69°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
Water Enterprise Plan Report

includes ten active reservoirs located within thirteen pressure zones. Approximately 90 percent of Beverly Hills’ water supply comes from two connections off of MWD’s 54-inch diameter supply pipeline, which is typically fed from the Santa Monica Feeder
http://www.beverlyhills.org/cbhfiles/storage/files/13699920851488612043/FINALPsomasCBHWEPReport_08102015V2.pdf
Specifications

The Contractor shall provide the City a copy of the office calculations and documents submitted to the County for filing in connection with the aforementioned work. The payment for surveying, related professional services, office calculation, and furnishing all
http://www.beverlyhills.org/cbhfiles/storage/files/8191376561002163397/BidNo15-31Specifications2015-04-28.pdf
C1056 AUR La Cienega - Specs (Amd 5)

B POTHOLING AND TRENCHING DATA APPENDIX C CITY OF BEVERLY HILLS ( COBH) TECHNICAL SPECIFICATIONS FOR DUCTILE IRON (DI) PIPE ADDED APPENDIX D TECHNICAL SPECIFICATIONS FOR WATER ADDED Amendment 5: 04/30/14 Summary of Work
http://www.beverlyhills.org/cbhfiles/storage/files/130603030161917600/C1056AURLaCienega-Specs(Amd5).pdf
Fact Sheet - Water Samples 2013

FACT SHEET - Presence of Coliform Bacteria in Beverly Hills Water Samples Samples of Beverly Hills drinking water taken in December showed the presence of the common, generally non-harmful coliform bacteria that registered slightly
http://www.beverlyhills.org/cbhfiles/storage/files/105923974987948910/FACTSHEETWaterSamples2013.pdf
Staff Report 7-2-2013

the bicycle Street markings, and/or pursue future routes to connect to adjacent bicycle networks. DISCUSSION Approximately 900 Construction Notices were mailed on June 10, 2013 to residents and businesses located on Burton Way and North Crescent Drive within
http://www.beverlyhills.org/cbhfiles/storage/files/732093381966803590/StaffReportPilotBicycleRoute7-2-2013.pdf
Power Outages

Southern California Edison- Homepage Southern California Edison- Outage Center
http://www.beverlyhills.org/living/emergencymanagement/emergencypreparedness/poweroutages
Specifications- Irrigation

work necessary to carry out the intent of this irrigation specification and irrigation drawings including the following: a. Furnish and install all pipelines and fittings. b. Furnish and install automatic controller, all electrical connections
http://www.beverlyhills.org/cbhfiles/storage/files/9969727391891359900/328400-Irrigation.pdf
Addendum No. 1

all pipelines and fittings. b. Furnish and install automatic controller, all electrical connections and control wiring. c. Furnish, assemble, and install material described in this specification and as indicated on the drawings. d. Excavate
http://www.beverlyhills.org/cbhfiles/storage/files/5326832911327907882/AddendumNo1.pdf
City Informs Residents of Traces of Non-Harmful Coliform Bacteria in Beverly Hills Drinking Water

of Traces of Non-Harmful Coliform Bacteria in Beverly Hills Drinking Water Beverly Hills, CA – Samples of Beverly Hills drinking water taken in December showed the presence of the common, generally non-harmful coliform bacteria that registered
http://www.beverlyhills.org/cbhfiles/storage/files/177378510715411140/WaterQualityReleaseFINAL.pdf
Beverly Hills City Council Gives Final Approval to Beverly Hilton Revitalization Project

and Wilshire boulevards by the developer. For further information about the project, visit the City’s website at www.beverlyhills.org and click on ‘Beverly Hilton Revitalization Plan’ on the homepage or call the Community Development Department at (310)
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/3243--Hilton_Final project approval51208FINAL.pdf
<<   1   2   3   4   5   ... 56   >>