60°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
Demolition Requirements

or contractor shall obtain a Heavy Hauling Permit from the Public Works Department. The permit shall specify hauling routes and other traffic related conditions as deemed necessary.  Grading permit is required when any excavation exceeds two (2) feet
http://www.beverlyhills.org/cbhfiles/storage/files/333056625440296544/demolitionhandout.pdf
Bid Package

or the verification of information. The system must provide touch screen navigation for the police application GUI. The system must provide for the ability to run “covert” hotlists for gang investigations, organized crime, or other details. If so deployed
http://www.beverlyhills.org/cbhfiles/storage/files/405876319306548843/ALPRFixedSiteBid2-1MulticameraSystemPDFcopy.pdf
01-08-14 Memo

are also not reported. One study indicated that the addition of bicycle lanes on arterial streets is shown to reduce the risk of serious injuries by 30 percent. (Kay Teschke et al. 2012. Route Infrastructure and the Risk of Injuries Page
http://www.beverlyhills.org/cbhfiles/storage/files/1090632649119212680/01-08-14Memo.pdf
Addendum #6- Revised Specifications

line diagrams showing plans, elevations, sections, details, splices, blockout requirement, entire route of each joint system, and attachments to other work. Where joint systems change planes, provide isometric or clearly detailed drawing depicting
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9774--blobdload.pdf
Beverly Hills/Metro Agreement for Utility Relocation Construction Mitigation

removed. (d) Detours: The City may consider limited, temporary street closures if necessary to accommodate Construction. If approved, street closures may occur during the hours provided for in this Agreement. Proposed detour routes must be submitted
http://www.beverlyhills.org/cbhfiles/storage/files/8424765591907964101/MOABH-METRO.pdf
EOP 2013 Operations Section Supporting Materials

broadcast stations. Presidential messages, national programming, and news will be routed over established network facilities of the broadcast industry. State programming will originate from the state operations center and will be transmitted
http://www.beverlyhills.org/cbhfiles/storage/files/195910589078263339/EOP2013OperationsSectionSupportingDocumentation.pdf
EOP 2013 Operations Section Supporting Materials

broadcast stations. Presidential messages, national programming, and news will be routed over established network facilities of the broadcast industry. State programming will originate from the state operations center and will be transmitted
http://www.beverlyhills.org/cbhfiles/storage/files/1098826011872651343/EOP2013OperationsSectionSupportingDocumentation.pdf
FY 2010-11 CIP Budget

2,288,277 2,175,000 2,175,000 2,175,000 2,175,000 10,988,277 351 PARKING REVENUE AUDIT PROGRAM 405,000 0 0 0 0 0 0 367 INSTALL TRAFFIC SIGNALS 377,000 2,003,571 1,433,000 403,000 403,000 403,000 4,645,571 402 STREETSCAPE DEMONSTRATION 19,683 28,746
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/7716--FY 2010-11 CIP BUDGET BOOK Vol 2 - FINAL 2.pdf
2010-11 Mid-Year Budget Status Report - Vol 2

1,433,000 403,000 403,000 403,000 4,645,571 402 STREETSCAPE DEMONSTRATION 19,683 28,746 0 0 0 0 28,746 629 STREET LIGHT REPLACEMENT PROJECT 9,730,000 411,358 0 0 0 0 411,358 701 IMPROVEMENT OF CITY GATEWAYS 446,505 1,639,849 1,150,000 500,000
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/8336--volume 2 - condensed.pdf
Notice to Bidders

BH 403 Traffic Signal Detector Handhole BH 404 Traffic Signal Pull Box and Lid Section V Landscaping and Irrigation BH 501 Not Used Section VI General Facilities BH 601 Parking Space Markings BH 602 Crosswalks BH 603 Speed Hump
http://www.beverlyhills.org/cbhfiles/storage/files/15195252441561885377/NoticetoBidders.pdf
<<   1 ...   22   23   24   25   26   ... 35   >>