top of Page

Bonds Required. The City Building Official may require the posting of a bond prior to issuance of a permit where the nature of the work, if commenced and allowed to remain in an uncompleted state, would create a hazard to human life or endanger adjoining or other property, any street or street improvement, or any other public property. The bond shall be in an amount sufficient to cover the cost of eliminating any dangerous condition or geological hazard if the project is not properly performed or is not completed in a timely manner. The bond shall comply with the provisions of Title 3, chapter 4 of the Beverly Hills municipal code.

(Beverly Hills Municipal Code 9-1-203 amending the California Building Code Appendix section by adding J113.1)


 

TEMPORARY CERTIFICATE OF OCCUPANCY

 Top of Page

Temporary Certificate. If the Director of Building and Safety finds that no substantial hazard will result from occupancy of any building or portion thereof before the same is completed, the Director may issue a temporary certificate of occupancy for the use of a portion or portions of a building or structure prior to the completion of the entire building or structure; provided a cash deposit is made in accordance with section 310. Applications for a temporary certificate of occupancy shall be submitted with the required fee in accordance with city council resolution and shall be paid prior to issuance.

(Beverly Hills Municipal Code 9-1-104 amending the Uniform Administrative Code section 309.4)


 

SWIMMING POOL ENCLOSURE

 Top of Page

Swimming Pool Enclosure. It shall be unlawful for any person, within the city, to construct, install or maintain in the city a swimming pool or excavation unless the same is enclosed or protected from entrance thereto by the following protective facilities or by other facilities equally sufficient for the purpose of protecting the public, particularly children, from the hazards of swimming pools and excavations. All swimming pools and excavations shall be enclosed by a fence or wall not less than five (5') feet in height above the underlying ground. Walls of dwelling and accessory buildings may be used to form part of the enclosure herein above required.

(Beverly Hills Municipal Code 9-1-602 amending the Uniform Swimming Pool, Spa, and Hot Tub Code section 328.1)

For more information view Swimming Pool Enclosure 


 

CONTACT MY BUILDING INSPECTOR

 Top of Page

Visit our Inspection Staff Directory webpage to contact Building & Safety Staff by Email or Telephone.


 

ELECTRONICALLY SUBMIT YOUR CONSTRUCTION FIELD REPORTS

Top of Page

Visit our Electronic Field Reports webpages webpage to learn more on how you can submit your construction field reports and documents electronically to the Building & Safety Division by Email.

 