70°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
Construction Means & Method Plan Form

the impacts of noise, dust, vibrations, utility shut-offs, and other construction impacts on tenants. ______________________________________________________________ ______________________________________________________________
http://www.beverlyhills.org/cbhfiles/storage/files/4996364271574103502/MEANSANDMETHODPLANFORTHETENANT_2_.pdf
Construction Means & Method Plan Form

the impacts of noise, dust, vibrations, utility shut-offs, and other construction impacts on tenants. ______________________________________________________________ ______________________________________________________________
http://www.beverlyhills.org/cbhfiles/storage/files/6734110951491302909/MEANSANDMETHODPLANFORTHETENANT_2_.pdf
Supplemental Accessibility No. 3 Plan Review Checklist

shall be made accessible. (1105B.3.5.4) F. PUBLIC UTILITY FACILITIES NOTE: Facilities located in operational areas which would not have any reasonable availability to or usage by persons who use wheelchairs for mobility are not subject
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/5169--2008 LARUCP Plan Review List - Supplemental Accessibility No 3 v1.0.pdf
BID TAB 10-4-11

951 600 1,800 560 1,680 1,000 3,000 616 1,848 28 DISCONNECT AND REMOVE ONE UTILITY POWER PEDESTAL AND CONCRETE PAD EA
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9537--BID TAB_Bid 12-11_10-4-11.pdf
Addendum #1

measures, apparatus and services required to prosecute the Work of this bid package while maintaining legal egress for pedestrians and safe drive access for motorists. 3.6 All utility service and building system connections or required interruptions
http://www.beverlyhills.org/cbhfiles/storage/files/522225718158009437/Addendum1.pdf
3-01-12 DRC Minutes

modulation which can be done with columns and other elements typical of the Neo­ Classical style. > A Neo-Classical design needs to utilize the classical order and related ratios in a serious manner. > The height of the columns are out of proportion
http://www.beverlyhills.org/cbhfiles/storage/files/5900466491426205956/SignedMinutesMarch1,2012.pdf
EOP 2013 Introduction

for reasonable emergency actions and will commit all available resources, as necessary, to save lives, minimize injury to persons, and minimize damage to property and the environment. The City of Beverly Hills will utilize SEMS & NIMS in emergency response
http://www.beverlyhills.org/cbhfiles/storage/files/8472902831933138129/EOP2013Introduction.pdf
October 17, 2013

terminate one's utilities. The public is advised to ask for the caller's phone number, the name of their supervisor and state that they will call them back later. 3. One hate crime reported. 4. On October 26, toarn - 2pm, in front of the Beverly Hills
http://www.beverlyhills.org/cbhfiles/storage/files/11737076581753692894/October17,2013.pdf
Notice To Bidders: Reservoir #4A

1 5 Trench Safety Measures (OSHA) LS 1 6 Construction Survey Staking and Potholing for Existing Utilities LS 1 7 As-Built Drawings LS 1 8A Furnish and Install 12 inch Epoxy Lined and Epoxy Coated Steel Pipe (on steel pipe supports per plan) Complete
http://www.beverlyhills.org/cbhfiles/storage/files/1388360133783614773/NOTICEINVITINGBIDS-OVERFLOWPIPEDEC4.pdf
EOP 2013 Introduction

for reasonable emergency actions and will commit all available resources, as necessary, to save lives, minimize injury to persons, and minimize damage to property and the environment. The City of Beverly Hills will utilize SEMS & NIMS in emergency response
http://www.beverlyhills.org/cbhfiles/storage/files/10694923321486948463/EOP2013Introduction.pdf
<<   1 ...   87   88   89   90   91   ... 105   >>